Contract: ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
Primary Recipient
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
Amount
$19,531.49
Award Date
8/06/2009
Administering Agency
General Services Administration / Public Buildings Service
CDFA Number
CDFA Program Title
Description
Updated the design of HVAC system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based on as-builts from Replace Perimeter H
Recipients Connected to Award
Recipient | Role | Amount |
---|---|---|
LEO A DALY COMPANY | Sub-recipient | $16,802.20 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | Primary recipient | $2,729.29 |