Contract: ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
Primary Recipient
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
Amount
$247,742.41
Award Date
10/15/2009
Administering Agency
General Services Administration / Public Buildings Service
CDFA Number
CDFA Program Title
Description
Update building systems based on an energy study prepared by Energy Management Control Engineers for the Robert Denny Buidling, Lincoln, Nebraska. The individual items studied (Energy Conservation Measure-1 througth Energy Conservation Measure-9) are sum
Recipients Connected to Award
Recipient | Role | Amount |
---|---|---|
MORRISSEY ENGINEERING INC | Sub-recipient | $165,672.36 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | Primary recipient | $69,330.50 |
PERFORMANCE ENGINEERING, INC. | Sub-recipient | $12,739.55 |