Contract: ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
Primary Recipient
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
Amount
$45,613.86
Award Date
12/18/2009
Administering Agency
General Services Administration / Public Buildings Service
CDFA Number
CDFA Program Title
Description
Updated the design of Heating, Ventilation, and Air Conditioning system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based
Recipients Connected to Award
Recipient | Role | Amount |
---|---|---|
LEO A DALY COMPANY | Sub-recipient | $24,312.29 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | Primary recipient | $21,301.57 |