Contract: LJM ENGINEERING GROUP INC
Primary Recipient
LJM ENGINEERING GROUP INC
Amount
$33,270.20
Award Date
5/04/2009
Administering Agency
Department of Veterans Affairs
CDFA Number
CDFA Program Title
Description
Design to replace existing main water line, extending out to the street and its associated valves. Design to replace the sprinkler line fed from the main water line. Design to install new main water meter. Design to install new back flow preventer. De