Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Ketchikan Gateway County, Alaska, funds by Agriculture, Department of

Listing $7,021,486.03 in stimulus funds from Agriculture, Department of for Ketchikan Gateway

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MULTIPLE RECIPIENTS $1,366,192 Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA Rural Housing Service 8/31/2009
KETCHIKAN READY-MIX & QUARRY, INC. $1,084,957 Road Storage project - closing logging road access down. Install bridges and pipe. Roadway conditioning, drainage etc. Two new positions created, four jobs preserved. Work will start approx. August 2010. 10 hours applied to paperwork so far this quarter. Forest Service 3/30/2010
KETCHIKAN READY-MIX & QUARRY, INC. $913,394 Original Contract - $421,700.00 Mod added 491,694.00 Road Surfacing contract, Petersburg AK Resurfacing Forest Service roads with rock, installing new culvert in road. Producing stockpile of rock for future resurfacing. Quarry Development. Forest Service 5/19/2009
TFAB GROUND SYSTEMS, LLC $579,457 Discovery Center Biomass Conversion- 50 Main Street (downtown ) Ketchikan, AK. This project is to provide a wood fired boiler, wood storage, all appurtenances and connections for use as primary heat source for entire Discovery Center building. Forest Service 9/14/2010
OREGON WOODS, INC. $488,450 Reconstruction of Upper Silvas Lake Trail; work includes stone pitching, stone steps, flly bench trail construction, blasting, and aggregate surfacing. Forest Service 5/14/2010
TFAB GROUND SYSTEMS, LLC $479,286 RECOVERY-DISCOVERY CENTER DEFFERRED MAINTENANCE; Design, furnish and construct deferred Maintenance as follows: theater air conditioner design and equipment installation, clean outside supply air louvers (2), repair multiple exterior Sidewalk/Ramp, replac Forest Service 9/16/2010
KETCHIKAN READY-MIX & QUARRY, INC. $458,687 Fish Pipe repair - Installing new culvert, removing old culvert, installing bridge, road reconditioning. Forest Service 2/02/2010
KETCHIKAN READY-MIX & QUARRY, INC. $401,070 Fish pipe work, mobilization Install 40' glulam bridge over stream. Forest Service 2/02/2010
KETCHIKAN READY-MIX & QUARRY, INC. $359,000 25 Bridge sites - repairs Refurbish bridge structures on prince of wales island, AK Forest Service 12/29/2009
OREGON WOODS, INC. $202,500 Supply ground crew for helicopter delivery of construction supplies. Forest Service 5/11/2010
OPPORTUNITY INC. $200,000 Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA Rural Housing Service 9/18/2009
KETCHIKAN GATEWAY BOROUGH $99,000 Rural Business Enterprise Grants - ARRA USDA Rural Business Enterprise Grant establishing a Ketchikan Gateway Borough Loan Fund Rural Business Cooperative Service 4/12/2010
KETCHIKAN GATEWAY BOROUGH $99,000 Rural Business Enterprise Grants - ARRA USDA Rural Business Enterprise Grant--Ketchikan Region Loan Fund Rural Business Cooperative Service 4/12/2010
KETCHIKAN READY-MIX & QUARRY, INC. $96,222 Repair to seven bridge sites, concrete work, mobilization. Replaced rotted wood, stabilized bridges. Forest Service 12/30/2009
BURNETTE, KYLE $61,888 Work includes furnishing all materials, equipment, and labor required to rehabilitate approximately 1.4 miles of trail. Work includes installation of up to 16 trail bridges with curbs or rails, improvement of existing waterbars for easier access, adding a Forest Service 4/07/2010
BURNETTE, KYLE $61,888 20 Mile Trail Rehabilitation Work includes furnishing all materials, equipment, and labor required to rehabilitate approximately 1.4 miles of trail. Work includes installation of 16 trail bridges with curbs or rails, improvement of existing waterbars for Forest Service 4/07/2010
BURNETTE, KYLE $29,100 Perserverance Trail Stone and Gravel Supply: D-1 gravel and stepping stones to be supplied and loaded into government-furnished helicopter bags and delivered to the helicopter staging area. Forest Service 3/19/2010
TOWNE ENTERPRISE'S LLC $16,050 Apartment Rental Lease/Rent of family housing Forest Service 3/29/2010
MULTIPLE RECIPIENTS $7,770 Trade Adjustment Assistance Trade Adjustment Assist; To provide tech assist & cash benefits to farmers & fishermen if increased imports contrib importantly to a price decline Foreign Agricultural Service 2/28/2012
MULTIPLE RECIPIENTS $5,828 Trade Adjustment Assistance Trade Adjustment Assist; To provide tech assist & cash benefits to farmers & fishermen if increased imports contrib importantly to a price decline Foreign Agricultural Service 9/30/2011
MULTIPLE RECIPIENTS $5,828 Trade Adjustment Assistance Trade Adjustment Assist; To provide tech assist & cash benefits to farmers & fishermen if increased imports contrib importantly to a price decline Foreign Agricultural Service 3/31/2012
MULTIPLE RECIPIENTS $2,035 Trade Adjustment Assistance Trade Adjustment Assist; To provide tech assist & cash benefits to farmers & fishermen if increased imports contrib importantly to a price decline Foreign Agricultural Service 9/30/2011
MULTIPLE RECIPIENTS $1,942 Trade Adjustment Assistance Trade Adjustment Assist; To provide tech assist & cash benefits to farmers & fishermen if increased imports contrib importantly to a price decline Foreign Agricultural Service 10/31/2011
MULTIPLE RECIPIENTS $1,942 Trade Adjustment Assistance Trade Adjustment Assist; To provide tech assist & cash benefits to farmers & fishermen if increased imports contrib importantly to a price decline Foreign Agricultural Service 12/31/2011