Cochise County, Ariz., funds by Agriculture, Department of
Listing $12,740,507.80 in stimulus funds from Agriculture, Department of for Cochise
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MULTIPLE RECIPIENTS | $7,330,501 | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Rural Housing Service | 11/30/2009 |
MULTIPLE RECIPIENTS | $2,425,000 | Unknown Business and Industry Loans - ARRA | Rural Business Cooperative Service | 4/30/2010 |
UTILITY CONSTRUCTION COMPANY, INC. | $699,336 | Upgrades to the water system at four locations for the Department of Forestry near Sierra Vista, AZ to include but not limited to installation and development of a water well, installation of well pumps, installation of masonry buildings to support pumps, | Forest Service | 7/19/2010 |
MULTIPLE RECIPIENTS | $501,710 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 9/30/2010 |
MRM CONSTRUCTION SERVICES, INC. | $316,943 |
Establish construction control points, design permanent bridge structure, complete hydraulic design, complete geotechnical investigation and report, and construct new bridge and bridge approaches.
This spending item is part of a $530,200 allocation.
See details
|
Forest Service | 4/07/2010 |
YAQUI ELECTRIC CO LLC | $296,684 | Perform the removal of existing failing roofing systems and the replacement of them with various materials per the following: Powers Garden, Barfoot Lookout & Atascosa Lookout Roof Replacements 1 Mobilization LSQ 1 JB Powers Garden 2 Remove Ex | Forest Service | 6/02/2010 |
PIMA PAVING INC. | $270,940 | Remove existing damaged chipseal from campground ciculation loop and parking areas and deposit and spread debris in a RV/overflow dirt parking area. Prepare ciculation loop and parking lot with aggregate base and pave with asphalt. | Forest Service | 12/08/2009 |
YAQUI ELECTRIC CO LLC | $228,514 | Half Moon Ranch House 1. Remove Existing Asbestos Shingles approximately 2,975 square feet. 2. Repair Existing Sub-Roof 3. Install New Standing Seam Metal Roof approximately 2,975 square feet. 4. Install New Skylight: 5. Install New Gutter and Downsp | Forest Service | 4/15/2010 |
MULTIPLE RECIPIENTS | $215,500 | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Farm Service Agency | 3/05/2009 |
HUITT - ZOLLARS, INC. | $105,197 |
Establish construction control points, design permanent bridge structure, complete hydraulic design, complete geotechnical investigation and report, and construct new bridge and bridge approaches.
This spending item is part of a $530,200 allocation.
See details
|
Forest Service | 4/07/2010 |
BISBEE UNIFIED SCHOOL DISTRICT 2 | $72,464 |
Child Nutrition Discretionary Grants Limited Availability The Arizona Department of Education received funds through the American Recovery and Reinvestment Act of 2009 (ARRA) to assist in the purchase of equipment for School Food Authorities (SFAs) participating in the National School Lunch Program t through a com... Show more
This spending item is part of a $2,208,964 allocation.
See details
|
Food and Nutrition Service | 3/23/2009 |
MULTIPLE RECIPIENTS | $60,000 | Farm Operating Loans DIRECT OPERATING LOAN | Farm Service Agency | 3/05/2009 |
MULTIPLE RECIPIENTS | $43,100 | Farm Operating Loans DIRECT OPERATING LOAN | Farm Service Agency | 3/05/2009 |
PENHALL COMPANY | $39,905 |
Establish construction control points, design permanent bridge structure, complete hydraulic design, complete geotechnical investigation and report, and construct new bridge and bridge approaches.
This spending item is part of a $530,200 allocation.
See details
|
Forest Service | 4/07/2010 |
CKC CONSTRUCTION & MATERIALS, LLC | $38,936 | Construct approximately .7 miles of new roadway by hauling 1372 tons of engineered fill to plate the new roadway. After constructing new roadway, decommission existing user created road of .6 miles. | Forest Service | 3/09/2010 |
Hark Drilling, Incorporated | $36,800 |
Establish construction control points, design permanent bridge structure, complete hydraulic design, complete geotechnical investigation and report, and construct new bridge and bridge approaches.
This spending item is part of a $530,200 allocation.
See details
|
Forest Service | 4/07/2010 |
HUNTER GUARD RAIL & FENCE CO | $31,355 |
Establish construction control points, design permanent bridge structure, complete hydraulic design, complete geotechnical investigation and report, and construct new bridge and bridge approaches.
This spending item is part of a $530,200 allocation.
See details
|
Forest Service | 4/07/2010 |
MERCURY CONSTRUCTORS, INC. | $27,207 | This project was a realignment of an existing Forest Service Road known as ?High Creek Road? that was located on private property. The existing road was on the private property for approximately one half of a mile. A new route was selected for the roadway | Forest Service | 1/20/2011 |
MULTIPLE RECIPIENTS | $486 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 4/30/2010 |
ARVEN VONDY TRUST | $395 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 7/12/2010 |
MULTIPLE RECIPIENTS | $140 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 7/31/2010 |
MULTIPLE RECIPIENTS | $96 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 5/31/2010 |
WILLCOX UNITED METHODIST CHURCH | $0 | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Rural Housing Service | 3/08/2010 |
MULTIPLE RECIPIENTS | $0 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 8/31/2010 |
MULTIPLE RECIPIENTS | -$700 | Farm Operating Loans DIRECT OPERATING LOAN | Farm Service Agency | 4/30/2010 |