Maricopa County, Ariz., funds by Department of the Air Force
Listing $16,626,502.55 in stimulus funds from Department of the Air Force for Maricopa
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SUNSET AIR, INC. | $1,890,998 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
MRM CONSTRUCTION SERVICES, INC. | $1,655,738 |
Repair Aircraft Parking Apron Gila Bend AFAF
This spending item is part of a $1,793,478 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
HONEYWELL INTERNATIONAL INC. | $1,457,992 | The impact of advanced materials and processes on fuel burn for fielded and developmental gas turbine propulsion engines will be determined using analytical engine cycle models of representative engine classes. The model results will provide the data nec | Department of the Air Force | 7/30/2009 |
MRM CONSTRUCTION SERVICES, INC. | $1,267,916 |
Maintain Base Streets
This spending item is part of a $1,306,686 allocation.
See details
|
Department of the Air Force | 4/28/2009 |
AFFILIATED WESTERN, INC. | $1,166,300 | RepairPrimary substation Design-Build at Luke AFB, AZ | Department of the Air Force | 4/28/2009 |
HONEYWELL INTERNATIONAL INC. | $1,012,985 |
Program Title: Adaptive Combustor Technology for the High Energy Efficient Turbine Engine (HEETE) Program The objective of the Adaptive Combustor Program for HEETE is to explore the combustion technologies needed for a combustor that can tailor fuel eff
This spending item is part of a $1,474,891 allocation.
See details
|
Department of the Air Force | 8/10/2009 |
MRM CONSTRUCTION SERVICES, INC. | $870,457 | Mill and Overlay overruns, install crack and joint seals and paint airfield markings. | Department of the Air Force | 4/09/2009 |
ARIZONA STATE UNIVERSITY | $636,641 |
Air Force Defense Research Sciences Program Abstract at time of agreement: 'This project investigates a novel solar cell design that uses lattice-matched semiconductor materials. The key innovation of this project is to monolithically integrate the materials to build many junctions without generat
This spending item is part of a $746,131 allocation.
See details
|
Department of the Air Force | 9/30/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $624,080 | Removal and replacement of thirty-one (31) water valves ranging in size from 6 to 12 at various locations on Luke AFB. Work includes but is not limited to dig permits, scheduling outages, excavation, shoring, removal of the old valve, asbestos abatement, | Department of the Air Force | 5/12/2009 |
RUSSELL SIGLER, INC. | $620,000 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
MRM CONSTRUCTION SERVICES, INC. | $573,880 |
Mill and Overlay Overruns-21L/03R Inside
This spending item is part of a $607,047 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
MRM CONSTRUCTION SERVICES, INC. | $560,096 |
Mill and overlay overruns-21R/03L Outside
This spending item is part of a $607,047 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
PACIFIC TECH CONSTRUCTION, INC. | $361,867 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
MRM CONSTRUCTION SERVICES, INC. | $313,041 | Repair Dorm Parking Lot 533 & 542 | Department of the Air Force | 4/14/2009 |
MRM CONSTRUCTION SERVICES, INC. | $245,729 | Repair Parking Lot & Drainage Bldg 859 | Department of the Air Force | 4/13/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $243,839 | Removal and replacement of two 70' high mast lighting airfield ramp poles and two 120' high mast lighting ramp poles to include all underground work, boring, installation and commissioning | Department of the Air Force | 4/14/2009 |
MRM CONSTRUCTION SERVICES, INC. | $233,873 | Repair Parking Lot Building 156 | Department of the Air Force | 4/13/2009 |
MRM CONSTRUCTION SERVICES, INC. | $229,210 | Mill and overlay taxiway, install crack and joints seals and paint airfield markings. | Department of the Air Force | 4/09/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $219,382 | Removal and replacement of four 70' high mast lighting airfield ramp poles to include all underground work, boring, installation and commissioning | Department of the Air Force | 4/14/2009 |
PACIFIC TECH CONSTRUCTION, INC. | $205,065 |
Replace Roof on Building 799, Luke AFB, AZ.
This spending item is part of a $217,543 allocation.
See details
|
Department of the Air Force | 4/17/2009 |
HUNTER CONTRACTING CO. | $200,043 |
Removal and replacement of one 6 water main and associated piping. Scope includes excavation, horizontal boring, installation of a new 6 HDPE water main, abandonment of the old 6 ductile iron pipe line, backfill, compaction, paving, striping, site restor
This spending item is part of a $364,335 allocation.
See details
|
Department of the Air Force | 9/24/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $185,105 | Removal and replacement of eight (8) 500 kVA transformers at Luke Air Force Base, AZ - mod to reduce scoep was issued as the final selected transformers were not all 500 KVA - some were smaller | Department of the Air Force | 4/14/2009 |
MRM CONSTRUCTION SERVICES, INC. | $170,539 | Repair Roadway & Adjacent Lot Bldg 400 | Department of the Air Force | 4/13/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $164,292 |
Removal and replacement of one 6 water main and associated piping. Scope includes excavation, horizontal boring, installation of a new 6 HDPE water main, abandonment of the old 6 ductile iron pipe line, backfill, compaction, paving, striping, site restor
This spending item is part of a $364,335 allocation.
See details
|
Department of the Air Force | 9/24/2009 |
MRM CONSTRUCTION SERVICES, INC. | $163,762 | Build Equip Storage Area Bldg 944 | Department of the Air Force | 4/13/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $139,741 | Removal and replacement of eight (8) 500 kVA transformers at Luke Air Force Base, AZ - contract value was reduced as when the final determination of which transformers to replace was made not all were 500 KVA, many were small thus reducing the contract va | Department of the Air Force | 4/14/2009 |
UTILITY CONSTRUCTION COMPANY, INC. | $116,031 | This is a design build to design backup power to a mission critical building and the construction of the same. Construction will consist of constructing a concrete pad, generator, ATS and fuel tank installation, block wall work, testing and commissioning | Department of the Air Force | 9/19/2009 |
MRM CONSTRUCTION SERVICES, INC. | $110,703 | Repair Roadway & Lot Bldg 944 | Department of the Air Force | 4/13/2009 |
MRM CONSTRUCTION SERVICES, INC. | $97,765 | Repair 138th Avenue | Department of the Air Force | 4/13/2009 |
STANTEC CONSULTING SERVICES INC. | $97,000 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
MRM CONSTRUCTION SERVICES, INC. | $95,314 | Repair wing Tank Storage Yard | Department of the Air Force | 4/13/2009 |
ALLIANCE FIRE PROTECTION CO. | $86,374 |
This project includes the installation of a new wet-pipe fire protection system for the high bay lab area of Building 277. New work shall include the installation of a complete automatic fire protection system for the indicated zone classifications to co
This spending item is part of a $109,025 allocation.
See details
|
Department of the Air Force | 6/26/2009 |
AGATE, INC. | $78,000 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
MRM CONSTRUCTION SERVICES, INC. | $67,479 |
Sealcoat Roads & Streets Gila Bend
This spending item is part of a $109,709 allocation.
See details
|
Department of the Air Force | 4/13/2009 |
Cholla Pavement Maintenance, Inc | $51,430 |
Repair Aircraft Parking Apron Gila Bend AFAF
This spending item is part of a $1,793,478 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
Pettera Asphalt Profiling Inc | $46,950 |
Mill and overlay overruns-21R/03L Outside
This spending item is part of a $607,047 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
Advanced Concrete Sawing and Sealing, LLC | $45,417 |
Repair Aircraft Parking Apron Gila Bend AFAF
This spending item is part of a $1,793,478 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
American Asphalt Paving & Seal Coating, Inc | $42,230 |
Sealcoat Roads & Streets Gila Bend
This spending item is part of a $109,709 allocation.
See details
|
Department of the Air Force | 4/13/2009 |
SUNDT CONSTRUCTION, INC. | $40,893 |
Repair Aircraft Parking Apron Gila Bend AFAF
This spending item is part of a $1,793,478 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
PEARSON ENGINEERING ASSOCIATES, INCORPORATED | $40,000 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
W S P Inc | $38,770 |
Maintain Base Streets
This spending item is part of a $1,306,686 allocation.
See details
|
Department of the Air Force | 4/28/2009 |
Bray Commercial Division | $38,432 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
W S P Inc | $33,166 |
Mill and Overlay Overruns-21L/03R Inside
This spending item is part of a $607,047 allocation.
See details
|
Department of the Air Force | 4/09/2009 |
Suntech Electric Llc | $33,000 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
THOMAS PIPE & SUPPLY CO. | $30,000 |
Repair Air conditioning systems for three buildings located at Luke Air Force Base in Arizona. TAS::57 3404::TAS RECOVERY - NUEX0114181 -Design and Repair Dormitory HVAC / Electrical System- B528 RECOVERY - NUEX051515 - Repair HVAC System, B966 Non-Des
This spending item is part of a $3,189,297 allocation.
See details
|
Department of the Air Force | 5/06/2009 |
ENTREPIX, INC | $12,500 |
AFRL 37% solar cell development program
This spending item is part of a $5,764,348 allocation.
See details
|
Department of the Air Force | 6/17/2009 |
AARA CONSTRUCTION, INC. | $12,478 |
Replace Roof on Building 799, Luke AFB, AZ.
This spending item is part of a $217,543 allocation.
See details
|
Department of the Air Force | 4/17/2009 |