Pima County, Ariz., funds by Army, Department of
Listing $2,780,278.75 in stimulus funds from Army, Department of for Pima
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
Comfort Systems Usa, Inc. | $402,930 |
Renovate Gosselin Barracks Work shall include a new fire suppression system, fire detection system, new LON based DDC controls, repair and replacement of exhaust system, complete HVAC system repair, removal and replacement of designated flooring, removal
This spending item is part of a $3,068,000 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/22/2009 |
KAZAL FIRE PROTECTION, INC | $386,092 |
The job is 95% complete. Renovation of buildings 41407 & 41408. Installation of acoustical ceilings, Installing electrical, Installing fire alarm, Installation of new HVAC equipment, Installation of attic insulation, Installation of foam insulation
This spending item is part of a $2,335,524 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
DESERT STREAMS CONSTRUCTION, INC. | $330,355 |
Renovate Gosselin Barracks Work shall include a new fire suppression system, fire detection system, new LON based DDC controls, repair and replacement of exhaust system, complete HVAC system repair, removal and replacement of designated flooring, removal
This spending item is part of a $3,068,000 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/22/2009 |
GRG CONSTRUCTION CO., INC. | $292,049 |
RECOVERY PROJECT TITLE= REPAIR WASTEWATER TREATMENT PLANT DRYING BEDS PROJECT NUMBER 38777
This spending item is part of a $732,200 allocation.
See details
|
Army, Department of | 8/28/2009 |
MCCOOK BOILER AND PUMP COMPANY | $269,388 |
the contractor shall supply all labor materials, equipment, expertise, and supervision necessary to install a nominal 50 boiler horsepower wood chip burning hot water heating system with automatic feed system. The project consists of three parts: (1) Si
This spending item is part of a $687,249 allocation.
See details
|
Army, Department of | 8/29/2009 |
KAZAL FIRE PROTECTION, INC | $211,350 |
Renovate Gosselin Barracks Work shall include a new fire suppression system, fire detection system, new LON based DDC controls, repair and replacement of exhaust system, complete HVAC system repair, removal and replacement of designated flooring, removal
This spending item is part of a $3,068,000 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/22/2009 |
AIR CONDITIONING MAINTENANCE, CO. | $145,858 |
Awards are to provide all plant, labor, equipment, appliances, materials, expertise and supervision necessary for constructing and installing new mechanical equipment, asbestos abatement, electrical and utility improvements, pavement improvements, as well
This spending item is part of a $748,322 allocation.
See details
|
Army, Department of | 7/30/2009 |
FIERRO LATH AND PLASTER, INC. | $143,838 |
REPLACE EVAP COOLING WITH A/C TMAC BUILDING 70525, MWR PROJECT NO 25206
This spending item is part of a $1,874,065 allocation.
See details
|
Army, Department of | 8/13/2009 |
Cornerstone Electrical Contractors, LLC | $126,361 |
Awards are to provide all plant, labor, equipment, appliances, materials, expertise and supervision necessary for constructing and installing new mechanical equipment, asbestos abatement, electrical and utility improvements, pavement improvements, as well
This spending item is part of a $748,322 allocation.
See details
|
Army, Department of | 7/30/2009 |
DESERT STREAMS CONSTRUCTION, INC. | $126,175 |
The job is 95% complete. Renovation of buildings 41407 & 41408. Installation of acoustical ceilings, Installing electrical, Installing fire alarm, Installation of new HVAC equipment, Installation of attic insulation, Installation of foam insulation
This spending item is part of a $2,335,524 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
BESTWAY ELECTRIC MOTOR SERVICE CO., INC. | $87,480 |
GREELY HALL CHILLED WATER PIPING
This spending item is part of a $474,808 allocation.
See details
|
Army, Department of | 12/29/2009 |
IFS FLOORING, L.L.C. | $52,600 |
Renovate Gosselin Barracks Work shall include a new fire suppression system, fire detection system, new LON based DDC controls, repair and replacement of exhaust system, complete HVAC system repair, removal and replacement of designated flooring, removal
This spending item is part of a $3,068,000 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/22/2009 |
RG INTERIORS LLC | $36,000 |
REPLACE EVAP COOLING WITH A/C TMAC BUILDING 70525, MWR PROJECT NO 25206
This spending item is part of a $1,874,065 allocation.
See details
|
Army, Department of | 8/13/2009 |
Progressive Services, Inc. | $35,154 |
Awards are to provide all plant, labor, equipment, appliances, materials, expertise and supervision necessary for constructing and installing new mechanical equipment, asbestos abatement, electrical and utility improvements, pavement improvements, as well
This spending item is part of a $748,322 allocation.
See details
|
Army, Department of | 7/30/2009 |
The Runde Company LLC | $27,694 |
Awards are to provide all plant, labor, equipment, appliances, materials, expertise and supervision necessary for constructing and installing new mechanical equipment, asbestos abatement, electrical and utility improvements, pavement improvements, as well
This spending item is part of a $748,322 allocation.
See details
|
Army, Department of | 7/30/2009 |
ROMANOSKI GLASS AND MIRROR COMPANY, INC. | $26,630 |
Awards are to provide all plant, labor, equipment, appliances, materials, expertise and supervision necessary for constructing and installing new mechanical equipment, asbestos abatement, electrical and utility improvements, pavement improvements, as well
This spending item is part of a $748,322 allocation.
See details
|
Army, Department of | 7/30/2009 |
SERVICE INSULATION SYSTEMS INC | $25,500 |
RECOVERY PROJECT TITEL- REPLACE EVAP COOLING WITH A/C, TMAC BUILDING 70525, MWR PROJECT NUMBER 25206
This spending item is part of a $1,874,065 allocation.
See details
|
Army, Department of | 8/13/2009 |
SERVICE INSULATION SYSTEMS INC | $25,500 |
REPLACE EVAP COOLING WITH A/C TMAC BUILDING 70525, MWR PROJECT NO 25206
This spending item is part of a $1,874,065 allocation.
See details
|
Army, Department of | 8/13/2009 |
MORRISON-MAIERLE, INCORPORATED | $14,714 | Providing professional services for submittal review, answering of design and interpretation questions, review of invoices, claims by construction contractor, as-built drawings, periodic on-site visits, real property cost data accumulation, acceptance ins | Army, Department of | 6/10/2009 |
STANTEC CONSULTING SERVICES INC. | $6,251 |
RECOVERY PROJECT TITLE- REPAIR SEWER LINE FROM MH 8-70 TO 7-125 PROJECT NUMBER 38831
This spending item is part of a $49,419 allocation.
See details
|
Army, Department of | 9/30/2009 |
DARLING ENVIRONMENTAL & SURVEYING, LTD. | $5,350 |
RECOVERY PROJECT TITLE= REPAIR WASTEWATER TREATMENT PLANT DRYING BEDS PROJECT NUMBER 38777
This spending item is part of a $732,200 allocation.
See details
|
Army, Department of | 8/28/2009 |
K.R. YARBROUGH CONSTRUCTION COMPANY INC | $3,009 |
REPLACE EVAP COOLING WITH A/C TMAC BUILDING 70525, MWR PROJECT NO 25206
This spending item is part of a $1,874,065 allocation.
See details
|
Army, Department of | 8/13/2009 |