Fresno County, Calif., funds by Department of Veterans Affairs
Listing $9,265,840.61 in stimulus funds from Department of Veterans Affairs for Fresno
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PULLIAM CONSTRUCTION COMPANY, INC. | $2,000,700 |
Furnish design, labor, materials, equipment and administrative support for the design build project 570-09-134 'Replace Steam Boilers'.
This spending item is part of a $2,077,700 allocation.
See details
|
Department of Veterans Affairs | 7/14/2010 |
ELLERY GROUP & RATTO CONSTRUCTION COMPANY, INC., THE | $1,970,268 | Provide all labor and materials to remediate all known asbestos pipe insulation on station. | Department of Veterans Affairs | 7/30/2010 |
PULLIAM CONSTRUCTION COMPANY, INC. | $1,863,777 | Replace two (2) existing 225 Ton York Max-E Centrifugal Chillers, one (1) Baltimore Air Coil VLT-600 cooling tower, and expand one (1) plate and frame 'free cooling' heat exchanger. | Department of Veterans Affairs | 3/25/2010 |
HERRERA CORPORATION | $1,098,635 | Sidewalk Improvements, Underground Drainage Improvements, All Weather Canopy System | Department of Veterans Affairs | 7/28/2010 |
HERRERA ENGINEERING | $504,993 | Repair Sidewalks and Parking | Department of Veterans Affairs | 5/10/2010 |
HERRERA ENGINEERING | $502,395 | Repair Sidewalks and parking. | Department of Veterans Affairs | 5/14/2010 |
TAYLOR TETER PARTNERSHIP | $393,800 | Identification of asbestos piping insulation. Preparation of bid and construction documents for the removal of asbestos insulation the replacement with non-asbestos insulation. | Department of Veterans Affairs | 12/23/2009 |
FCE, INC FRAMPTON CONSULTING ENGINEERS INC. | $274,134 | Initial award was 11-10-09 in the amount of 178,290, then on 12-30-09 this contract was ammended in the amount of 85267.23 for the Reduction in TimeLine for services rendered on a fasttrack. to a total contract value of 263557.23 | Department of Veterans Affairs | 12/30/2009 |
TOTAL TEAM CONSTRUCTION SERVICES, INC | $208,549 | Construction Sitework | Department of Veterans Affairs | 9/29/2009 |
FRAMPTON CONSULTING ENGINEERS INC. | $130,961 | Civil Engineering | Department of Veterans Affairs | 6/24/2009 |
PAULI ENGINEERING INC | $128,544 | Fresno Veterans Hospital Sidewalks repair / ADA compliance Shade structure - Main entrance improvements | Department of Veterans Affairs | 12/29/2009 |
FRAMPTON CONSULTING ENGINEERS INC. | $120,752 | Parking-Sidewalk-Landscaping, East Side of Campus, Payment of Regional Water Quality Control Board Fees (totaling 120,752) | Department of Veterans Affairs | 4/09/2010 |
PAULI ENGINEERING INC | $48,313 | CLC Medical Gas Expansion. Redesign oxygen and vacuum hook-ups for patient rooms. | Department of Veterans Affairs | 4/16/2010 |
West Star Environmental, Inc. | $10,010 |
Design-Build Replace emergency power systems, Menlo Park Division at the VA Palo Alto Health Care System, Menlo Park, CA
This spending item is part of a $1,857,100 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
West Star Environmental, Inc. | $10,010 |
Design-Build Replace emergency power systems, Livermore Division at the VA Palo Alto Health Care System, Livermore, CA
This spending item is part of a $1,952,527 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |