Los Angeles County, Calif., funds by General Services Administration
Listing $30,427,449.13 in stimulus funds from General Services Administration for Los Angeles
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
STRONGHOLD ENGINEERING INCORPORATED | $5,127,402 |
'PS58 - Scope of work includes demolition, removal, and disposal of existing Heating, Ventilation and Air Conditioning ductwork, installation and appunenances on Floors 5, 6, 8, 1 South and Passenger Elevator Lobbies in conjunction with the ''Recovery'' U
This spending item is part of a $13,128,830 allocation.
See details
|
Public Buildings Service | 5/29/2009 |
MESA ENERGY SYSTEMS, INC. | $4,299,369 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
VETERAN CONSTRUCTION GROUP, INC. | $3,660,258 | Cafeteria Remodel, 300 North Los Angeles Federal Building, Los Angeles, CA 90012. The purpose is to make the cafeteria more energy efficient and to reduce the negative impact on the environment and health of building tenants. | Public Buildings Service | 6/17/2010 |
Thyssenkrupp Elevator Corp | $1,905,698 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
VETERAN CONSTRUCTION GROUP, INC. | $1,393,583 | Courthouse roof replacement, U.S. Courthouse, 312 North Spring Street, Los Angeles, CA 90012. This project is to support the increased energy conservation efforts of the GSA through the installation of a new roof system on all roof levels of the courthous | Public Buildings Service | 3/31/2010 |
BURO HAPPOLD CONSULTING ENGINEERS, INC. | $1,238,377 |
Gensler has been awarded a contract through the GSA for design and design-related services for the 'Recovery' project entitled 'Repairs and Alterations to the Prince Jonah Kuhio Kalanianaole Federal Building and U.S. Courthouse located at 300 Ala Moana Bo
This spending item is part of a $32,457,801 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
CANNON PARKIN INC | $1,188,512 | DESIGN SERVICES TO UPGRADE HVAC SYSTEMS ON FLOORS 1 SOUTH, 5, 6, AND 8 AT THE FEDERAL BUILDING, LOCATED AT 300 NORTH LOS ANGELES STREET, LOS ANGELES, CA. For work associated with providing pre-design through construction administration and commissioning | Public Buildings Service | 5/29/2009 |
BERGELECTRIC CORP. | $954,555 | Energy Saving Lighting Retrofit - To furnish and install lighting fixtures. | Public Buildings Service | 2/26/2010 |
CANNON PARKIN INC | $945,544 | DESIGN SERVICES TO UPGRADE HVAC SYSTEMS ON FLOORS 1 SOUTH, 5, 6, AND 8 AT THE FEDERAL BUILDING, 300 NORTH LOS ANGELES STREET, LOS ANGELES, CA. | Public Buildings Service | 5/28/2009 |
MESA ENERGY SYSTEMS, INC. | $781,338 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
AMERICAN INTEGRATED SERVICES, INC. | $665,909 |
'PS58 - Scope of work includes demolition, removal, and disposal of existing Heating, Ventilation and Air Conditioning ductwork, installation and appunenances on Floors 5, 6, 8, 1 South and Passenger Elevator Lobbies in conjunction with the ''Recovery'' U
This spending item is part of a $13,128,830 allocation.
See details
|
Public Buildings Service | 5/29/2009 |
BERGELECTRIC CORP. | $630,991 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures at the Sacramento Fed Bldg in Sacramento, CA.
This spending item is part of a $1,039,682 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
BOWCON COMPANY INC | $574,087 | Water conservation project - remove & replace restroom fixtures with high efficiency restroom fixtures at the Roybal Federal Building. | Public Buildings Service | 2/12/2010 |
BERGELECTRIC CORP. | $483,411 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures at the Robert Matsui USCH in Sacramento, CA.
This spending item is part of a $2,039,110 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
AIR WEST MECHANICAL CONSTRUCTION, INC. | $467,171 | Boiler & Hydronic system replacement - Pasadena Federal Courthouse | General Services Administration | 9/29/2011 |
ONUMA, INC. | $427,594 |
Based on the preliminary facility requirements established in the first half of this project, the Project Team proceeded to generate more detailed architectural concepts and layouts. For example, finer levels of detail were examined using Room Data sheets
This spending item is part of a $799,998 allocation.
See details
|
Public Buildings Service | 6/17/2009 |
GENLYTE THOMAS GROUP LLC | $351,282 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures.
This spending item is part of a $541,559 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
ONUMA, INC. | $304,854 |
Create High Performance Green Buildings within the federal owned portfolio. Some of the American Recovery Reinvestment Act (ARRA) projects in Region 2 will be utilizing some level of Building Information Modeling (BIM) of BIM technologies in the design an
This spending item is part of a $391,975 allocation.
See details
|
Public Buildings Service | 8/25/2010 |
D. BURKE MECHANICAL CORP | $265,200 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
BERGELECTRIC CORP. | $261,915 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures.
This spending item is part of a $702,190 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
AIR MANAGEMENT INDUSTRIES INCORPORATED | $241,018 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
A&P DEVELOPMENT & CONSTRUCTION, INC. | $225,250 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
WEBCO | $219,892 | ROOF REPAIRS FOR CHAMBERS USCH, PASADENA, CA (THIS FEDERAL COURT HOUSE IS A HISTORICAL LANDMARK BUILT IN THE 1880'S) RESTORE/REPAIR ROOF AND INSTALL NEW TITLE 24 COMPLIANT, WHITE COOL ROOF TO REDUCE HEAT GAIN AND PROVIDE 30 YEAR ROOF WARRANTY. | Public Buildings Service | 3/29/2010 |
BERGELECTRIC CORP. | $190,277 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures.
This spending item is part of a $541,559 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
INTERACTIVE RESOURCES, INC | $188,473 |
Design of cafeteria at the North Los Angeles Federal Building.
This spending item is part of a $358,584 allocation.
See details
|
Public Buildings Service | 12/03/2009 |
CJS Industrial Maintenance | $188,440 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
SIEMENS INDUSTRY INC. | $183,934 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
Rossetti Associates Inc | $173,017 |
Construction Management Services for Federal Courthouse in Bakersfield, CA.
This spending item is part of a $2,130,426 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
MARTIN/BRATTRUD, INC. | $165,864 |
Manufacture, deliver, and install office furniture for GSA Swing Space.
This spending item is part of a $7,694,601 allocation.
See details
|
General Services Administration | 6/17/2010 |
HORTON LEES BROGDEN LIGHTING DESIGN INC. | $160,012 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
SITWELL, LLC | $155,490 |
Provide approx 470 Remanufactured Office Furniture Workstations, 100 stacking chairs, 50 Manager Guest Chairs, 700 Task Chairs primarily for the Veterans Administration in Roanoke, VA. The award als includes installation, teardown and removal.
This spending item is part of a $1,169,159 allocation.
See details
|
Public Buildings Service | 9/23/2010 |
K R ENVIRONMENTAL SERVICES INC | $151,140 | Asbestos and lead abatement monitoring of the removal of the air handling system (ducts) of the three and a half remaining floors (5,6,8,and half of the 1st) of the Federal Building at 300 N. Los Angeles St. Los Angeles Ca. This includes the elevator lobb | Public Buildings Service | 6/26/2009 |
AIR WEST MECHANICAL CONSTRUCTION, INC. | $139,232 | FAA COMPUTER ROOM HVAC UPGRADE HAWTHORNE FEDERAL BLDG. 15000 AVIATION BLVD. LAWNDALE, CA | General Services Administration | 10/29/2010 |
ECOGREEN SERVICES, LLC | $132,874 | Water Conservation Project - Restroom Fixtures Replacement for Federal Buliding - Will update plumbing fixtures and Conserve Water resources and reduce maintenance of restroom fixtures | Public Buildings Service | 3/11/2010 |
CMARK CONSTRUCTION, INC. | $131,901 | PROVIDE FURNITURE FOR LOS ANGELES FEDERAL BUILDING CAFETERIA REMODEL IN LOS ANGELES CALIFORNIA. | Public Buildings Service | 4/08/2011 |
Gordon and Sons Electric | $116,189 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
CATTAIL LODGE SPICE COMPANY INC. | $109,701 | supply cafeteria equipment, Federal Building Los Angeles CA | Public Buildings Service | 4/08/2011 |
Beb & Associates Inc | $100,450 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
BERGELECTRIC CORP. | $96,080 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures at the Lloyd George USCH in Las Vegas, NV.
This spending item is part of a $567,988 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
Beb & Associates Inc | $94,500 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
SUPERIOR GUNITE | $94,400 |
Purpose: New East Southbound Pedestrian Crossing from the San Ysidro, CA, USA into Mexico Location: San Ysidro, CA Name of Project: San Ysidro - U.S. Land Port of Entry Phase 1c: East Southbound Pedestrian Crossing Project Status: Project awarded as of Ju
This spending item is part of a $4,889,168 allocation.
See details
|
Public Buildings Service | 6/30/2011 |
TENG & ASSOCIATES, INC. | $92,073 | Perform energy measurement and verification. Install data loggers to develop building profile. Process data, provide building energy analysis signature. Reinstall loggers after work is complete to obtain final project savings. Review Project Documents | Public Buildings Service | 8/31/2010 |
KAMRAN AND COMPANY, INC. | $90,717 | Furnish,deliver various food service equipments to Los Angeles Federal Building | Public Buildings Service | 4/08/2011 |
AIR WEST MECHANICAL CONSTRUCTION | $72,808 | Install VFD on Chiller # 3 at the Federal Bldg | Public Buildings Service | 9/03/2009 |
Gordon and Sons Electric | $71,000 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
D. BURKE MECHANICAL CORP | $52,860 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
DELTA BUILDING SERVICES, INC. | $50,650 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
ABM ENGINEERING SERVICES COMPANY | $50,000 | Replacement work at 300 N LA building. | Public Buildings Service | 12/28/2011 |
SWINERTON BUILDERS | $50,000 | Design and Constructions Services as required for the Design/Build Construction of a New U.S. Federal Courthouse per the RFP Solicitation #GS-09P-09-KT-C-0077 | Public Buildings Service | 12/16/2009 |
MORLEY GROUP, INC. | $50,000 | $50,000 Stipend for GSA Bakersfield Courthouse RFP GS-09-09P-KT-C-0077 issued on August 25, 2009 | Public Buildings Service | 12/22/2009 |
PYRAMID SERVICES, INC. | $48,370 | Contractor to provide material and labor for installing new, high efficiency PVC for the Cooling Towers at the West Los Angeles Federal Building. | Public Buildings Service | 8/31/2009 |
EGAN VISUAL/WEST INC. | $46,359 |
Manufacture, deliver, and install office furniture for GSA Swing Space.
This spending item is part of a $7,694,601 allocation.
See details
|
General Services Administration | 6/17/2010 |
MARTEC CONSTRUCTION, INC | $46,100 |
Replacement of economizer dampers
This spending item is part of a $66,485 allocation.
See details
|
Public Buildings Service | 3/31/2010 |
ALLIANCE ROOFING LLC | $39,054 | Provide an installation specification and coordination of removal of materials based on the buildings lagistics for materials being emoved from the rooftop and disposed of into dumpsteres on the street. | Public Buildings Service | 12/30/2009 |
HULETT & ASSOCIATES LLC | $37,300 |
Provide professional services to administer and complete three major scope services in accordance with the statement of work: 1. Big Four Decision Points. Passive Optical Network, Management Services, Operations and Management Time period and moving of ex
This spending item is part of a $348,009 allocation.
See details
|
Public Buildings Service | 4/29/2010 |
MILLAN & SONS | $30,744 | Seismic Life & Safety | Public Buildings Service | 7/30/2009 |
Thermal Insulation Contractors Inc | $30,325 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
TRANTER, INC. | $30,284 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
K R ENVIRONMENTAL SERVICES INC | $28,400 | Asbestos abatement monitoring and consulting of the 1st and 2nd floor of the Federal Building where work will be performed to complete a kitchen and cafeteria. | Public Buildings Service | 7/20/2011 |
PARKING BOOTH COMPANY INC | $28,000 |
Purpose: New East Southbound Pedestrian Crossing from the San Ysidro, CA, USA into Mexico Location: San Ysidro, CA Name of Project: San Ysidro - U.S. Land Port of Entry Phase 1c: East Southbound Pedestrian Crossing Project Status: Project awarded as of Ju
This spending item is part of a $4,889,168 allocation.
See details
|
Public Buildings Service | 6/30/2011 |
PSOMAS | $27,300 |
IDIQ Contrat for A-E Services to perform ALTA Survey for the New Courthouse located in Bakersfield, CA.
This spending item is part of a $34,561 allocation.
See details
|
Public Buildings Service | 7/13/2009 |
CHILLER SERVICES RIGGING & DEMOLITION INC | $25,850 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
ACM SYSTEMS, INC. | $25,261 | Install lighting controls for the basement of the West Los Angeles Federal Building. | Public Buildings Service | 8/24/2009 |
ACM SYSTEMS, INC. | $25,150 | Install an Automatic Building Controller on the Air Handler unit located in the basement of the West Los Angeles Federal Building in order to help manage energy consumption. | Public Buildings Service | 8/31/2009 |
BERGELECTRIC CORP. | $20,043 |
Energy Saving Lighting Retrofit. To furnish and install lighting fixtures.
This spending item is part of a $143,953 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
AIR WEST MECHANICAL CONSTRUCTION, INC. | $17,257 | Provide & install Isolation control valves for each boiler @ West Los Angeles Federal Building. | General Services Administration | 5/11/2011 |
AIR WEST MECHANICAL CONSTRUCTION, INC. | $16,862 | Install concrete slab & barrier posts around emergency generator for FAA @ 15000 Aviation Blvd., Lawndale, CA | General Services Administration | 2/28/2011 |
GARLAND COMPANY INC, THE | $15,952 |
1. Test for asbestos in or under roof (current roof may have been laid over an older roofing system). DUE: Two weeks after award of contract. 2. Specifications and schematic design for roof replacement. Documents must be sufficient to fully describe
This spending item is part of a $35,952 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
ACM SYSTEMS, INC. | $15,146 | Install lighting controls for the cafeteria at the West Los Angeles Federal Building. | Public Buildings Service | 8/24/2009 |
ACM SYSTEMS, INC. | $15,146 | Install lighting controls at the Post Office of the West Los Angeles Federal Building. | Public Buildings Service | 8/24/2009 |
A&J CLEANING SERVICES, INC. | $13,140 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
MARTEC CONSTRUCTION, INC | $11,920 |
Replacement of economizer dampers
This spending item is part of a $66,485 allocation.
See details
|
Public Buildings Service | 3/31/2010 |
Thermal Insulation Contractors Inc | $9,296 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
VETERAN FOODSERVICE SOLUTIONS, LLC | $9,188 | Status and location of the project. If Federal bldg, name the bldg. | Public Buildings Service | 4/08/2011 |
AIR WEST MECHANICAL CONSTRUCTION, INC. | $9,000 | Provide & install new HVAC dual VAV box for the FAA Computer Training Room | General Services Administration | 6/09/2011 |
MARTEC CONSTRUCTION, INC | $8,465 |
Replacement of economizer dampers
This spending item is part of a $66,485 allocation.
See details
|
Public Buildings Service | 3/31/2010 |
RAW INTERNATIONAL, INC. | $7,261 |
IDIQ Contrat for A-E Services to perform ALTA Survey for the New Courthouse located in Bakersfield, CA.
This spending item is part of a $34,561 allocation.
See details
|
Public Buildings Service | 7/13/2009 |
INTEGRA REALTY RESOURCES DFW LLP | $7,000 | Apprisal and Market Valuation of 9.93-? acre, vacant industrial site located at 9851-9917 Via de la Amistad, Otay Mesa, San Diego County, California. This property is immediately adjacent to the existing commercial border crossing facility identified as t | Public Buildings Service | 4/16/2009 |
ENOVITY, INC. | $6,723 | Southern California Commissioning, Retro-commissioning, Building Automation Engineering. Ad-hoc Engineering Assistance for Pasadena Roof Photovoltaic. | Public Buildings Service | 9/30/2011 |
ABM ENGINEERING SERVICES COMPANY | $4,967 | Provide support and escort services to assist Veterans Construction on the build out of the LEED Cafeteria. | Public Buildings Service | 12/28/2011 |
Roessler Design Group | $3,500 |
HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch
This spending item is part of a $1,719,560 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
T & D COMMUNICATIONS INC. | $2,200 | Overview: The objective of th | Public Buildings Service | 7/21/2010 |
ACEPEX MANAGEMENT CORPORATION | $556 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
FORENSIC ANALYTICAL LABORATORIES, INC. | $40 |
HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
GENLYTE THOMAS GROUP LLC | $0 |
Energy Saving Lighting Retrofit - To furnish and install lighting fixtures.
This spending item is part of a $875,490 allocation.
See details
|
Public Buildings Service | 2/26/2010 |