Los Angeles County, Calif., funds by National Aeronautics and Space Administration
Listing $243,142,806.70 in stimulus funds from National Aeronautics and Space Administration for Los Angeles
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CALIFORNIA INSTITUTE OF TECHNOLOGY | $64,000,000 | This effort is to establish preliminary designs for key elements of the Soil Moisture Active/Passive (SMAP) Project. SMAP is one of the NASA missions recommended by the 2007 National Research Council Earth Science Decadal Survey report for early implemen | National Aeronautics and Space Administration | 9/28/2009 |
PRATT & WHITNEY ROCKETDYNE, INC. | $42,998,467 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
NORTHROP GRUMMAN SPACE & MISSION SYSTEMS CORP. | $40,816,926 |
Advance the James Webb Space Telescope project towards mission Critical Design Review.
This spending item is part of a $65,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 7/14/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $18,000,000 | NASA will fund the OCO replacement mission--named OCO-2 with $18M under the American Recovery and Reinvestment Act to make progress towards the earliest possible launch date for the replacement mission. The OCO-2 replacement is called out as a line item | National Aeronautics and Space Administration | 5/01/2010 |
NORTHROP GRUMMAN SPACE & MISSION SYSTEMS CORP. | $15,574,328 |
The CERES sensors provide accurate measurements of the EarthG??s reflected solar and EarthG??s emitted thermal radiation. These measurements are critical for understanding the EarthG??s total climate system and improving climate prediction models. Recov
This spending item is part of a $21,164,815 allocation.
See details
|
National Aeronautics and Space Administration | 8/06/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $8,564,000 | The Aquarius project is being implemented jointly between NASA and the Aregentina Comision Nacional de Actividades Espaciales (CONAE) project Satelite de Aplicaciones Cientificas, flight D (SAC-D). This joint undertaking is referred to as the Acquarius/SA | National Aeronautics and Space Administration | 9/17/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $5,353,079 |
The objective of the Airborne Microwave Observatory of Subcanopy and Subsurface (AirMOSS) project is to significantly minimize the current uncertainty in net ecosystem carbon exchange (NEE) estimates over North America. Uncertaity in root-zone soil moist
This spending item is part of a $5,469,000 allocation.
See details
|
National Aeronautics and Space Administration | 8/26/2010 |
MOOG INC. | $5,182,611 |
The CERES sensors provide accurate measurements of the EarthG??s reflected solar and EarthG??s emitted thermal radiation. These measurements are critical for understanding the EarthG??s total climate system and improving climate prediction models. Recov
This spending item is part of a $21,164,815 allocation.
See details
|
National Aeronautics and Space Administration | 8/06/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $5,036,108 | This effort develops the Next Generation Airborne Visible/Infrared Imaging Spectrometer (AVIRISng) to address the science measurement requirements to support both the NASA HyspIRI Decadal Survey Mission and the Research and Analysis Program of NASA Earth | National Aeronautics and Space Administration | 8/03/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $4,040,000 | The objective of the Carbon in Arctic Reservoirs Vulnerability Experiment (CARVE) is to quantify correlations between atmospheric and surface state variables for the Alaskan terrestrial ecosystems through intensive seasonal aircraft campaigns, ground-base | National Aeronautics and Space Administration | 8/24/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,694,085 | Microwave Limb Sounder (MLS) is a major Principal Investigator experiment on the Earth Observing System (EOS) Aura Mission launched in July 2004.The EOS is a focal point of NASA's Earth Science Enterprise, designed to further the understanding of global c | National Aeronautics and Space Administration | 9/21/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,489,154 | The objective of this award is to provide a new validated airborne facility instrument, called the Portable Remote Imaging Spectrometer (PRISM), to identify constituents and quantify properties of complex coastal ocean waters using spectroscopic measureme | National Aeronautics and Space Administration | 9/02/2009 |
LOCKHEED MARTIN CORPORATION | $2,168,151 |
Perform research and development by conducting systems level experimental validations in support of NASA's research for an N+2 (N+2, denotes two generations beyond the current commercial transport fleet in the 2018-2020 timeframe) future supersonic commer
This spending item is part of a $4,730,622 allocation.
See details
|
National Aeronautics and Space Administration | 12/02/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,146,927 | The Atmospheric Infrared Sounder (AIRS) is an instrument on the Earth Obesrving System Aqua spacecraft. AIRS and the Advanced Microwave Sounding Unit (AMSU) form the AIRS Sounding System. This system is designed to meet climate research needs and operatio | National Aeronautics and Space Administration | 9/10/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,918,690 |
The objective of this award is to establish the information infrastructure required to bring NASA instruments, observations and scientific and technical expertise to bear on water resource management needs in the drought-stricken American southwest. Water
This spending item is part of a $1,950,000 allocation.
See details
|
National Aeronautics and Space Administration | 9/30/2009 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,822,400 | Composite Cryotank Technologies and Demonstration (CCTD) Design, Analysis and Testing for Composite LH2 Cryotanks | National Aeronautics and Space Administration | 9/28/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,800,000 | The effort for the Earth Observing System (EOS) is a focal point of NASA's Earth Science Enterprise, designed to further the understanding of global climate change by providing a global observing system and a comprehensive range of measurements. The Trop | National Aeronautics and Space Administration | 10/28/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,630,400 | The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) instrument is a pod-based L-band polarimetric syntheic aperture radar (SAR) that acquires airborne repeat track SAR data for differential interferometric measurements. This effort takes two | National Aeronautics and Space Administration | 8/17/2009 |
VACCO INDUSTRIES | $1,350,000 |
ARRA awarded to Project Orion, part of NASA's Constellation Program, for the development of the Orion Crew Vehicle. Specifically to reduce risk for the design, development, test & evaluation of the Ground Test Article, Engineering Development Units, and
This spending item is part of a $165,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 8/19/2009 |
HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL INC | $1,000,000 |
ARRA awarded to Project Orion, part of NASA's Constellation Program, for the development of the Orion Crew Vehicle. Specifically to reduce risk for the design, development, test & evaluation of the Ground Test Article, Engineering Development Units, and
This spending item is part of a $165,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 8/19/2009 |
CARAWAY AND CUCKLER ENGINEERINGS SERVICES INC. | $970,373 |
Advance the James Webb Space Telescope project towards mission Critical Design Review.
This spending item is part of a $65,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 7/14/2009 |
MOOG INC. | $969,773 |
TOTAL AND SPECTRAL IRRADIANCE SENSOR (TSIS) project: We will design, build, test, calibrate & deliver the TSIS instrument to Northrop Grumman Space Technology Corp., for inclusion on the National Polar-Orbiting Operational Environmental Satellite System
This spending item is part of a $26,307,665 allocation.
See details
|
National Aeronautics and Space Administration | 8/31/2009 |
A P R CONSULTING, INC. | $793,094 |
Advance the James Webb Space Telescope project towards mission Critical Design Review.
This spending item is part of a $65,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 7/14/2009 |
TONY VACCA CONSTRUCTION INC. | $697,057 | Remodel Multi Purpose Lab/Kitchen South Second Floor | National Aeronautics and Space Administration | 9/30/2010 |
STANFORD MU CORPORATION | $650,000 |
ARRA awarded to Project Orion, part of NASA's Constellation Program, for the development of the Orion Crew Vehicle. Specifically to reduce risk for the design, development, test & evaluation of the Ground Test Article, Engineering Development Units, and
This spending item is part of a $165,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 8/19/2009 |
TONY VACCA CONSTRUCTION INC. | $621,559 | Remodel Science Lab South First Floor | National Aeronautics and Space Administration | 9/30/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $600,000 | The objective of this task is to enhance NASA's capability to communicate the results of NASA's Earth Science program and its relevance to today's scientific and social challenges, particularly in the area of global climate change. The result will be to | National Aeronautics and Space Administration | 10/29/2009 |
ROLLING HILLS RESEARCH CORP | $600,000 | This contract is a Phase 2 Small Business Innovative Research (SBIR) program that seeks to develop an innovative sensor system that can detect separated flow over a wide range of flight or ground test conditions. The Phase 1 program demonstrated the feas | National Aeronautics and Space Administration | 12/01/2009 |
ADVANCED SCIENCE AND NOVEL TECHNOLOGY | $599,924 | The program is devoted for the development and fabrication of ultra-high speed ADC. | National Aeronautics and Space Administration | 9/30/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $500,000 | Deformation, Ecosystem Structure, and Dynamics of Ice (DESDynI) mission was one of the missions recommended to NASA in supoort of the Earth Science and Applications from Space. The msision explicitly addresses the fundamental question for Earth Sciences | National Aeronautics and Space Administration | 11/23/2009 |
THE BOEING COMPANY | $499,000 |
ACFS Upgrade Development: Phase 3 Integration. The Contractor shall develop and implement a plan to upgrade the Advanced Concepts Flight Simulator (ACFS). The results shall be, the ACFS lab will have updated simulation software that is fully integrated w
This spending item is part of a $822,000 allocation.
See details
|
National Aeronautics and Space Administration | 3/22/2010 |
LEFIELL MANUFACTURING COMPANY | $476,491 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Carlton Forge Works | $463,940 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MISSION CRITICAL TECHNOLOGIES, INC. | $424,373 |
This task supports NASA Recovery Act work sponsored by the Science Mission Directorate and the Earth Science Research & Applications Program. NASA Earth Science program studies Earth from space to advance scientific understanding and meet societal needs.
This spending item is part of a $500,000 allocation.
See details
|
National Aeronautics and Space Administration | 12/02/2009 |
A P R CONSULTING, INC. | $324,576 |
The CERES sensors provide accurate measurements of the EarthG??s reflected solar and EarthG??s emitted thermal radiation. These measurements are critical for understanding the EarthG??s total climate system and improving climate prediction models. Recov
This spending item is part of a $21,164,815 allocation.
See details
|
National Aeronautics and Space Administration | 8/06/2009 |
ROLLING HILLS RESEARCH CORP | $300,000 |
This contract is a Phase 2 Small Business Technology Transfer (STTR) program that seeks to utilize expertise at California Polytechnic State University, San Luis Obispo, in rocket motor testing and a unique nitrous oxide cooling application, and combine i
This spending item is part of a $600,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/23/2009 |
C J W CONSTRUCTION, INC. | $272,287 |
This project was initiated to create an onsite Life Support Area for the pilots at the Dryden Flight Research Center Bldg. #703. NASA is planning to bring additional planes to DFRC site and currently the only Life Support Area is located at Edwards Air Fo
This spending item is part of a $428,677 allocation.
See details
|
National Aeronautics and Space Administration | 8/10/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $270,513 | NASA has assigned Goddard Modeling and Analysis Office (GMAO) the task of developing and Integrated Earth System Analysis (IESA) In support of that effort, JPL will lead a team consisting of members from the Goddard Institute for Space Studies (GISS), G | National Aeronautics and Space Administration | 10/15/2009 |
FIDELL ASSOCIATES INC | $263,911 | The Supersonics Project is aligned with the ARMD principles of maintaining intellectual stewardship of aeronautical core competencies for the nation in the supersonic flight regime and of focusing research in areas that are appropriate to NASA?s unique ca | National Aeronautics and Space Administration | 6/07/2010 |
PROCESS FAB INC. | $256,303 |
Task order completed 3/30/2011. For this task order, the Contarctor shall design, analyze, and fabricate tooling for a large-scale multi-bay test article that is capable of withstanding bending and internal pressure loadings
This spending item is part of a $4,997,767 allocation.
See details
|
National Aeronautics and Space Administration | 2/18/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $244,631 | The Joint Center for Satelllite Data Assimilation (JCSDA) will lead a task that will test a new transmittance algorithm, prepare the operational analysis software to assimilate radiance data from the Microwave Limb Sounder on Aura, and will prototype a po | National Aeronautics and Space Administration | 10/14/2009 |
WYLE LABORATORIES, INC. | $235,170 |
Develop a total of 3 Sonic Boom Focus Research Software Codes (capable of traditional and conceptual low-boom aircraft analysis), and design and assist in the execution of a flight experiment under a range of realistic atmosphereic conditions to validate
This spending item is part of a $407,138 allocation.
See details
|
National Aeronautics and Space Administration | 6/21/2010 |
LOCKHEED MARTIN CORPORATION | $203,441 |
NASA is exploring advanced composite materials and processes to reduce the overall cost and weight of liquid hydrogen (LH2) cryotanks. Composites are materials that are combinations of two or more organic or inorganic components. One material serves as a
This spending item is part of a $1,855,172 allocation.
See details
|
National Aeronautics and Space Administration | 9/28/2010 |
DYNAMIC ENTERPRISES, INC. | $184,872 |
Advance the James Webb Space Telescope project towards mission Critical Design Review.
This spending item is part of a $65,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 7/14/2009 |
PRATT & WHITNEY ROCKETDYNE, INC. | $182,000 |
This program is a 24 month effort to identify, design, and perform validation trials on combustor concepts that will meet NASA N+2 NOx emissions goal of 75% below CAEP/6. The combustor cycle conditions will be based on an engine cycle architecture and te
This spending item is part of a $7,354,981 allocation.
See details
|
National Aeronautics and Space Administration | 2/11/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $173,000 | JPL will support the Hurricane and Severe Storm Sentinel (HS3) project by operating the High Altitude MMIC Sounding Radiometer (HAMSR) on the Global Hawk aircraft during all planned 2011 test flights. The HAMSR instrument was developed by NASA on a previ | National Aeronautics and Space Administration | 8/30/2010 |
PROCESS FAB INC. | $159,311 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
AMRO FABRICATING CORPORATION | $158,680 |
Task order completed 3/30/2011. For this task order, the Contarctor shall design, analyze, and fabricate tooling for a large-scale multi-bay test article that is capable of withstanding bending and internal pressure loadings
This spending item is part of a $4,997,767 allocation.
See details
|
National Aeronautics and Space Administration | 2/18/2010 |
WYLE LABORATORIES, INC. | $148,702 |
Low Boom Community Response Pilot Program. The Supersonics Project is developing technologies that will potentially lower a sonic boom to levels acceptable to teh general community.
This spending item is part of a $298,702 allocation.
See details
|
National Aeronautics and Space Administration | 7/09/2010 |
PRATT & WHITNEY ROCKETDYNE, INC. | $145,000 |
This program is a 24 month effort to identify, design, and perform validation trials on combustor concepts that will meet NASA N+2 NOx emissions goal of 75% below CAEP/6. The combustor cycle conditions will be based on an engine cycle architecture and te
This spending item is part of a $7,354,981 allocation.
See details
|
National Aeronautics and Space Administration | 2/11/2010 |
BERANEK, INC. | $142,560 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
GEOLOGICS CORPORATION | $135,665 |
Advance the James Webb Space Telescope project towards mission Critical Design Review.
This spending item is part of a $65,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 7/14/2009 |
BERANEK, INC. | $125,610 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
TYBRIN CORPORATION | $120,072 | Facilities Engineering and Asset Management Office Support: TYBRIN will provide a systems engineering appoach to the identification, documentation and lifecycle management of speciified facility project requirements at the Dryden Aircraft OperationsFacil | National Aeronautics and Space Administration | 6/18/2010 |
THE BOEING COMPANY | $120,000 |
Developed and implemented a simulated fly-by-wire augmented flight control system for a commercial transport aircraft. Integrated model of the commercial transport aircraft, including the fly-by-wire augmented flight control systems model, into the Advanc
This spending item is part of a $276,131 allocation.
See details
|
National Aeronautics and Space Administration | 7/29/2010 |
AK Constructors, Inc. | $88,490 |
This project was initiated to create an onsite Life Support Area for the pilots at the Dryden Flight Research Center Bldg. #703. NASA is planning to bring additional planes to DFRC site and currently the only Life Support Area is located at Edwards Air Fo
This spending item is part of a $428,677 allocation.
See details
|
National Aeronautics and Space Administration | 8/10/2009 |
MODULAR SYSTEMS NETWORK, INC. | $82,381 | Systems Furniture for DAOF Bldg 703, Pilot's Offices | National Aeronautics and Space Administration | 6/01/2010 |
ADC ENGINEERING TECHNOLOGY, INC. | $79,200 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Amro Fabricating Corporation | $74,950 |
The contractor shall perform the following tasks: 1. Procure and deliver the Marshal
This spending item is part of a $34,455,634 allocation.
See details
|
National Aeronautics and Space Administration | 3/15/2010 |
AMRO FABRICATING CORPORATION | $74,950 |
The contractor shall perform the following tasks: 1. Procure and deliver the Marshal
This spending item is part of a $34,455,634 allocation.
See details
|
National Aeronautics and Space Administration | 3/15/2010 |
MODULAR SYSTEMS NETWORK, INC. | $69,996 | systems furniture for DAOF, Bldg 703, Package 6A | National Aeronautics and Space Administration | 5/29/2010 |
VOTAW PRECISION TECHNOLOGIES, INC. | $66,209 |
Task order completed 3/30/2011. For this task order, the Contarctor shall design, analyze, and fabricate tooling for a large-scale multi-bay test article that is capable of withstanding bending and internal pressure loadings
This spending item is part of a $4,997,767 allocation.
See details
|
National Aeronautics and Space Administration | 2/18/2010 |
PRATT & WHITNEY ROCKETDYNE, INC. | $65,408 |
This program is a 24 month effort to identify, design, and perform validation trials on combustor concepts that will meet NASA N+2 NOx emissions goal of 75% below CAEP/6. The combustor cycle conditions will be based on an engine cycle architecture and te
This spending item is part of a $7,354,981 allocation.
See details
|
National Aeronautics and Space Administration | 2/11/2010 |
CAST PARTS INC | $65,127 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Deltek, Inc. | $60,265 |
Advance the James Webb Space Telescope project towards mission Critical Design Review.
This spending item is part of a $65,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 7/14/2009 |
YANG-MING INTERNATIONAL CORPORATION | $55,945 |
The objective of the Airborne Microwave Observatory of Subcanopy and Subsurface (AirMOSS) project is to significantly minimize the current uncertainty in net ecosystem carbon exchange (NEE) estimates over North America. Uncertaity in root-zone soil moist
This spending item is part of a $5,469,000 allocation.
See details
|
National Aeronautics and Space Administration | 8/26/2010 |
STADCO | $55,372 |
Task order completed 3/30/2011. For this task order, the Contarctor shall design, analyze, and fabricate tooling for a large-scale multi-bay test article that is capable of withstanding bending and internal pressure loadings
This spending item is part of a $4,997,767 allocation.
See details
|
National Aeronautics and Space Administration | 2/18/2010 |
International Radiation Detectors Inc | $52,866 |
TOTAL AND SPECTRAL IRRADIANCE SENSOR (TSIS) project: We will design, build, test, calibrate & deliver the TSIS instrument to Northrop Grumman Space Technology Corp., for inclusion on the National Polar-Orbiting Operational Environmental Satellite System
This spending item is part of a $26,307,665 allocation.
See details
|
National Aeronautics and Space Administration | 8/31/2009 |
PRATT & WHITNEY ROCKETDYNE, INC. | $50,000 |
This program is a 24 month effort to identify, design, and perform validation trials on combustor concepts that will meet NASA N+2 NOx emissions goal of 75% below CAEP/6. The combustor cycle conditions will be based on an engine cycle architecture and te
This spending item is part of a $7,354,981 allocation.
See details
|
National Aeronautics and Space Administration | 2/11/2010 |
ASCA, INC. | $49,910 |
Exploration, Recovery Act The Space Act Agreement awarded to ULA is anticipated to make significant progress on commercial crew spaceflight long lead capabilities, technologies, and commercial crew risk mitigation tasks as well as accelerate and mature the design and development o
This spending item is part of a $6,698,596 allocation.
See details
|
National Aeronautics and Space Administration | 1/30/2010 |
RYAN HERCO PRODUCTS CORP. | $42,741 |
Reactivation of Mitsubishi Make-Up Air (MUA) system for Unitary Plan Wind Tunnels (UPWT) Operation under contract NNA09DB39C.
This spending item is part of a $9,000,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/14/2009 |
Emcor Group, Inc. | $38,851 |
This project was initiated to create an onsite Life Support Area for the pilots at the Dryden Flight Research Center Bldg. #703. NASA is planning to bring additional planes to DFRC site and currently the only Life Support Area is located at Edwards Air Fo
This spending item is part of a $428,677 allocation.
See details
|
National Aeronautics and Space Administration | 8/10/2009 |
AMRO FABRICATING CORPORATION | $38,750 |
Task order completed 3/30/2011. For this task order, the Contarctor shall design, analyze, and fabricate tooling for a large-scale multi-bay test article that is capable of withstanding bending and internal pressure loadings
This spending item is part of a $4,997,767 allocation.
See details
|
National Aeronautics and Space Administration | 2/18/2010 |
Carlton Forge Works | $37,655 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MODULAR SYSTEMS NETWORK, INC. | $33,986 | systems furniture for DAOF, Bldg 703, Avionics Office | National Aeronautics and Space Administration | 6/01/2010 |
UNIVERSITY OF CALIFORNIA, LOS ANGELES | $31,310 |
The objective of this award is to establish the information infrastructure required to bring NASA instruments, observations and scientific and technical expertise to bear on water resource management needs in the drought-stricken American southwest. Water
This spending item is part of a $1,950,000 allocation.
See details
|
National Aeronautics and Space Administration | 9/30/2009 |
ULTRAMET | $30,000 |
Demonstrate the technical feasibility of the Advanced Carbothermal Electric Reactor concept to extract oxygen and other useful products from the extraterrestrial regolith (Moon, Mars, asteroids, etc.).
This spending item is part of a $100,000 allocation.
See details
|
National Aeronautics and Space Administration | 1/29/2010 |
HOH AERONAUTICS, INC. | $29,999 | Take, reduce, and analyze the flight data gathered from the flight experiments to be flown on an F-16 Variable Stability In-Flight Simulator Test Aircraft and provide NASA with a final report. | National Aeronautics and Space Administration | 5/13/2010 |
Jory John Corporation | $29,049 |
This project was initiated to create an onsite Life Support Area for the pilots at the Dryden Flight Research Center Bldg. #703. NASA is planning to bring additional planes to DFRC site and currently the only Life Support Area is located at Edwards Air Fo
This spending item is part of a $428,677 allocation.
See details
|
National Aeronautics and Space Administration | 8/10/2009 |
PRATT & WHITNEY ROCKETDYNE, INC. | $25,000 |
This program is a 24 month effort to identify, design, and perform validation trials on combustor concepts that will meet NASA N+2 NOx emissions goal of 75% below CAEP/6. The combustor cycle conditions will be based on an engine cycle architecture and te
This spending item is part of a $7,354,981 allocation.
See details
|
National Aeronautics and Space Administration | 2/11/2010 |
MOONEY INDUSTRIES PRECISION MACHINING, INC. | $22,800 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Carlton Forge Works | $21,686 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
CALIFORNIA STATE UNIVERSITY AUXILIARY SERVICES, INC | $17,118 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MOONEY INDUSTRIES PRECISION MACHINING, INC. | $16,860 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
BERANEK, INC. | $14,875 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
TW METALS, INC. | $13,530 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
BERANEK, INC. | $11,180 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MICRO STEEL INC. | $9,408 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MOONEY INDUSTRIES PRECISION MACHINING, INC. | $9,216 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Carlton Forge Works | $7,439 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
BERANEK, INC. | $7,380 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
G & D Industries Inc | $5,495 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
FINN TOOL AND INSTRUMENTS, INC. | $4,900 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
G & D Industries Inc | $4,602 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
FINN TOOL AND INSTRUMENTS, INC. | $4,600 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
FINN TOOL AND INSTRUMENTS, INC. | $4,300 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
ADC ENGINEERING TECHNOLOGY, INC. | $3,775 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MODULAR SYSTEMS NETWORK, INC. | $2,975 | Media Station for DAOF, Bldg 703, Executive Conference Room | National Aeronautics and Space Administration | 5/29/2010 |
G & D Industries Inc | $2,280 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
FINN TOOL AND INSTRUMENTS, INC. | $1,800 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
FINN TOOL AND INSTRUMENTS, INC. | $1,700 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MOONEY INDUSTRIES PRECISION MACHINING, INC. | $1,615 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
BERANEK, INC. | $1,520 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
FINN TOOL AND INSTRUMENTS, INC. | $1,500 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
BERANEK, INC. | $930 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Pentacon Inc | $730 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
G & D Industries Inc | $695 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Metals Technology, Inc | $559 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
G & D Industries Inc | $362 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
MOONEY INDUSTRIES PRECISION MACHINING, INC. | $350 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
KAP MANUFACTURING, INC. | $315 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
G & D Industries Inc | $280 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
G & D Industries Inc | $178 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
Metals Technology, Inc | $150 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |
W. W. Grainger, Inc. | $79 |
American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical
This spending item is part of a $48,900,000 allocation.
See details
|
National Aeronautics and Space Administration | 10/21/2009 |