Monterey County, Calif., funds by Army, Department of
Listing $10,095,776.55 in stimulus funds from Army, Department of for Monterey
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ENVIRONMENTAL ASSESSMENT AND REMEDIATION MANAGEMENT, INC. | $2,858,798 | Construction of two new Visitor Centers and two new Search offices at the Bolio Gate, Franklin Gate,High Street and Taylor Street respectively | U.S. Army Corps of Engineers, except civil program financing | 9/27/2009 |
Fresno Plumbing & Heating Inc. | $675,754 | Replace Barracks Toilets - various | Army, Department of | 7/13/2010 |
J & J MAINTENANCE, INC. | $592,760 |
The purpose of this task order is to provide a Type III Work Plan, the construction of a 600 sq ft expansion to, and repairs to modernize the utilities and medical functions of building 4390 at Ft Ord, CA.
This spending item is part of a $2,101,613 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 11/30/2009 |
ONSITE CONSTRUCTION & ENGINEERING, INC. | $516,028 | Replace Windows in Barracks @ Bldg #622 in Presidio of Monterey, CA. | U.S. Army Corps of Engineers, except civil program financing | 8/23/2009 |
Grant Construction, Inc. | $376,251 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
COLLINS ELECTRICAL COMPANY, INC. | $341,114 |
The purpose of this task order is to provide a Type III Work Plan, the construction of a 600 sq ft expansion to, and repairs to modernize the utilities and medical functions of building 4390 at Ft Ord, CA.
This spending item is part of a $2,101,613 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 11/30/2009 |
RED MOUNTAIN LLC | $281,712 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
WILSON, GEO H INC | $281,623 |
Replace Failing HVAC Systems, Barracks Buildings 647, 650, 651.
This spending item is part of a $315,256 allocation.
See details
|
Army, Department of | 8/20/2009 |
GOSTANIAN GENERAL BUILDING CORP | $260,396 | Remove asbestos containing material and replace floor covering in Building 652 barracks at Presidio of Monterey, CA | Army, Department of | 9/03/2009 |
GOSTANIAN GENERAL BUILDING CORP | $260,396 | Remove asbestos containing material and replace floor covering in Building 651 barracks at Presidio of Monterey, CA | Army, Department of | 9/03/2009 |
GOSTANIAN GENERAL BUILDING CORP | $260,396 | Replace Carpet, Barracks 652 | U.S. Army Corps of Engineers, except civil program financing | 9/03/2009 |
GOSTANIAN GENERAL BUILDING CORP | $260,396 | Replace Floor Covering, Building 651 | U.S. Army Corps of Engineers, except civil program financing | 9/03/2009 |
GRANITE CONSTRUCTION COMPANY | $223,223 |
Repair Unsafe/Failed Access Roads and Paved Areas, C Company, 9th Signal Command.
This spending item is part of a $311,107 allocation.
See details
|
Army, Department of | 8/21/2009 |
BLACK BULL CONSTRUCTION INC. | $221,126 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
BRANNON INC | $216,070 |
Remove Inactive Communication Lines Base Wide.
This spending item is part of a $333,382 allocation.
See details
|
Army, Department of | 7/15/2009 |
STOLLMEYER ENGINEERING, INC. | $200,867 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $147,738 | Replace Deterriorating and Leaking Water Lines Servicing DLI Classrooms. | Army, Department of | 8/21/2009 |
Estrella Associates, Inc. | $126,133 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
WEBCO | $124,423 |
AS A PART OF OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, THIS CONTRACT PROVIDES FOR ASBESTOS MITIGATION AND ABATEMENT AT THE PRESIDIO OF MONTEREY. PROJECT #38508; LOCATION: MONTEREY, CA. ASBESTOS MITIGATE AND ABATEMENT, PRESIDIO OF MONTEREY CALIFORNI
This spending item is part of a $281,234 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |
MONTEREY, CITY OF | $117,312 |
Remove Inactive Communication Lines Base Wide.
This spending item is part of a $333,382 allocation.
See details
|
Army, Department of | 7/15/2009 |
COLLINS ELECTRICAL COMPANY, INC. | $115,124 |
Install/Modernize Exterior Lighting for Barracks Areas, 800 and 600 Series.
This spending item is part of a $157,879 allocation.
See details
|
Army, Department of | 8/21/2009 |
Walter G Beck III | $114,471 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $96,909 | Replace Failing Water Laterals Supporting Classroom Buildings 209-218. | Army, Department of | 8/21/2009 |
Homer T. Hayward Lumber Co. | $96,733 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $91,141 | Repair Natural Gas Systems. | Army, Department of | 8/21/2009 |
Central Valley Exteriors | $90,330 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $87,884 |
Repair Unsafe/Failed Access Roads and Paved Areas, C Company, 9th Signal Command.
This spending item is part of a $311,107 allocation.
See details
|
Army, Department of | 8/21/2009 |
C B C Roofing Inc | $86,450 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
RMP SAFETY SERVICES | $76,324 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Trombley Painting Co | $75,710 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
SC Dunn Drywall | $68,364 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
TROFHOLZ TECHNOLOGIES, INC. | $61,480 | Install Turnstile at Taylor Gate, Presidio of Monterey | U.S. Army Corps of Engineers, except civil program financing | 9/15/2009 |
Henry Schmitz Plumbing | $59,301 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $58,937 | Replace Failing HVAC System CPAC Building 277. | Army, Department of | 8/20/2009 |
MONTEREY, CITY OF | $55,802 | Install Fire Sprinkler Heads, DLI Classrooms, Building 611. | Army, Department of | 8/20/2009 |
James Sommerville Inc | $52,836 |
Construct Sidewalk to Access DLI Cloassrooms, Health and Safety.
This spending item is part of a $85,448 allocation.
See details
|
Army, Department of | 8/20/2009 |
MONTEREY, CITY OF | $42,755 |
Install/Modernize Exterior Lighting for Barracks Areas, 800 and 600 Series.
This spending item is part of a $157,879 allocation.
See details
|
Army, Department of | 8/21/2009 |
Templeton Floor Company, Inc. | $38,850 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $33,633 |
Replace Failing HVAC Systems, Barracks Buildings 647, 650, 651.
This spending item is part of a $315,256 allocation.
See details
|
Army, Department of | 8/20/2009 |
MONTEREY, CITY OF | $32,613 |
Construct Sidewalk to Access DLI Cloassrooms, Health and Safety.
This spending item is part of a $85,448 allocation.
See details
|
Army, Department of | 8/20/2009 |
MTM ENGINEERING & CONTRACTING SERVICES, INC. | $31,041 |
AS A PART OF OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, THIS CONTRACT PROVIDES FOR ASBESTOS MITIGATION AND ABATEMENT AT THE PRESIDIO OF MONTEREY. PROJECT #38508; LOCATION: MONTEREY, CA. ASBESTOS MITIGATE AND ABATEMENT, PRESIDIO OF MONTEREY CALIFORNI
This spending item is part of a $281,234 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |
FENCE FACTORY | $28,292 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
GOSTANIAN GENERAL BUILDING CORP | $27,555 | Repair Deteriorated Floor, Cuilding 630 | U.S. Army Corps of Engineers, except civil program financing | 8/31/2009 |
A Plus Fire Protection | $25,250 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
M3 ENVIRONMENTAL CONSULTING | $24,145 |
AS A PART OF OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, THIS CONTRACT PROVIDES FOR ASBESTOS MITIGATION AND ABATEMENT AT THE PRESIDIO OF MONTEREY. PROJECT #38508; LOCATION: MONTEREY, CA. ASBESTOS MITIGATE AND ABATEMENT, PRESIDIO OF MONTEREY CALIFORNI
This spending item is part of a $281,234 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |
Gsi Soils Inc | $22,866 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Landscape Development, Inc. | $22,845 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Western Insulation, Inc. | $18,977 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
3C ENGINEERING, INC. | $16,090 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
WALLACE GROUP | $13,956 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
WEBCO | $12,730 |
INSTALL SAFETY COMPONENTS IN COMMUNICATIONS CLOSETS: EMERGENCY LIGHTING, EMERGENY SHUT OFF SWITCHES, FIRE SUPPRESSION AND TEMPERATURE CONTROLS AT PRESIDIO OF MONTEREY, CA
This spending item is part of a $67,085 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/15/2009 |
GRIFFIN CARPETS INC | $8,473 |
AS A PART OF OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, THIS CONTRACT PROVIDES FOR ASBESTOS MITIGATION AND ABATEMENT AT THE PRESIDIO OF MONTEREY. PROJECT #38508; LOCATION: MONTEREY, CA. ASBESTOS MITIGATE AND ABATEMENT, PRESIDIO OF MONTEREY CALIFORNI
This spending item is part of a $281,234 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |
FERGUSON ENTERPRISES, INC. | $8,098 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Hamon Overhead Door Company, Inc. | $7,530 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Contemporary Home Services | $6,950 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Pestmaster Svcs | $5,994 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Mike Roach Electric Inc | $5,165 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Design Genre International | $5,050 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
CENTRAL COAST CCD LLC | $4,921 |
AS A PART OF OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, THIS CONTRACT PROVIDES FOR ASBESTOS MITIGATION AND ABATEMENT AT THE PRESIDIO OF MONTEREY. PROJECT #38508; LOCATION: MONTEREY, CA. ASBESTOS MITIGATE AND ABATEMENT, PRESIDIO OF MONTEREY CALIFORNI
This spending item is part of a $281,234 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |
MTM ENGINEERING & CONTRACTING SERVICES, INC. | $4,256 |
INSTALL SAFETY COMPONENTS IN COMMUNICATIONS CLOSETS: EMERGENCY LIGHTING, EMERGENY SHUT OFF SWITCHES, FIRE SUPPRESSION AND TEMPERATURE CONTROLS AT PRESIDIO OF MONTEREY, CA
This spending item is part of a $67,085 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/15/2009 |
ATLAS PERFORMANCE INDUSTRIES, INC. | $4,164 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
WEBCO | $3,630 |
REPAIR CORRODED EXTERNAL SURFACES BLDG 84 @ PRESIDIO OF MONTEREY
This spending item is part of a $24,666 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/15/2009 |
FERGUSON ENTERPRISES, INC. | $2,902 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Fence Factory A California Corporation | $2,293 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Pacific Coast Fireplaces, Inc | $1,499 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MTM ENGINEERING & CONTRACTING SERVICES, INC. | $1,130 |
REPAIR CORRODED EXTERNAL SURFACES BLDG 84 @ PRESIDIO OF MONTEREY
This spending item is part of a $24,666 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/15/2009 |
Fence Factory A California Corporation | $816 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
Fence Factory A California Corporation | $484 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
FERGUSON ENTERPRISES, INC. | $213 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
FERGUSON ENTERPRISES, INC. | $195 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
FERGUSON ENTERPRISES, INC. | $105 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
MONTEREY, CITY OF | $0 |
Replace Barracks Toilets - various
This spending item is part of a $545,656 allocation.
See details
|
Army, Department of | 7/13/2010 |