Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Orange County, Calif., funds by General Services Administration

Listing $72,826,252.29 in stimulus funds from General Services Administration for Orange

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SOUTHLAND INDUSTRIES $29,964,000 Design-build services for the construction of the new Social Security Administration (SSA) National Service Center (NSC) in Urbana, MD.
This spending item is part of a $191,596,000 allocation. See details
Public Buildings Service 1/13/2012
CAPITOL COACHWORKS, INC $9,980,073 Buses General Services Administration 12/22/2009
CAPITOL COACHWORKS, INC $9,881,261 BUSES General Services Administration 9/18/2009
Multi Mechanical, Inc. $6,603,436 'PS58 - Scope of work includes demolition, removal, and disposal of existing Heating, Ventilation and Air Conditioning ductwork, installation and appunenances on Floors 5, 6, 8, 1 South and Passenger Elevator Lobbies in conjunction with the ''Recovery'' U
This spending item is part of a $13,128,830 allocation. See details
Public Buildings Service 5/29/2009
A.J. Kirkwood & Associates, Inc $4,941,199 Construction contract for remodel of Post Office/Courthouse located in San Antonio, Texas.
This spending item is part of a $50,348,552 allocation. See details
Public Buildings Service 7/24/2009
INDEPENDENT ENERGY SOLUTIONS, INC. $4,079,087 Provide a total turnkey project including design, manufacturing/acquisition and installation services for the installation of a roof-mount utility-interactive photovoltaic system.
This spending item is part of a $4,079,963 allocation. See details
Public Buildings Service 3/26/2010
CUMMING CLARKE $1,796,232 Gensler has been awarded a contract through the GSA for design and design-related services for the 'Recovery' project entitled 'Repairs and Alterations to the Prince Jonah Kuhio Kalanianaole Federal Building and U.S. Courthouse located at 300 Ala Moana Bo
This spending item is part of a $32,457,801 allocation. See details
Public Buildings Service 7/24/2009
VETERAN CONSTRUCTION GROUP, INC. $1,134,011 Upgrade parking lot lighting around the facility including demo removal of existing parking lot light poles, conduits, wiring pedestals. Installation of new parking lot light poles. Trenching for new conduits, new wiring new light poles, poles pedestals, Public Buildings Service 3/31/2010
DOW DIVERSIFIED, INC. $883,044 Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation. See details
Public Buildings Service 3/18/2010
ACCO ENGINEERED SYSTEMS, INC. $748,362 ARRA (American Recovery Reinvestment Act) BAS (Building Automation System) Replacement at Chet Holifield Federal Building, Laguna Niguel, CA (California). Modification was given to incorporate the following: 1 - Reheat terminal unit (181) 2 - Double duct Public Buildings Service 2/25/2010
GENLYTE THOMAS GROUP LLC $440,275 Energy Saving Lighting Retrofit - To furnish and install lighting fixtures.
This spending item is part of a $702,190 allocation. See details
Public Buildings Service 2/26/2010
MESA ENERGY SYSTEMS, INC. $387,898 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
BOWCON COMPANY INC $322,656 Water conservation project - remove & replace existing restroom fixtures with high efficiency restroom fixtures at the Chet Holifield Federal Building. Public Buildings Service 2/25/2010
PORTABLE WAREHOUSE CORP., THE $253,126 Computer/IT equipment Office of the Federal Acquisition Service 3/25/2010
ACCO ENGINEERED SYSTEMS, INC. $250,927 ARRA (American Recovery and Reinvestment Act) - HVAC (Heating Ventilation and Air-Conditioning) / Mechanical Improvement at Chet Holifield Federal Building, Laguna Niguel, CA Public Buildings Service 3/26/2010
PARISI TOWER REBUILD INC $239,427 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
PORTABLE WAREHOUSE CORP., THE $238,798 Microcomputers, desktops, laptops, Servers and accessories Office of the Federal Acquisition Service 6/10/2010
PORTABLE WAREHOUSE CORP., THE $118,029 IT Equipment, desktop, laptop computers, printers and accessories. General Services Administration 5/05/2009
ENOVITY, INC. $109,243 ARRA (American Recovery and Reinvestment Act) - Engineering Assessment and Specifications for Design-Build HVAC/BAS (Heating, Ventilation, Air Conditioning and Building Automation Systems) Project at Chet Holified Federal Building, Laguna Niguel, CA Public Buildings Service 1/04/2010
PORTABLE WAREHOUSE CORP., THE $102,270 Microcomputers, desktops, laptops, servers and accessories. Office of the Federal Acquisition Service 9/14/2010
PREFERRED CEILINGS, INC $54,803 'PS58 - Scope of work includes demolition, removal, and disposal of existing Heating, Ventilation and Air Conditioning ductwork, installation and appunenances on Floors 5, 6, 8, 1 South and Passenger Elevator Lobbies in conjunction with the ''Recovery'' U
This spending item is part of a $13,128,830 allocation. See details
Public Buildings Service 5/29/2009
INTERACTIVE RESOURCES, INC $54,353 Site survey, working drawings, post construction contract services, record documents, and light measurements for LED (light emitting diodes) parking lot lighting project at the Laguna Niguel Federal Building, Laguna Niguel, California.
This spending item is part of a $76,807 allocation. See details
Public Buildings Service 12/16/2009
Harris & Associates Inc $52,585 Construction Management Services for Federal Courthouse in Bakersfield, CA.
This spending item is part of a $2,130,426 allocation. See details
Public Buildings Service 9/24/2009
MAGNETIC ELECTRIC, INC. $41,645 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
INGRAM MICRO INC $39,806 Supply Hardware, Software and Maintenance
This spending item is part of a $599,879 allocation. See details
Office of the Federal Acquisition Service 7/30/2010
CHICAGO TITLE COMPANY $29,602 Title and Legal Support for real estate acquisition
This spending item is part of a $29,919 allocation. See details
Public Buildings Service 10/21/2009
Hinkle, Dale P. E., Inc. $21,320 The purpose of the geotechnical investigation prior to new courthouse design is to determine the character and physical properties of the soil deposits of the 2.5 acre site and their potential as foundations for structures and as material for earthwork co
This spending item is part of a $36,510 allocation. See details
Public Buildings Service 5/07/2009
A&P DEVELOPMENT & CONSTRUCTION, INC. $15,254 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
DEVELOPMENT ONE, INC. $12,212 The purpose of the geotechnical investigation prior to new courthouse design is to determine the character and physical properties of the soil deposits of the 2.5 acre site and their potential as foundations for structures and as material for earthwork co
This spending item is part of a $36,510 allocation. See details
Public Buildings Service 5/07/2009
SIMPLEXGRINNELL LP $12,067 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
D. BURKE MECHANICAL CORP $7,000 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
Thermal Insulation Contractors Inc $6,270 HVAC/Mechanical Improvement at US Federal Courthouse, 312 Spring Street, Los Angeles, CA 90012 - implement mechanical and building automation (BAS) improvements which includes Project 1-reducing exhaust away from S8 intake; Project 2-upgrading BAS; Projec
This spending item is part of a $5,019,250 allocation. See details
Public Buildings Service 3/26/2010
DONN C GILMORE & ASSOC INC $3,800 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
TECTA AMERICA CORP. $876 Provide a total turnkey project including design, manufacturing/acquisition and installation services for the installation of a roof-mount utility-interactive photovoltaic system.
This spending item is part of a $4,079,963 allocation. See details
Public Buildings Service 3/26/2010
SO CAL SANITATION LLC $805 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010
Roessler Design Group $500 HVAC/Mechanical Improvement at Chet Holifield Federal Building, 24000 Avila Road, Laguna Niguel, CA 92677: implement mechanical and building automation system (BAS) improvements including: Project 1-replacing existing rooftop packaged air source heat pump
This spending item is part of a $708,396 allocation. See details
Public Buildings Service 3/29/2010