San Luis Obispo County, Calif., funds by Army, Department of
Listing $11,006,651.38 in stimulus funds from Army, Department of for San Luis Obispo
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
RED MOUNTAIN LLC | $2,130,343 |
Remove and replace all 2,496 of the WWII wood single pane windows in the 4000 area barracks buildings of Camp Roberts & all 2,496 of the WWII wood single pane windows in the 5000 area barracks buildings of Camp Roberts.
This spending item is part of a $5,379,470 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
KING CITY GLASS & BODY INC | $1,322,880 |
Remove and replace all 2,496 of the WWII wood single pane windows in the 4000 area barracks buildings of Camp Roberts & all 2,496 of the WWII wood single pane windows in the 5000 area barracks buildings of Camp Roberts.
This spending item is part of a $5,379,470 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
ALLIED INDUSTRIES INC. | $1,309,560 | As part of the American Reinvestment and Recovery Act Project, this contract is for Renovation (Roof, HVAC, Int & Ext Paint, Breakroom) LOCATION: Salinas Field Maint Shop, CA. Renovate and construct an addition to the existing Salinas Field Maintenance S | U.S. Army Corps of Engineers, except civil program financing | 9/22/2009 |
BARAJAS & ASSOCIATES, INC. | $1,210,812 | As a part of the Operation and Maintenance, Army National Guard, Recovery Act, this contract provides for the following: Replace Water Main From Well C4A to C5A; As part of the construction on Water Main Replacement project to replace the water main from | Army, Department of | 12/23/2009 |
Mike Roach Electric Inc | $1,195,485 |
Remove and replace all 2,496 of the WWII wood single pane windows in the 4000 area barracks buildings of Camp Roberts & all 2,496 of the WWII wood single pane windows in the 5000 area barracks buildings of Camp Roberts.
This spending item is part of a $5,379,470 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
ONEIDA TOTAL INTEGRATED ENTERPRISES, LLC | $989,918 | As part of the National Guard Bureau, Office of the Chief-Operation and Maintenance program for the MTC-H Camp Roberts project, this contract will replace a gas line. | U.S. Army Corps of Engineers, except civil program financing | 12/23/2009 |
AFM ENVIRONMENTAL INC | $609,174 |
Remove and replace all 2,496 of the WWII wood single pane windows in the 4000 area barracks buildings of Camp Roberts & all 2,496 of the WWII wood single pane windows in the 5000 area barracks buildings of Camp Roberts.
This spending item is part of a $5,379,470 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
BARAJAS & ASSOCIATES, INC. | $463,217 | As a part of the Operations and Maintenance, Army National Guard, Recovery Act, this contract provides for a waterline from the S-1 to 5000 Area at Camp Roberts, CA. Project #:06R9029 Location: Camp Roberts, CA | Army, Department of | 9/04/2009 |
ERICK AMMON INC | $357,236 |
As part of the National Guard Bureau, Office of the Chief - Operation and Maintenance program for the MTC-H Camp Roberts project, this contract will replace a water well. This project start has been delayed and is not started.
This spending item is part of a $819,334 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/23/2009 |
ALPINE DIVERSIFIED, INC. | $280,611 |
ROOFING AND EVAPORATIVE COOLER UPGRADES AT THE CALIFORNIA NATIONAL GUARD MATES FACILITY AT CAMP ROBERTS, CA.
This spending item is part of a $2,994,611 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
ONEIDA TOTAL INTEGRATED ENTERPRISES, LLC | $279,634 | As a part of Operations and Maintenance for the Army National Guard Project number 06R9008 is for Building 6023 (Victory Theater) Siding; Install siding; replacing windows and down spouts and gutters at Camp Roberts, CA | U.S. Army Corps of Engineers, except civil program financing | 9/15/2009 |
ONEIDA TOTAL INTEGRATED ENTERPRISES, LLC | $268,639 | As a part of Operations and Maintenance for the Army National Guard project number 06R9037 is to Upgrade Building Systems Building 6023 at Camp Roberts, CA and to Renovate and Repair Male and Female Latrines in the Camp Roberts Victory Theatre, Building 6 | U.S. Army Corps of Engineers, except civil program financing | 9/28/2009 |
BARAJAS & ASSOCIATES, INC. | $264,869 | This project is to repair, stabilize and prevent future damage of the existing overflow drainage that supports Tank N-1, ensure a down slope roadis not damaged and provide a stable hillside that supports the tank foundation. This project will use earth-m | U.S. Army Corps of Engineers, except civil program financing | 9/10/2009 |
Estrella Associates, Inc. | $183,680 |
Design and construction of a single structure and all necessary work for a total of Four (4) 4 BR / 2B JNCO (Junior Non-Commissioned Officer) housing units and a single structure for a Garrison Commanders Residence on Governmentowned land at Ft Hunter Lig
This spending item is part of a $2,404,432 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
BARAJAS & ASSOCIATES, INC. | $118,690 | This project is to repair, stabilize and prevent future damage of the existing overflow drainage that supports Tank S-1, ensure a down slope roadis not damaged and provide a stable hillside that supports the tank foundation. This project will use earth-m | U.S. Army Corps of Engineers, except civil program financing | 9/10/2009 |
West Coast Mechanical | $21,904 |
AS A PART OF OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, THIS CONTRACT PROVIDES FOR ASBESTOS MITIGATION AND ABATEMENT AT THE PRESIDIO OF MONTEREY. PROJECT #38508; LOCATION: MONTEREY, CA. ASBESTOS MITIGATE AND ABATEMENT, PRESIDIO OF MONTEREY CALIFORNI
This spending item is part of a $281,234 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |