San Mateo County, Calif., funds by Department of Veterans Affairs
Listing $16,561,593.32 in stimulus funds from Department of Veterans Affairs for San Mateo
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SUNWIZE TECHNOLOGIES, INC. | $7,258,076 | Turn-key Solar PV System at the Medical Center at Palo Alto-Menlon Park Devision | Department of Veterans Affairs | 9/21/2010 |
HERRERA CORPORATION | $3,396,339 | Replace Emergency Power Systems, Phase II | Department of Veterans Affairs | 7/30/2010 |
PULLIAM CONSTRUCTION COMPANY, INC. | $2,138,509 |
Provide all plant, tools, labor, materials, equipment, supervision, transportation, to complete construction of new roadways and new parking lots in accordance with drawings and technical specifications provided with solicitation VA-261-10-RA-0033.
This spending item is part of a $3,419,449 allocation.
See details
|
Department of Veterans Affairs | 4/27/2010 |
KADENA PACIFIC, INC. | $1,548,062 |
Design-Build Replace emergency power systems, Menlo Park Division at the VA Palo Alto Health Care System, Menlo Park, CA
This spending item is part of a $1,857,100 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
PULLIAM CONSTRUCTION COMPANY, INC. | $524,777 |
Provide all plant, tools, labor, materials, equipment, supervision, transportation, to complete construction of expansion of storm water drainage system campus wide, for medical facilities in accordance with terms, conditions, drawings, and specifications
This spending item is part of a $719,777 allocation.
See details
|
Department of Veterans Affairs | 5/12/2010 |
ELLERY GROUP & RATTO CONSTRUCTION COMPANY, INC., THE | $352,051 | Provide all parts, labor , materials, equipment and supervision to renovate the interiors of Buildings 350 & 352, at Menlo Park VA. | Department of Veterans Affairs | 8/04/2009 |
Technology, Engineering & Construction, Inc. | $282,543 |
Design-Build Replace emergency power systems, Palo Alto Division at the VA Palo Alto Health Care System, Palo Alto, CA
This spending item is part of a $1,818,100 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
Technology, Engineering & Construction, Inc. | $272,692 |
Design-Build Replace emergency power systems, Livermore Division at the VA Palo Alto Health Care System, Livermore, CA
This spending item is part of a $1,952,527 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
Technology, Engineering & Construction, Inc. | $260,028 |
Design-Build Replace emergency power systems, Menlo Park Division at the VA Palo Alto Health Care System, Menlo Park, CA
This spending item is part of a $1,857,100 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
D. E. ERHARD CONSTRUCTION INC. | $180,950 | Replace Air Handler Units at Building 322 VA Menlo Park, under Palo Alto Health care System, Menlo Park, California | Department of Veterans Affairs | 9/22/2009 |
PATRIOT CONSTRUCTION, INC. | $150,053 |
Renovate for Auto Shop / Engineer Storage T44. Contractor shall provide all parts. Labor, materials, supplies, equipment and supervision requird to demolish Bldg. T-44 and construct new steel structure building at the Palo Alto Health Care System, Menlo P
This spending item is part of a $743,309 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
COMBINED EFFORT, INC. | $68,000 | Repair and slurry seal roads at the Golden Gate National Cemetery. | Department of Veterans Affairs | 8/14/2009 |
Walschon Fire Protection, Inc. | $58,000 |
Renovate for Auto Shop / Engineer Storage T44. Contractor shall provide all parts. Labor, materials, supplies, equipment and supervision requird to demolish Bldg. T-44 and construct new steel structure building at the Palo Alto Health Care System, Menlo P
This spending item is part of a $743,309 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
COMBINED EFFORT, INC. | $50,900 | Design build of soil cover structures at the Golden Gate National Cemetery. | Department of Veterans Affairs | 9/30/2009 |
COMBINED EFFORT, INC. | $20,614 | Remove and replace of carpet in administration building at the golden gate national cemetery. | Department of Veterans Affairs | 9/29/2009 |