Santa Clara County, Calif., funds by Energy, Department of
Listing $408,158,737.63 in stimulus funds from Energy, Department of for Santa Clara
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SOLOPOWER, INC. | $184,978,000 | Federal Loan Guarantees for Innovative Energy Technologies The loan guarantee to SoloPower, Inc. will support the development of thin-film solar panel manufacturing facilites in Portland, OR and will add additional back-end capacity to SoloPower's existing facility in San Jose, California. Project wiwill produce ph... Show more | Energy, Department of | 8/18/2011 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $49,522,405 | Conservation Research and Development The South Coast Air Quality Management District was awarded a Renewable Energy Research and Development program grant to develop a fully integrated production plug-in hybrid system for medium duty trucks, vans, pickups, and other vehicles. A demonstratio | Energy, Department of | 12/14/2009 |
CALERA CORPORATION | $21,366,319 | Industrial Carbon Capture and Storage (CCS) Application This award is to enable Calera Corporation to design, engineer and construct an operating plant to demonstrate the production of economic commercial products. The Calera Corporation process converts carbon dioxide (CO2) from the burning of fossisil fuel int... Show more | Energy, Department of | 1/15/2010 |
COULOMB TECHNOLOGIES, INC. | $15,001,287 | Conservation Research and Development CHARGE AMERICA will demonstrate the viability, economic and environmental benefits of an electric vehicle charging infrastructure. With the arrival of electric vehicles (EVG??s) and plug in electric vehicles (PHEVG??s) late 2010, there is a substantial la | Energy, Department of | 5/13/2010 |
SEAMICRO, INC. | $9,300,000 | Conservation Research and Development SeaMicro exists for the purpose of researching, developing, and bringing to market technology that reduces the power used by volume servers by 75%. The prototype of the SeaMicro compute appliance is with customers in beta testing. Funding through the Ener | Energy, Department of | 1/31/2010 |
SAN JOSE, CITY OF | $8,840,600 | Energy Efficiency and Conservation Block Grant Program (EECBG) EECBG funds were awarded for three program areas: 1. Municipal Energy Efficiency Program 2. LED Streetlight Program 3. Municipal Solar Program | Energy, Department of | 12/14/2009 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $5,006,011 | Advanced Research and Projects Agency Energy Financial Assistance Program Smart meters and related sensing technologies promise that energy information will change energy use. Poorly designed interactions with energy information, however, jeopardize billion dollar infrastructure investments. The currrrent problems are numerous: s... Show more | Energy, Department of | 1/14/2010 |
STION CORPORATION | $5,000,000 |
State Energy Program The State Energy Program will encompass three specific program areas: Green Jobs, Energy Efficiency Retrofits and Program Implementation and Delivery.
This spending item is part of a $226,093,000 allocation.
See details
|
Energy, Department of | 4/21/2009 |
SOLOPOWER, INC. | $4,997,169 |
State Energy Program The State Energy Program will encompass three specific program areas: Green Jobs, Energy Efficiency Retrofits and Program Implementation and Delivery.
This spending item is part of a $226,093,000 allocation.
See details
|
Energy, Department of | 4/21/2009 |
POWER ASSURE, INC. | $4,012,312 |
Conservation Research and Development This project represents a transformative change in the management of power consuming. IT equipment within data centers, which significantly reduces overall electrical power consumption. IT equipment efficiency results from data center equipment remains
This spending item is part of a $5,080,312 allocation.
See details
|
Energy, Department of | 1/31/2010 |
APPLIED MATERIALS, INC. | $3,993,891 | Conservation Research and Development Applied Materials, Inc proposes to develop and demonstrate an advanced epitaxial growth system for high-brightness LED manufacturers that will decrease operating costs, increase the internal quantum efficiency of LEDs, and improve binning yields. | National Energy Technology Laboratory | 6/01/2010 |
Varian, Inc. | $3,805,108 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
APPLIED MATERIALS, INC. | $3,748,990 |
Advanced Research and Projects Agency Energy Financial Assistance Program Applied Materials will develop process modules which optimize a porosity graded cathode on 3D current collector and to demonstrate their effectiveness in fabricating cells that meet BEEST FOA target metrics.
This spending item is part of a $4,373,990 allocation.
See details
|
Energy, Department of | 6/30/2010 |
KLA-TENCOR CORPORATION | $3,484,045 | Conservation Research and Development Integrated, automated yield management & defect source analysis inspection tooling and software | Energy, Department of | 3/16/2010 |
SOLADIGM, INC. | $3,467,541 | Conservation Research and Development The objective of this project is to transition Soladigm's dynamic window technology from a lab-scale, batch-type process for fabricating glass to a larger inline manufacturing process based on Soladigm's proprietary technology. This process will be optimi | Energy, Department of | 7/21/2010 |
SOLADIGM, INC. | $3,467,541 | Conservation Research and Development The objective of this project is to transition Soladigm's dynamic window technology from a lab-scale, batch-type process for fabricating glass to a larger inline manufacturing process based on Soladigm's proprietary technology. This process will be optimi | National Energy Technology Laboratory | 7/21/2010 |
O C MCDONALD CO INC | $3,465,390 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $3,200,000 |
Conservation Research and Development The objective of this proposal is to develop Extended Range Electric Vehicle (EREV) advanced propulsion technology and demonstrate a fleet of EREVs to gather data on vehicle performance and infrastructure to understand impacts on commercialization, while
This spending item is part of a $30,500,000 allocation.
See details
|
Energy, Department of | 3/29/2010 |
SILICON GENESIS CORPORATION | $3,000,000 | Renewable Energy Research and Development Novel Kerf-Free PV Wafering that produced low-cost approach to generate wafers from 150um to 50um in thickness. | Energy, Department of | 8/19/2009 |
PALO ALTO RESEARCH CENTER INCORPORATED | $3,000,000 | Renewable Energy Research and Development This project will develop a model of the chemical interactions between geothermal rocks, supercritical carbon dioxide and water. The geochemical model will be based on a foundation of both theory and measurements of chemical and physical interactions betw | Energy, Department of | 12/29/2009 |
ENERVAULT CORPORATION | $2,496,143 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis This project will demonstrate the commercial viability of EnerVaultG??s novel redox flow battery energy storage systems (BESS).
This spending item is part of a $4,764,284 allocation.
See details
|
Energy, Department of | 8/06/2010 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $2,478,989 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
SACRED HEART COMMUNITY SERVICE | $2,101,384 |
Weatherization Assistance for Low-Income Persons Recovery Act - Weatherization Assistance Program
This spending item is part of a $185,811,061 allocation.
See details
|
Energy, Department of | 3/31/2009 |
PHILIPS LUMILEDS LIGHTING COMPANY LLC | $1,907,963 | Conservation Research and Development Recovery Act: Low Cost Illumination Grad LED's | Energy, Department of | 6/01/2010 |
PHILIPS LUMILEDS LIGHTING COMPANY LLC | $1,837,168 | Conservation Research and Development 130 LPW 1000 LM Warm White LED for Illumination | Energy, Department of | 2/18/2010 |
APPLIED MATERIALS, INC. | $1,599,515 | Conservation Research and Development This project will develop high rate coating techniques for key layers to demonstrate the feasibility of a high throughput electrochromic manufacturing process. | National Energy Technology Laboratory | 8/04/2010 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $1,501,742 | Advanced Research and Projects Agency Energy Financial Assistance Program Stanford University and its collaborators will develop an all-electron battery (AEB0 which stores energy by moving electrons, rather than ions. The AEB is not a capacitor since it sues an electron/hole redox couple rather than n polarization of a double-lay... Show more | Energy, Department of | 7/09/2010 |
CONTINUUM ELECTRO-OPTICS, INC. | $1,474,925 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
SOUTHWALL TECHNOLOGIES INC. | $1,445,326 | Conservation Research and Development A. OBJECTIVES The objective of this project is the development of a Heat Mirror (HM)-based R-10 window solution with improved solar heat gain coefficient (SHGC) performance for the residential window market. Heat Mirror, with multi-cavity window performa | National Energy Technology Laboratory | 8/16/2010 |
SAN JOSE, CITY OF | $1,301,636 | Renewable Energy Research and Development As a Solar America City, San Jose is proud to partner with key stakeholders and the Department of Energy to implement a strategic plan that will result in a 15% increase of solar installations, a 50% increased awareness and knowledge of solar opportunitie | Energy, Department of | 1/01/2010 |
ULTRATECH, INC. | $1,295,634 | Conservation Research and Development Low Cost Lithography Tool For High Brightness LEDs | Energy, Department of | 3/15/2010 |
SUNNYVALE, CITY OF | $1,292,000 | Energy Efficiency and Conservation Block Grant Program (EECBG) EECBG grant | Energy, Department of | 9/25/2009 |
GORDON-PRILL, INC. | $1,213,011 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
SANTA CLARA, CITY OF | $1,180,900 | Energy Efficiency and Conservation Block Grant Program (EECBG) Funds will be used for the following projects: LED Lighting Retrofits, City PV Project at Henry Schmidt Park, LED Pedestrian Signal Retrofit Project, Retrocommissioning (RCx) of City Facilities, and Low Income/MultiFamily Weatherization n Program. These e... Show more | Energy, Department of | 12/08/2009 |
CUPERTINO ELECTRIC, INC. | $1,175,861 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
PALO ALTO RESEARCH CENTER INCORPORATED | $1,068,000 |
Conservation Research and Development This project represents a transformative change in the management of power consuming. IT equipment within data centers, which significantly reduces overall electrical power consumption. IT equipment efficiency results from data center equipment remains
This spending item is part of a $5,080,312 allocation.
See details
|
Energy, Department of | 1/31/2010 |
ASA COMPUTERS, INC. | $1,031,744 |
Award Title: Integrated Assessment Research. Award Purpose: Contribute to significant advances for the Integrated Assessment Research Program (IARP) whose goals are to improve understanding of and to develop leading national decision support tools regardi
This spending item is part of a $4,860,000 allocation.
See details
|
Office of Science | 8/12/2009 |
ROSENDIN ELECTRIC, INC. | $1,014,940 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
PEOPLE POWER COMPANY | $1,000,000 | Electricity Delivery and Energy Reliability, Research, Development and Analysis SBIR II | Office of Science | 6/07/2010 |
PEOPLE POWER COMPANY | $1,000,000 | SBIR II | Office of Science | 6/07/2010 |
LOS GATOS RESEARCH | $990,947 | Renewable Energy Research and Development Novel advanced sensors for real-time industrial process monitoring and control | Energy, Department of | 9/28/2010 |
COMMUNICATIONS & POWER INDUSTRIES LLC | $989,745 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
INFINERA CORPORATION | $920,702 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
WATTMINDER (YANG ASSOCIATES) | $889,984 | Office of Science Financial Assistance Program Phase II Web-Based Diagnostic Tools for online monitoring of Photovoltaic Systems | Office of Science | 9/01/2010 |
ROSENDIN ELECTRIC, INC. | $871,162 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
XL CONSTRUCTION CORPORATION | $858,236 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
WORLEYPARSONS POLESTAR, INC. | $738,150 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MOUNTAIN VIEW, CITY OF | $719,000 | Energy Efficiency and Conservation Block Grant Program (EECBG) EECBG PROGRAM - Community and municipal energy efficiency programs that will reduce greenhouse gases over several years | Energy, Department of | 12/31/2009 |
ROSENDIN ELECTRIC, INC. | $693,220 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $692,433 |
Renewable Energy Research and Development The National Geothermal Data System (NGDS) will be a distributed network of databases that collectively will build a system for data acquisition, management and maintenance and provide access to distributed data. Users of the system will include federal a
This spending item is part of a $4,992,089 allocation.
See details
|
Energy, Department of | 9/25/2009 |
ROBERT BOSCH LLC | $683,194 | Advanced Research and Projects Agency Energy Financial Assistance Program To increase the efficiency of the energy spectrum by enabling of storage for grid applications. | Energy, Department of | 10/01/2010 |
CALIFORNIA LABOR FEDERATION | $678,998 |
State Energy Program The State Energy Program will encompass three specific program areas: Green Jobs, Energy Efficiency Retrofits and Program Implementation and Delivery.
This spending item is part of a $226,093,000 allocation.
See details
|
Energy, Department of | 4/21/2009 |
WATTMINDER (YANG ASSOCIATES) | $666,002 |
Office of Science Financial Assistance Program Recovery Act Web-based diagnostic tools for online monitoring of photovoltaic systems
This spending item is part of a $749,983 allocation.
See details
|
Energy, Department of | 9/01/2010 |
PALO ALTO, CITY OF | $663,000 | Energy Efficiency and Conservation Block Grant Program (EECBG) With the stimulus funds provided through the Energy Efficiency Conservation Block Grant (formula grant), the City plans to undertake two separate projects: (1) an early replacement of some of its existing High Pressure Sodium street lighthts and (2) Home en... Show more | Energy, Department of | 9/21/2009 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $625,943 |
Geologic Sequestration Site Characterization The Two Elk Energy Park Industrial Carbon Capture and Storage Applications Project includes the analysis of existing data, data collection, drilling and completing a characterization well, modeling, risk assessment and mitigation, engagement activities, dd... Show more
This spending item is part of a $5,000,000 allocation.
See details
|
Energy, Department of | 9/09/2010 |
CAMBRIOS TECHNOLOGIES CORPORATION | $599,971 |
Conservation Research and Development The objective of this project is to develop a solution processable transparent conducting hole injection electrode (TCHI) to replace the combination of sputtered ITO electrode and hole injection layer (HIL). The TCHI electrode shall consist of two-materia
This spending item is part of a $1,199,971 allocation.
See details
|
Energy, Department of | 4/16/2010 |
NEWPORT CORPORATION | $595,933 |
Basic Energy Sciences--Nanoscale Science Research Centers (Project code 2005040) Work Authorization Number KC/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of: pr
This spending item is part of a $4,448,000 allocation.
See details
|
Office of Science | 6/25/2009 |
BETTER PLACE, INC. | $582,000 |
State Energy Program Hawaii's primary energy goal is to reduce the State's high dependence on oil while providing adequate and secure energy supplies at reasonable cost. The objective of the Hawaii Clean Energy Initiative is to obtain 70 percent of Hawaii's energy from energ
This spending item is part of a $25,930,000 allocation.
See details
|
Energy, Department of | 4/21/2009 |
Santa Clara County of | $553,438 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
CUPERTINO, CITY OF (INC) | $526,200 | Energy Efficiency and Conservation Block Grant Program (EECBG) Energy Efficiency and Conservation Block Grant for Residential and Municipal Water Conservation and Energy Efficiency Audits and Retrofits. As of September 31st, 100% of the Acterra program has been complete (though will continue to be o offered to residen... Show more | Energy, Department of | 8/14/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $501,434 |
Conservation Research and Development The proposed project will develop advanced PHEV technologies, and demonstrate and evaluate PHEVs across a wide range of geographic, climatic and operating environments. Results from the study will enable Chrysler to gain a better understanding of customer
This spending item is part of a $48,000,000 allocation.
See details
|
Energy, Department of | 3/31/2010 |
LEOTEK ELECTRONICS USA CORP | $488,889 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The City of Omaha will develop Energy EfficiencyConservation Strategy(EECS) to guide expenditure of Energy Effic Conserv Block Grant.EECS outlines City of Omaha energy efficient projects that will decrease the city's energy consumption & & stimulate economy... Show more
This spending item is part of a $4,331,500 allocation.
See details
|
Energy, Department of | 7/27/2009 |
ENVIRONMENTAL SYSTEMS INC. | $481,310 |
Energy Efficiency and Conservation Block Grant Program (EECBG) To perform Energy Efficiency and Conservation Strategy,Facility Conservation Plan, Chiller Retrofit, Parking lot lighting retrofit and Grant Administration.
This spending item is part of a $662,400 allocation.
See details
|
Energy, Department of | 3/23/2010 |
COHERENT, INC. | $440,000 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
Varian, Inc. | $375,325 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $372,940 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
GORDON-PRILL, INC. | $356,400 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
Varian, Inc. | $344,700 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
Varian, Inc. | $329,679 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
COHERENT, INC. | $319,940 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
BROCADE COMMUNICATIONS SYSTEMS, INC. | $311,755 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
BROCADE COMMUNICATIONS SYSTEMS, INC. | $311,755 |
The award funded the purchase and testing of cloud computing hardware and software to determine the applicability of this model to scientific computing. Lawrence Berkeley National Laboratory conducted the research in conjunction with Argonne National Labo
This spending item is part of a $16,384,000 allocation.
See details
|
Energy, Department of | 8/24/2009 |
STANGENES INDUSTRIES, INC. | $304,800 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
SAN JOSE, CITY OF | $299,983 | Electricity Delivery and Energy Reliability, Research, Development and Analysis The San Jose Local Energy Assurance Planning initiative will focus on building regional energy assurance capability to allow San Jose to better coordinate and communicate state-wide and with regional entities, on energy s security, reliability, and emergenc... Show more | Energy, Department of | 5/01/2010 |
TRIGEM ENTERPRISES, INC. | $299,320 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $295,777 | Geologic Sequestration Training and Research Grant Program The proposal is directly aimed at two focal areas of R&D as listed in this FOA: (a) geologic carbon storage and (b) monitoring, verification, and accounting (MVA) of carbon dioxide. It also implicitly addresses two other focal areas: ( c) c capture of car... Show more | Office of Science | 12/01/2009 |
MTH ENGINEERS, INC. | $293,918 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
CUPERTINO ELECTRIC, INC. | $292,972 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $275,826 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
CONTINUUM ELECTRO-OPTICS, INC. | $268,750 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
Varian, Inc. | $262,700 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
Varian, Inc. | $256,085 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $250,000 |
Geologic Sequestration Site Characterization Two Elk Energy Park Carbon Site Characterization Study. The objective of this Project is to conduct a characterization study of the south-central Powder River Basin for CO2 sequestration. The Project is the initial geologic characterization required to cc... Show more
This spending item is part of a $4,949,962 allocation.
See details
|
Energy, Department of | 12/08/2009 |
EAST PALO ALTO, CITY OF | $247,231 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
EAST PALO ALTO, CITY OF | $247,231 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
DIONEX CORPORATION | $242,567 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PERKINELMER, INC. | $240,914 |
Basic Energy Sciences--Light Source Improvements (Project code 2005045), Work Authorization Number KC/CH12/9/ARRA-3 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of: Providing
This spending item is part of a $7,900,000 allocation.
See details
|
Office of Science | 7/13/2009 |
COHERENT, INC. | $235,000 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $233,058 |
Industrial Carbon Capture and Storage (CCS) Application Membrane Technology and Research (MTR) and partners will demonstrate a membrane process to separate carbon dioxide (CO2) from industrial- and utility-scale processes including power plant boilers and refinery operations. MTR will design, constrtruct and te... Show more
This spending item is part of a $15,000,000 allocation.
See details
|
Energy, Department of | 9/17/2010 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $233,058 |
Industrial Carbon Capture and Storage (CCS) Application Membrane Technology and Research (MTR) and partners will demonstrate a membrane process to separate carbon dioxide (CO2) from industrial- and utility-scale processes including power plant boilers and refinery operations. MTR will design, constrtruct and te... Show more
This spending item is part of a $15,000,000 allocation.
See details
|
Energy, Department of | 9/17/2010 |
Varian, Inc. | $231,669 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
PERKINELMER, INC. | $229,014 |
The Recovery Act funds received by Brookhaven National Laboratory for the Light Source facility will be used to replace outdated equipment with state of the art components. Specifically, funds are provided as follows: $2M - Transmission X-Ray Microscope
This spending item is part of a $3,000,000 allocation.
See details
|
Energy, Department of | 7/21/2009 |
Cooligy, Inc. | $227,500 |
Conservation Research and Development The objective of this proposed work is to design and develop a prototype very high-density compute platform with 100% liquid cooling using commodity components and high volume manufacturing techniques. The system will be powerful enough for HPC applicatio
This spending item is part of a $2,843,985 allocation.
See details
|
Energy, Department of | 1/31/2010 |
ARNOLD INDUSTRIES, INC. | $221,742 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $215,536 |
Conservation Research and Development Implement a VRF heat pump and heat recovery computer model in EnergyPlus, perform lab and field testing for 2 VRF AC systems, and perform computer simulations for model verification.
This spending item is part of a $552,338 allocation.
See details
|
Energy, Department of | 6/23/2010 |
BROCADE COMMUNICATIONS SYSTEMS, INC. | $214,293 |
Advanced Scientific Computing Research--Magellan Distributed Computing and Data Initiative (Project code 2005080) Work Authorization Number KJ/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2
This spending item is part of a $16,384,000 allocation.
See details
|
Office of Science | 8/27/2009 |
LCG CONSULTING | $209,100 |
Renewable Energy Research and Development The objective of this project is to determine the benefits and costs of balancing area collaboration between the Southwest Power Pool (SPP) region with very large and undeveloped wind resources and Southeastern Electric Reliability Council (SERC) with a v
This spending item is part of a $399,135 allocation.
See details
|
Energy, Department of | 11/25/2009 |
GILROY, CITY OF | $207,000 | Energy Efficiency and Conservation Block Grant Program (EECBG) TRAFFIC SIGNAL SYNCHRONIZATION AND DEVELOPMENT OF A CLIMATE ACTION PLAN | Energy, Department of | 9/14/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $200,000 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Entergy Services Inc PMU Project
This spending item is part of a $4,611,201 allocation.
See details
|
Energy, Department of | 4/26/2010 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $198,044 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
COHERENT, INC. | $191,000 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
CUPERTINO ELECTRIC, INC. | $188,391 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
EAST PALO ALTO, CITY OF | $180,214 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
SYMYX SOLUTIONS, INC. | $179,610 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
Super Micro Computer, Inc. | $179,597 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
CONTRACT OFFICE GROUP, INC. | $173,267 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
NEWPORT CORPORATION | $173,060 |
Nuclear Physics -- Nuclear Science Workforce (Project code 2005270) Work Authorization Number KB/CH12/9/ARRA-3 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of research effort u
This spending item is part of a $4,260,000 allocation.
See details
|
Office of Science | 8/28/2009 |
ANALATOM INC | $172,000 | Renewable Energy Research and Development The aim of the proposed effort is to demonstrate AnalatomG??s Structural Health Monitoring (SHM) Artificial Intelligence (AI) software to detect and identify anomalous or abnormal behaviors in wind turbine system and component operation that may ultimatel | Energy, Department of | 12/03/2009 |
ANALATOM INC | $172,000 | Renewable Energy Research and Development The aim of the proposed effort is to demonstrate Analatom?s Structural Health Monitoring (SHM) Artificial Intelligence (AI) software to detect and identify anomalous or abnormal behaviors in wind turbine system and component operation that may ultimately | Energy, Department of | 12/03/2009 |
ZELOS CONSULTING, LLC | $169,050 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
City of Saratoga | $168,675 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
ACTERRA: ACTION FOR A SUSTAINABLE EARTH | $166,746 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
CAMPBELL, CITY OF | $163,700 | Energy Efficiency and Conservation Block Grant Program (EECBG) EECBG RETROFIT | Energy, Department of | 1/20/2010 |
TRIGEM ENTERPRISES, INC. | $162,800 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
LOS GATOS, TOWN OF | $162,712 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of this program is to reduce fossil fuel emissions, reduce total energy use of the eligible entities and improve energy efficiency in the building sector, the transportation sector, and other appropriate sectors, along with crcreating jobs.... Show more
This spending item is part of a $49,603,400 allocation.
See details
|
Energy, Department of | 9/14/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $161,563 |
This is a National Energy Technology Laboratory (NETL) Inter-Entity Work Order to provide technical support for development of an integrated Energy-Water Decision Support System (DSS), pursue the formulation and development of the Energy-Water DSS through
This spending item is part of a $2,622,000 allocation.
See details
|
Energy, Department of | 6/29/2010 |
STANGENES INDUSTRIES, INC. | $160,400 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $158,297 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
MORGAN HILL, CITY OF | $157,100 | Energy Efficiency and Conservation Block Grant Program (EECBG) Light Emitting Diode Conversion Project | Energy, Department of | 9/17/2009 |
RFI ENTERPRISES, INC. | $153,937 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
ROSENDIN ELECTRIC, INC. | $152,460 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
SOLAR RED, INC. | $150,000 | Renewable Energy Research and Development For the proposed project Solar Red, in partnership with Abound Solar, a leading innovator of CdTe PV modules, will address the greatest barriers to massive adoption of residential and small commercial rooftop solar & scalability of installation and total | Energy, Department of | 8/20/2009 |
ASA COMPUTERS, INC. | $149,990 |
Advanced Scientific Computing Research--Magellan Distributed Computing and Data Initiative (Project code 2005080) Work Authorization Number KJ/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2
This spending item is part of a $16,384,000 allocation.
See details
|
Office of Science | 8/27/2009 |
CHELIX TECHNOLOGIES CORP. | $149,216 | Office of Science Financial Assistance Program DOE SBIR Phase I project. Development of novel pigments for cool-roofs applications based on NIR reflective liquid crystal polymer film technology | Office of Science | 2/08/2010 |
Qualtech Mechanical, Inc. | $145,393 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
BAY SYSTEMS CONSULTING, INC. | $144,060 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
Super Micro Computer, Inc. | $143,538 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
DIONEX CORPORATION | $143,442 |
Advanced Biofuels User Facility Project. The project's objective is to build an advanced biofuels process development facility that will help expedite the commercialization of next generation biofuels by providing industry-scale testbeds for innovative te
This spending item is part of a $17,700,000 allocation.
See details
|
Energy, Department of | 1/31/2010 |
NEWPORT CORPORATION | $143,000 |
Basic Energy Sciences - Nanoscale Science Research Centers - (Project Code 2005040) Capital Equipment funds are provided to update, upgrade, or expand capabilities of the Center for Integrated Nanotechnologies (CINT) Facility to conduct leading-edge scien
This spending item is part of a $3,273,818 allocation.
See details
|
Energy, Department of | 7/02/2009 |
CONTRACT OFFICE GROUP, INC. | $138,412 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
TRIGEM ENTERPRISES, INC. | $127,800 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
LELAND STANFORD JUNIOR UNIVERSITY, THE | $125,000 | Office of Science Financial Assistance Program This project is to renew and improve technical infrastructure so that U.S. universities can remain competitive by developing future detector and accelerator technologies, and provide world-class training for the next generation of experimental scientiststs.... Show more | Office of Science | 7/16/2010 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $124,160 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
AGILENT TECHNOLOGIES, INC. | $123,944 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
COMMUNICATIONS & POWER INDUSTRIES LLC | $115,000 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
APOLLO INFORMATION SYSTEMS CORP. | $107,958 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
VALIN CORPORATION | $103,216 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
BAY SYSTEMS CONSULTING, INC. | $101,999 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
Global Energy Market Solutions Inc | $100,000 |
Renewable Energy Research and Development Illinois Institute of Technology (IIT), with an ABET accredited engineering program, will lead an extensive effort in forming a world-class wind energy consortium of multiple universities (domestic and international) and multiple industry participants (al
This spending item is part of a $7,900,000 allocation.
See details
|
Energy, Department of | 1/15/2010 |
ASA COMPUTERS, INC. | $99,994 |
Advanced Scientific Computing Research--Magellan Distributed Computing and Data Initiative (Project code 2005080) Work Authorization Number KJ/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2
This spending item is part of a $16,384,000 allocation.
See details
|
Office of Science | 8/27/2009 |
HAIMSON RESEARCH CORPORATION | $99,959 | Office of Science Financial Assistance Program This award is to support the high power testing and evaluation of a new type of high power microwave tube (Choppertron) recently designed and fabricated on DOE SBIR grant ER84468 and presently installed in the 17 GHz test facility at the MIT Plasma Scienenc... Show more | Office of Science | 6/15/2010 |
INFINERA CORPORATION | $97,765 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
Shin-Etsu Magnetics Inc. | $97,424 |
Basic Energy Sciences--Light Source Improvements (Project code 2005045), Work Authorization Number KC/CH12/9/ARRA-3 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of: Providing
This spending item is part of a $7,900,000 allocation.
See details
|
Office of Science | 7/13/2009 |
STANGENES INDUSTRIES, INC. | $96,600 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $95,780 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
COMMUNICATIONS & POWER INDUSTRIES LLC | $95,235 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
Asicsoft, Inc. | $95,000 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
NATIONAL SEMICONDUCTOR CORPORATION | $94,944 |
Advanced Research and Projects Agency Energy Financial Assistance Program The goal of this project is to greatly reduce the size and cost, and increase the efficiency of laptop power supplies, and other chargers and components used to power consumer electronics. It will do so through the development t of low loss, high magnetic f... Show more
This spending item is part of a $1,016,017 allocation.
See details
|
Energy, Department of | 8/19/2010 |
Asicsoft, Inc. | $93,000 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
Asicsoft, Inc. | $93,000 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
BAY SYSTEMS CONSULTING, INC. | $92,809 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
TRIGEM ENTERPRISES, INC. | $92,229 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
CALMAR OPTCOM, INC. | $92,000 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
MILPITAS, CITY OF | $91,090 |
Energy Efficiency and Conservation Block Grant Program (EECBG) To perform Energy Efficiency and Conservation Strategy,Facility Conservation Plan, Chiller Retrofit, Parking lot lighting retrofit and Grant Administration.
This spending item is part of a $662,400 allocation.
See details
|
Energy, Department of | 3/23/2010 |
Biggs Cardosa Associates, Inc. | $90,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) To perform Energy Efficiency and Conservation Strategy,Facility Conservation Plan, Chiller Retrofit, Parking lot lighting retrofit and Grant Administration.
This spending item is part of a $662,400 allocation.
See details
|
Energy, Department of | 3/23/2010 |
VAISALA INC. | $89,100 |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
DIONEX CORPORATION | $87,225 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
CONTRACT OFFICE GROUP, INC. | $84,389 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
C. L. HANN INDUSTRIES, INC. | $80,863 |
Title: Advanced Plasma Acceleration Facility MIE (FACET) Purpose: To support the Facilities for Accelerator Science and Experimental Test Beams (FACET) at SLAC. Funds will be spent on the conceptual design, refurbishment, procurement and installation of
This spending item is part of a $14,500,000 allocation.
See details
|
Energy, Department of | 5/26/2009 |
Asicsoft, Inc. | $80,000 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
ROSENDIN ELECTRIC, INC. | $77,200 |
Title: Light Source Improvements at SSRL Purpose: Equipment funds to provide the following two improvements. Scope 1 Liquid Nitrogen Monochromator Operational Reliability Upgrade A new, approximately 13,000 gallon liquid nitrogen tank, including nec
This spending item is part of a $1,800,000 allocation.
See details
|
Energy, Department of | 7/20/2009 |
PALO ALTO RESEARCH CENTER INCORPORATED | $75,000 |
Renewable Energy Research and Development Develop new metallization technology for silicon solar cells to improve efficiency
This spending item is part of a $150,000 allocation.
See details
|
Energy, Department of | 8/01/2009 |
COHERENT, INC. | $72,818 |
This project will construct and install a new insertion device, an Elliptically Polarizing Undulator (EPU), in Advanced Light Source straight sector 6 to provide a new x-ray source for the femtosecond soft x-ray beamline 6.0.2. This EPU is identified as o
This spending item is part of a $2,000,000 allocation.
See details
|
Energy, Department of | 7/07/2009 |
ACKERMAN-PRACTICON, INC. | $71,000 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
COMMUNICATIONS & POWER INDUSTRIES LLC | $67,025 |
WAS Number: KA/CH14/9/ARRA-5 Superconducting Radio Frequency (SRF) Infrastructure R&D - The Recovery Act funding will accelerate the development of technical infrastructure required to prototype and test superconducting radiofrequency (SRF) accelerating c
This spending item is part of a $52,672,000 allocation.
See details
|
Office of Science | 8/13/2009 |
Shin-Etsu Magnetics Inc. | $66,690 |
Basic Energy Sciences--Light Source Improvements (Project code 2005045), Work Authorization Number KC/CH12/9/ARRA-3 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of: Providing
This spending item is part of a $7,900,000 allocation.
See details
|
Office of Science | 7/13/2009 |
SALAS O'BRIEN ENGINEERS, INC. | $66,125 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Create projects/programs that meet the intent and purpose of the EECBG.
This spending item is part of a $3,574,300 allocation.
See details
|
Energy, Department of | 11/04/2009 |
CLARK, RICHARDSON AND BISKUP CONSULTING ENGINEERS, INC. | $60,000 |
Advanced Biofuels User Facility Project. The project's objective is to build an advanced biofuels process development facility that will help expedite the commercialization of next generation biofuels by providing industry-scale testbeds for innovative te
This spending item is part of a $17,700,000 allocation.
See details
|
Energy, Department of | 1/31/2010 |
DIONEX CORPORATION | $59,856 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
NEWPORT CORPORATION | $54,031 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
RAE SYSTEMS INC. | $53,852 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Valentin, Ivanov | $50,400 |
High Energy Physics--Advanced Technology R&D Augmentation (Project code 2005170) Work Authorization Number KA/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of supp
This spending item is part of a $8,420,000 allocation.
See details
|
Office of Science | 8/07/2009 |
COMTEL SYSTEMS TECHNOLOGY, INC | $49,995 |
Upon completion of the BELLA project, an experimental facility for advancing the development of laser plasma acceleration will be available with unprecedented capabilities. The research and development that will be made possible with the proposed BELLA sy
This spending item is part of a $19,218,000 allocation.
See details
|
Energy, Department of | 5/19/2009 |
INFINERA CORPORATION | $47,300 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
NEWPORT CORPORATION | $47,127 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
BAY SYSTEMS CONSULTING, INC. | $46,753 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
CONSOLIDATED HINGE & MANUFACTURED PRODUCTS (INC) | $46,436 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
Wolfe Engineering, Inc. | $46,050 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
DIONEX CORPORATION | $45,453 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
NEWPORT CORPORATION | $45,374 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
VALIN CORPORATION | $45,068 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
INFINERA CORPORATION | $44,800 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
INFINERA CORPORATION | $44,000 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $42,991 |
Advanced Research and Projects Agency Energy Financial Assistance Program Robotic instrumentation tools and computational algorithms will be used to accelerate the development of metal organic framework (MOF) materials to capture CO2. High throughput gas sorption instrumentation will be developed anand installed at Lawrence Berk... Show more
This spending item is part of a $1,238,411 allocation.
See details
|
Energy, Department of | 7/20/2010 |
TRIGEM ENTERPRISES, INC. | $42,945 |
1) Develop a novel model and high performance code for analysis of coupled Thermal-Hydrological-Mechanical-Chemical (THMC) processes in Enhanced Geothermal Systems (EGS). 2) Determine quantitatively the permeability of sheared fractures and its long term
This spending item is part of a $1,230,430 allocation.
See details
|
Energy, Department of | 9/22/2009 |
PEARSON ELECTRONICS, INC. | $42,000 |
High Energy Density Laboratory Plasma, NDCX II
This spending item is part of a $11,000,000 allocation.
See details
|
Energy, Department of | 7/07/2009 |
Wolfe Engineering, Inc. | $41,752 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
TRIGEM ENTERPRISES, INC. | $41,480 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
MODULAR PROCESS TECHNOLOGY CORPORATION | $39,880 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
STANFORD RESEARCH SYSTEMS INC. | $38,450 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
BUCKLES-SMITH ELECTRIC COMPANY | $38,050 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
TRIGEM ENTERPRISES, INC. | $37,960 |
The Advanced Networking Initiative (ANI) project scope is to accelerate by several years the commercialization of 100 Gigabit per second (Gbps) networking technologies by deploying a demonstration national prototype network. This offers the scientists to
This spending item is part of a $62,042,040 allocation.
See details
|
Energy, Department of | 7/30/2009 |
RAE SYSTEMS INC. | $37,812 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARROW ELECTRONICS, INC. | $34,982 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
TRIGEM ENTERPRISES, INC. | $33,370 |
Advanced Scientific Computing Research--Magellan Distributed Computing and Data Initiative (Project code 2005080) Work Authorization Number KJ/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2
This spending item is part of a $16,384,000 allocation.
See details
|
Office of Science | 8/27/2009 |
ISOLATION PRODUCTS INC | $32,025 |
High Energy Density Laboratory Plasma, NDCX II
This spending item is part of a $11,000,000 allocation.
See details
|
Energy, Department of | 7/07/2009 |
GORDON-PRILL, INC. | $31,936 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
ALLIED TELESIS, INC | $31,454 |
Upon completion of the BELLA project, an experimental facility for advancing the development of laser plasma acceleration will be available with unprecedented capabilities. The research and development that will be made possible with the proposed BELLA sy
This spending item is part of a $19,218,000 allocation.
See details
|
Energy, Department of | 5/19/2009 |
TRIGEM ENTERPRISES, INC. | $31,200 |
The award funded the purchase and testing of cloud computing hardware and software to determine the applicability of this model to scientific computing. Lawrence Berkeley National Laboratory conducted the research in conjunction with Argonne National Labo
This spending item is part of a $16,384,000 allocation.
See details
|
Energy, Department of | 8/24/2009 |
COHERENT, INC. | $30,002 |
High Energy Physics--Advanced Technology R&D Augmentation (Project code 2005170) Work Authorization Number KA/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds for the purpose of supp
This spending item is part of a $8,420,000 allocation.
See details
|
Office of Science | 8/07/2009 |
CONSOLIDATED HINGE & MANUFACTURED PRODUCTS (INC) | $29,134 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
Ma-CHI Chen Corporation | $29,000 |
Title: GPP Project 1, Electrical Substation Modernization Purpose: Modernize and seismically stabilize two electrical substations critical to laboratory operation and modify the Motor Control Center (MCC) configuration in Building 23 to allow separation
This spending item is part of a $21,800,000 allocation.
See details
|
Energy, Department of | 4/17/2009 |
INTEGRATED ARCHIVE SYSTEMS, INC. | $28,729 |
This funding will be used to support efforts at the Joint Genome Institute (JGI) to provide necessary IT infrastructure to support rapidly expanding sequencing analysis requirements for all JGI Science programs, procurement of a next generation sequencing
This spending item is part of a $13,122,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
Wolfe Engineering, Inc. | $28,206 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
RVISION, INC. | $27,835 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
TRIGEM ENTERPRISES, INC. | $27,282 |
ARRA equip funds in amount of $5,908,000 are provided under KC020401C EQU to update, upgrade, or expand capabilities of the MF to conduct leading-edge science and serve users.
This spending item is part of a $5,908,000 allocation.
See details
|
Energy, Department of | 6/29/2009 |
ANRITSU COMPANY | $27,150 |
Perform the research proposed for Early Career Research Program. Federal program managers will verify the research performance of the contractor through annual research progress reports, phone calls, site visits, and attendance at topical conferences.
This spending item is part of a $2,500,000 allocation.
See details
|
Office of Science | 3/25/2010 |
NEWPORT CORPORATION | $26,436 |
Title: High Energy Density Laboratory Plasma, Matter in Extreme Conditions (MEC) Instrument Project The Matter in Extreme Conditions Instrument (MECI) will observe matter at temperatures exceeding 10,000 KelvinG??nearly twice the temperature at the surfa
This spending item is part of a $19,973,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
ANRITSU COMPANY | $24,250 |
Perform the research proposed for Early Career Research Program. Federal program managers will verify the research performance of the contractor through annual research progress reports, phone calls, site visits, and attendance at topical conferences.
This spending item is part of a $2,500,000 allocation.
See details
|
Office of Science | 3/25/2010 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $0 |
Advanced Research and Projects Agency Energy Financial Assistance Program There is potential for electrochromic (EC) windows to dramatically reduce building energy use through active control of light and solar heat transmission. U.S. buildings today accounts for 40% of all primary energy used and 38%8% of carbon dioxide emission ... Show more
This spending item is part of a $4,886,155 allocation.
See details
|
Energy, Department of | 12/18/2009 |