Arapahoe County, Colo., funds by Commerce, Department of

Listing $5,323,574.35 in stimulus funds from Commerce, Department of for Arapahoe

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
RAILROAD SPECIALTIES, INC. $1,740,179 Economic Adjustment Assistance The City of Levelland along with the Levelland Economic Development Corporation are developing a 300 acre lot so that future tenants can have access to rail, utilities, and roads. This will be a rail served industrial park which will provide transportati
This spending item is part of a $3,300,000 allocation. See details
Economic Development Administration 6/11/2009
MERRICK & COMPANY $1,602,261 The scope of this project is to Fabricate, Test, and Install an Upgrade of the Plumbing System of the Thermal Shield at the NIST/Center for Neutron Research (NCNR). The general objectives of the project are: Eliminate leakage of the NBSR thermal shield
This spending item is part of a $4,663,448 allocation. See details
National Institute of Standards and Technology 9/29/2010
MERRICK & COMPANY $671,031 Design & fabrication of a prototype shim rod. National Institute of Standards and Technology 9/08/2009
MERRICK & COMPANY $541,151 Produce design documentation to support fabrication and testing of the upgrade for the NIST thermal shield cooling system. Deliverables include: drawings, sepcifications, calculations, data sheets, and reports. National Institute of Standards and Technology 7/10/2009
L SQUARED LLC $469,060 Completed aggregation of NWave routers at the Sandpoint facility, Seattle Washington.Performed network engineering on the metro network that is complimentary to NWave. Performed engineering and planning for aggregation of the Hawaii NWave routers. Coordi
This spending item is part of a $2,323,691 allocation. See details
National Oceanic and Atmospheric Administration 12/28/2009
MERRICK & COMPANY $299,892 Manufacture a First Article set of four (4) Shim Safety Rods.
This spending item is part of a $614,472 allocation. See details
National Institute of Standards and Technology 9/23/2010