Jefferson County, Colo., funds by General Services Administration
Listing $268,940,120.57 in stimulus funds from General Services Administration for Jefferson
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
HITT CONTRACTING, INC. | $71,079,313 | The Department of States Bureau of Information Resources Management received funding through the American Recovery and Reinvestment Act to locate a second data center in the Western part of the United States of America to provide for a modern and redundan | Public Buildings Service | 2/17/2010 |
HITT CONTRACTING, INC. | $64,460,664 | Design-Build services and New construction for the Recovery Tier III Data Center in Lakewood, Colorado | Public Buildings Service | 3/02/2010 |
E LIGHT CENTERRE A JOINT VENTURE, LLC | $20,973,495 | Design build project at the Denver Federal Center. This project includes two large fields of Photovoltaic system ground arrays as well as several carports with roof mounted arrays. These panels will prevent the emission of thousands of pounds of carbon di | Public Buildings Service | 3/15/2010 |
CENTERRE E LIGHT A JOINT VENTURE | $17,754,057 | Design build project at the Denver Federal Center. This project includes roof replacement and design and install of building integrated Photo Voltaic panels on buildings 20, 56 and 810. These panels prevent the emission of thousands of pounds of C02 per | Public Buildings Service | 12/15/2009 |
PCL CONSTRUCTION SERVICES, INC | $14,768,392 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
FIORE & SONS, INC. | $8,560,585 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
HUDSPETH & ASSOCIATES, INC | $8,418,763 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
ROCKY MOUNTAIN EXCAVATING, INC. | $6,639,949 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
NEW WEST PAVING INC | $4,989,202 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
JACOBS PROJECT MANAGEMENT CO. | $4,045,539 |
The program provides for capital construction projects to replace facilities at a number of the 43 Bureau of Customs and Border Protection-owned Land Ports of Entry, and Renovation and Alteration projects at the remaining Bureau of Customs and Border Prot
This spending item is part of a $4,284,999 allocation.
See details
|
Public Buildings Service | 4/16/2009 |
CH2M HILL, INC. | $4,010,925 |
The Denver Federal Center (DFC)in Lakewood, Colorado has antiquated utilities in need of repair or rehabilitation. CH2M HILL has been working with the General Services Administration (GSA) over the past five years to design a new water distribution system
This spending item is part of a $4,141,844 allocation.
See details
|
Public Buildings Service | 5/21/2009 |
GERALD H. PHIPPS, INC. | $3,552,127 | Design-Build contract for the Recommissioning of Buildings 20 and 95 located on the Denver Federal Center, Lakewood, Colorado. | Public Buildings Service | 12/29/2009 |
NMIS-MEP DESIGN GROUP, LLC | $2,973,371 | Upgrade Chiller, Boilers, and High Efficiency Pumps & Motors. | Public Buildings Service | 3/24/2010 |
C & L WATER SOLUTIONS, INC. | $2,702,476 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
DYNALECTRIC COMPANY | $2,543,100 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
JBLANCO ENTERPRISES, INC. | $2,504,189 | Roof Replacement on Buildings 1A, 40, and 50 located at W.6th Ave & Kipling St. Denver, CO 80226. | Public Buildings Service | 3/10/2010 |
INTERMOUNTAIN ELECTRIC, INC | $2,439,909 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
R M H GROUP, INC., THE | $2,393,870 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
JACOBS PROJECT MANAGEMENT CO. | $2,221,777 |
CMa Services for Department of State Facility in Denver Colorado Preconstruction, Construction and Closeout Phase Services in Denver Federal Center. 100,000 sf, $60 million facility will have expansion capabilities for future. Jacobs services include Desi
This spending item is part of a $2,725,558 allocation.
See details
|
Public Buildings Service | 2/09/2010 |
NMIS-MEP DESIGN GROUP, LLC | $1,651,608 | Upgrade Chillers, Boilers, and High Efficiency Pumps & Motors. | Public Buildings Service | 3/24/2010 |
JOPPA MAINTENANCE CO., INC. | $1,647,013 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
SIERRA DETENTION SYSTEMS INC. | $1,292,833 |
Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation.
See details
|
Public Buildings Service | 3/18/2010 |
PREVENTIVE MAINTENANCE SERVICES COMPANY | $1,206,779 | Apply Cool Roof Coating to existing roof membranes for Buildings 41 and 25 located on the Denver Federal Center, Lakewood Colorado | Public Buildings Service | 3/20/2010 |
NMIS-MEP DESIGN GROUP, LLC | $1,134,449 | Upgrade Chillers, Boilers, and High Efficiency Pumps & Motors. | Public Buildings Service | 3/24/2010 |
KIMMEL MECHANICAL, INCORPORATED | $1,023,090 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
CARRIER CORPORATION | $849,956 |
Replace chillers and pumps in bldgs 15, 21, 56 and 85 on the Denver Federal Center, Denver Colorado
This spending item is part of a $1,259,877 allocation.
See details
|
Public Buildings Service | 9/09/2009 |
B & M ROOFING OF COLORADO, INC. | $775,769 |
Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Denver, CO. End Outcome:Rip off and replace roof on several GSA buildings to make buildings more engery efficient and in turn save money on energy costs.
This spending item is part of a $1,325,363 allocation.
See details
|
Public Buildings Service | 2/10/2010 |
Norfolk Street, LLC | $697,607 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
MARTIN/MARTIN, INC. | $629,984 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
UNITED MATERIALS; L.L.C. | $574,662 | Reroof North flat roof area of DFC Bldg 810 with SBS CR roof membrane and high insulation value. This results in a cool roof with high emissivity and high Rvalue. | Public Buildings Service | 3/09/2010 |
FACILITY ENGINEERING ASSOCIATES, P.C. | $551,250 |
This project is the second phase of the water intrusion repairs for the Sam M. Gibbons United States Courthouse, which includes the following activities. On the west elevation, floors 1-5, we will be repairing the curtainwall windows, curtainwall sills,
This spending item is part of a $13,596,465 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
NTVI ENTERPRISES, LLC | $480,235 |
Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Denver, CO. End Outcome:Rip off and replace roof on several GSA buildings to make buildings more engery efficient and in turn save money on energy costs.
This spending item is part of a $1,325,363 allocation.
See details
|
Public Buildings Service | 2/10/2010 |
Straight Edge | $455,750 |
RECOVERY - CONSTUCTION MANAGER (CM) SERVICES FOR A PRESSURE VACUUM (PV) SYSTEMS, DENVER FEDERAL CENTER, LAKEWOOD, CO
This spending item is part of a $583,382 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
INTERMOUNTAIN ELECTRIC, INC | $446,651 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
LARNER, ELIZABETH | $434,000 | GSA Federal Courthouse Art Commission Denver Co., using the ARRA Funds | Public Buildings Service | 9/16/2010 |
ALEUT FACILITIES SUPPORT SERVICES, LLC | $409,921 |
Replace chillers and pumps in bldgs 15, 21, 56 and 85 on the Denver Federal Center, Denver Colorado
This spending item is part of a $1,259,877 allocation.
See details
|
Public Buildings Service | 9/09/2009 |
SDC, INC. | $405,622 | Provides project management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. | Public Buildings Service | 4/01/2011 |
COLORADO SCHOOL OF MINES BUILDING CORPORATION | $379,203 | Remodel of Data Center Computer Room at the USGS building 1711 Illinois Street | General Services Administration | 6/30/2010 |
COLORADO SCHOOL OF MINES BUILDING CORPORATION | $379,203 | Remodel of Data Center Computer Room at the United States Geological Survey building 1711 Illinois Street, Golden, Colorado. | General Services Administration | 6/30/2010 |
FIORE & SONS, INC. | $367,754 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
SIEMENS INDUSTRY, INC. | $356,622 | Services performed in accordance with Performance Work Statement for the months of October 2010 and November 2010. Services are in support of the Advanced Metering Contracts located at the Denver Federal Center, Lakewood, Colorado. | Public Buildings Service | 8/31/2010 |
CIVIL TECHNOLOGY INC | $355,781 |
CMa Services for Department of State Facility in Denver Colorado Preconstruction, Construction and Closeout Phase Services in Denver Federal Center. 100,000 sf, $60 million facility will have expansion capabilities for future. Jacobs services include Desi
This spending item is part of a $2,725,558 allocation.
See details
|
Public Buildings Service | 2/09/2010 |
SIEMENS INDUSTRY, INC. | $339,422 | DEN-ASB-Advanced Metering Service Support Provide service per the annual Service Contract agreement ending 9/29/2011 | Public Buildings Service | 8/31/2010 |
Central Fire Protection Contractors, Inc | $321,914 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
JPE, INCORPORATED | $248,607 | US Marshal Build-Out, Bldg 67 Furnish all materials, labor, equipment and superviison necessary to build-out Room 112 of B 67. | Public Buildings Service | 6/29/2010 |
I. H. I. | $239,517 |
TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING.
This spending item is part of a $8,367,060 allocation.
See details
|
Public Buildings Service | 12/28/2009 |
ZIMKOR LLC | $220,599 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
HAWORTH, INC. | $214,754 | New Building construction-project is Denver Federal Center West 6th Avenue & Kipling Building 17 Department of State Office Denver, Colorado 80225 | Public Buildings Service | 8/23/2010 |
M. E. GROUP, INC. | $208,214 | Recommissioning study of Building 20 & 95 at the Denver Federal Center in Lakewood, CO. A water and energy audit and balance report will be done. A savings summary of energy conservation measures will be compiled. A table which shows current ovrerall b | Public Buildings Service | 6/17/2009 |
PCL CONSTRUCTION SERVICES, INC | $176,177 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
DATAMANUSA,LLC | $167,614 | Recovery ARRA Funded Project -The purpose of this project is to provide IT Relocation services to select Byron Rogers FOB agencies. Ship address: 1961 Stout St, Denver, CO 80294-1961 | Public Buildings Service | 7/20/2010 |
GROUND ENGINEERING CONSULTANTS, INC | $162,589 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
SDC, INC. | $152,536 | Provides Project management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. Purpose of award is to provide administrative services to GSA in Denve | Public Buildings Service | 4/15/2010 |
SDC, INC. | $152,534 | Provides project management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. Purpose of award is to provide administrative services to GSA in Denve | Public Buildings Service | 7/29/2010 |
NVE, INC | $139,576 | NVE, Inc. is to supply Construction Surveillance Technicians (CSTs) at the construction site for a Department of State Facility at the Denver Federal Center, Lakewood, Colorado. The general purpose of the CSTs is to detect unauthorized access to controlle | Public Buildings Service | 8/05/2011 |
URS GROUP, INC. | $127,632 |
RECOVERY - CONSTUCTION MANAGER (CM) SERVICES FOR A PRESSURE VACUUM (PV) SYSTEMS, DENVER FEDERAL CENTER, LAKEWOOD, CO
This spending item is part of a $583,382 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
HI COUNTRY WIRE & TELEPHONE LTD. | $127,488 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
RODRIGUEZ CONSTRUCTION ORG, L.L.C. | $124,263 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
CHILD'S PLAY OF COLORADO, LLC | $124,214 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
ROCKY MOUNTAIN EXCAVATING, INC. | $124,068 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
ENGINEERING ECONOMICS, INC. | $104,223 |
The David Skaggs Research Center is located at 325 Broadway in Boulder, Colorado. It is 415,000 sf. And completed in 1999. The building's exterior construction has a concrete superstructure, applied precast concrete and native sandstone with a nominal R
This spending item is part of a $114,127 allocation.
See details
|
Public Buildings Service | 6/09/2009 |
Black Roofing Inc | $101,091 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
BCER ENGINEERING, INC | $93,040 |
Construction Manager as Agent Services for the Design and construction of the U.S. Federal Courthouse Billings, Montana
This spending item is part of a $4,703,183 allocation.
See details
|
Public Buildings Service | 12/17/2009 |
Heggem-Lundquist Paint Company | $91,428 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
NEDERLAND REFRIGERATION, AIR CONDITIONING, AND HEATING CORPORATION | $90,000 |
CMa Services for Department of State Facility in Denver Colorado Preconstruction, Construction and Closeout Phase Services in Denver Federal Center. 100,000 sf, $60 million facility will have expansion capabilities for future. Jacobs services include Desi
This spending item is part of a $2,725,558 allocation.
See details
|
Public Buildings Service | 2/09/2010 |
R M H GROUP, INC., THE | $73,786 |
The purpose of this project is to implement Energy Conservation Measures at the David Skaggs Research Center in Boulder, Colorado as identified in the Recommissioning report that was created by Andrews & Anderson Architects and Enabled Energy Incorporated
This spending item is part of a $360,912 allocation.
See details
|
Public Buildings Service | 12/07/2009 |
SIEMENS INDUSTRY, INC. | $67,269 | CLIN 0003 only:Contractor shall provide the labor, equipment, materials and supervision to install and monitor an advanced metering system and metering management system for locations in General Services Administration Region 8 (Rocky Mountain Region), to | Public Buildings Service | 9/22/2010 |
JOHNSON CONTROLS, INC. | $66,535 |
The Byron Rogers Federal Building is undergoing a major renovation. The regional Social Security Administration was a tenant in the building and had to be relocated while this work was being completed. They have signed a 3-year lease at 1001-17th Street
This spending item is part of a $3,520,152 allocation.
See details
|
Public Buildings Service | 3/13/2010 |
HITT CONTRACTING, INC. | $65,000 | Design Fees for the advanced metering of utility usage for a building on the Denver Federal Center in Denver Colorado. | Public Buildings Service | 9/24/2010 |
JOPPA MAINTENANCE CO., INC. | $63,180 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
OUTBACK OFFICE, INC. | $61,353 | Labor to move 120 employee's for the IRS in Denver, Colorado | Public Buildings Service | 9/21/2010 |
SDC, INC. | $57,086 | Provides Project Management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. Purpose of award is to provide administrative services to GSA in Denv | Public Buildings Service | 12/17/2010 |
DESIGN EDGE PC | $56,584 |
The award is for the Architectural design of a 7620 square foot maintenance building for the US Army Reserve and associated parking and site work, at the Denver Federal Center in Lakewood Colorado. Design Edge PC will provide construction documentation an
This spending item is part of a $105,684 allocation.
See details
|
Public Buildings Service | 11/20/2009 |
PIE FORENSIC CONSULTANTS, INC. | $56,300 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
COLORADO SCHOOL OF MINES BUILDING CORPORATION | $51,538 | Architectural and Design Services for USGS computer data center at USGS Building 1711 Illinois Street | General Services Administration | 10/26/2009 |
PUBLIC SERVICE COMPANY OF COLORADO | $49,912 | Relocate main gas service to the Denver Federal Center | Public Buildings Service | 2/02/2010 |
SDC, INC. | $49,842 | Provides Project Management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. Purpose of award is to provide administrative services to GSA in Denve | Public Buildings Service | 7/28/2011 |
GEOSYNTEC CONSULTANTS INC | $49,014 | Geosyntec is providing technical assistance at the Denver Federal Center for Storm Water Management. Geosyntec is conducting technical reviews of proposed stormwater management facilities and modeling of hydrologic stormwater flows. Deliverables include t | Public Buildings Service | 10/20/2009 |
JOPPA MAINTENANCE CO., INC. | $48,269 | FURNISH ALL MATERIALS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO REMOVE EXISTING TREES ON THE NORTHEAST CORNER OF THE DFC AS DIRECTED BY THE SCOPE OF WORK | Public Buildings Service | 1/07/2010 |
SAMUEL ENGINEERING, INC. | $43,419 | Design study with a scalable range of power delivery along with a transformer design specification for the construction of a new Tier III data center facility at Denver Federal Center | Public Buildings Service | 9/10/2009 |
CEAVCO AUDIO-VISUAL COMPANY, INC. | $42,167 |
The Byron Rogers Federal Building is undergoing a major renovation. The regional Social Security Administration was a tenant in the building and had to be relocated while this work was being completed. They have signed a 3-year lease at 1001-17th Street
This spending item is part of a $3,520,152 allocation.
See details
|
Public Buildings Service | 3/13/2010 |
Colorado Window Systems Inc | $41,553 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
YEH AND ASSOCIATES, INC | $41,177 |
The Denver Federal Center (DFC)in Lakewood, Colorado has antiquated utilities in need of repair or rehabilitation. CH2M HILL has been working with the General Services Administration (GSA) over the past five years to design a new water distribution system
This spending item is part of a $4,141,844 allocation.
See details
|
Public Buildings Service | 5/21/2009 |
NEW WEST PAVING INC | $36,436 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
CSHQA A PROFESSIONAL ASSOCIATION | $36,410 |
Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Denver, CO. End Outcome:Rip off and replace roof on several GSA buildings to make buildings more engery efficient and in turn save money on energy costs.
This spending item is part of a $1,325,363 allocation.
See details
|
Public Buildings Service | 2/10/2010 |
Big Horn Plastering, Inc | $34,775 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
TERRACON CONSULTANTS, INC. | $34,292 | Preparation for Data Center Construction Project. Scope of work modified 9/25/09 to include an additional 7 borings for the relocation of the Army Reserve garage/storage building. Other services include soil sampling, piezometer installation and groundw | Public Buildings Service | 9/04/2009 |
JCOR MECHANICAL, INC. | $32,950 |
Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Denver, CO. End Outcome:Rip off and replace roof on several GSA buildings to make buildings more engery efficient and in turn save money on energy costs.
This spending item is part of a $1,325,363 allocation.
See details
|
Public Buildings Service | 2/10/2010 |
D. H. PACE COMPANY, INC. | $31,258 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
STEELOCK CORPORATION | $27,742 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
CRANE & HOIST SALES, INC. | $25,778 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
Air Right Inc | $24,940 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
HUDSPETH & ASSOCIATES, INC | $24,586 |
Provide CABI for oversight of excavtion activity. Dispose of soils and provide stormwater requirements.
This spending item is part of a $29,750 allocation.
See details
|
Public Buildings Service | 2/11/2010 |
Jefferson County Sweeping Service | $22,480 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
LU-TEK INCORPORATED | $21,983 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
ELECTRONIC DISPLAYS INC. | $18,175 | We will manufacture LED time zone displays that show times from around the world. These will be manufactured Addison, Illinois 60101. | Public Buildings Service | 8/03/2011 |
ORACLE AMERICA, INC. | $17,848 | Primavera P6 Enterprise Project Portfolio Management Software and Support | Public Buildings Service | 6/01/2010 |
CHI Companies LLC | $17,000 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
STEELOCK CORPORATION | $16,043 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
SMITH ENVIRONMENTAL AND ENGINEERING | $13,484 | DENVER FEDERAL CENTER WILDLIFE MANAGEMENT | Public Buildings Service | 2/12/2010 |
PUBLIC SERVICE COMPANY OF COLORADO | $12,706 | Installing Gas Line to serve Army Reserve facility at the Denver Federal Center, Denver Colorado. | Public Buildings Service | 11/17/2010 |
CUSTOM ENVIRONMENTAL SERVICES, INC | $12,554 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
SAMUEL ENGINEERING, INC. | $11,765 | Compile exisitng as-built drawings and site plans to display the ground areas being proposed for ground mounted PV panels. Also display the parking areas being proposed for ground mounted PV panels. Also display the parking areas of Buildings 25, 53, and | Public Buildings Service | 11/04/2009 |
PRIMEX WIRELESS, INC. | $10,457 | RELOCATION OF TRANSMITTER IN DENVER, CO. THIS IS TO MOVE TH PRIMEX TRANSMITTER FROM THE ROOF OF TH FEDERAL OFFICE BUILDING TO THE ROOF OF THE COURTHOUSE. THIS NEEDS TO TAKE PLACE TO PROTECT THIS SENSITIVE EQUIPMENT FROM DAMAGE DURING THE OFFICE BUILDING R | Public Buildings Service | 9/17/2010 |
BASSETT CONSTRUCTION SERVICES | $7,202 | Estimating and conlulting | Public Buildings Service | 9/25/2009 |
FRONT RANGE WIRELESS, INC. | $7,080 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
SAMUEL ENGINEERING, INC. | $6,415 | Coordinated effort between structural roof studies and electrical study to generate drawings for the design/build project to install new solar panels on a series of buildings at the DFC | Public Buildings Service | 8/21/2009 |
R M H GROUP, INC., THE | $6,324 |
To develop a statement of work for the repair and alteration of the Pierre Federal Office Building to replace the exisiting curtain wall system and repair basement water infiltration issues. There will be construction management services and the project
This spending item is part of a $50,304 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
SPACESAVER STORAGE SYSTEMS, INC. | $6,284 | Provide and install lockers to the GSA Denver Federal Center. | Public Buildings Service | 5/26/2011 |
GILMORE CONSTRUCTION CORPORATION | $5,736 | Location: Building 40, 2nd Fllor Men's Bathroom, Denver Federal Center, Lakewood, Colorado - Demolish and remove existing ceiling drywall and insulation on 2nd floor bathroom in Building 40. Reinstall and finish the drywall. Prime and paint affected are | Public Buildings Service | 10/08/2010 |
SCANDALIATO DESIGN GROUP INC. | $5,700 |
The award is for the Architectural design of a 7620 square foot maintenance building for the US Army Reserve and associated parking and site work, at the Denver Federal Center in Lakewood Colorado. Design Edge PC will provide construction documentation an
This spending item is part of a $105,684 allocation.
See details
|
Public Buildings Service | 11/20/2009 |
ENVIRONMENTAL CHEMICAL CORPORATION | $5,280 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
GEOSTAT ENVIRONMENTAL, LLC | $5,164 |
Provide CABI for oversight of excavtion activity. Dispose of soils and provide stormwater requirements.
This spending item is part of a $29,750 allocation.
See details
|
Public Buildings Service | 2/11/2010 |
BUILDING SYSTEMS DESIGN INC | $4,895 | Specification Software | Public Buildings Service | 11/17/2009 |
BLUE LINE BUILDING SERVICES, INC. | $4,277 | Furnish all supervision and labor materials and equipment to accomplish all work included to install exhaust fan | Public Buildings Service | 10/21/2010 |
ORACLE AMERICA, INC. | $3,315 | Software Maintenance for Primavera P6 Enterprise Project Portfolio Management - Application User Perpetual | Public Buildings Service | 6/22/2011 |
UNISTAR-SPARCO COMPUTERS, INC. | $3,207 | 6 Xerox Color Printers | Public Buildings Service | 9/30/2011 |
SAMUEL ENGINEERING, INC. | $2,973 | Provide drafting and design services to prepare drawings to be used for the design-build bridging contract documents. | Public Buildings Service | 8/26/2010 |
DECO, INC. | $2,408 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
HUDSPETH & ASSOCIATES, INC | $2,232 |
This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati
This spending item is part of a $1,232,541 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
PREMISYS SUPPORT GROUP, INC. | $1,890 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
KCORP TECHNOLOGY SERVICES | $1,649 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
The Environmental Partnership | $1,500 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |