Pueblo County, Colo., funds by Army, Department of
Listing $1,054,015.78 in stimulus funds from Army, Department of for Pueblo
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
EL PASO PLUMBING, INC. | $559,460 |
Provide all plant, labor, equipment, materials, design, engineering, and incidentals necessary to accomplish the following: Repair/Upgrade the Peterson Installation Control Center in Bldg. 845. Design and Construct the renovation of the existing Command
This spending item is part of a $6,189,695 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/10/2009 |
SOUTH SIDE LAWN & LANDSCAPING LLC | $239,611 |
Design and Construction of a Child Development Center at Peterson Air Force Base
This spending item is part of a $8,146,116 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/29/2009 |
BAHA CONSTRUCTION INC | $184,902 |
Provide all plant, labor, equipment, materials, design, engineering, and incidentals necessary to accomplish the following: Repair/Upgrade the Peterson Installation Control Center in Bldg. 845. Design and Construct the renovation of the existing Command
This spending item is part of a $6,189,695 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/10/2009 |
A-VAR ELECTRIC, INC. | $51,735 |
The project includes replacing 12 boilers in 12 separate buildings during the summer of 2010 at Ft. Carson. The project includes engineering design services, demolition of existing boilers, installation of new boilers, piping connections, and boiler flue
This spending item is part of a $850,662 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/23/2010 |
A-VAR ELECTRIC, INC. | $12,830 |
The project includes replacing 12 boilers in 12 separate buildings during the summer of 2010 at Ft. Carson. The project includes engineering design services, demolition of existing boilers, installation of new boilers, piping connections, and boiler flue
This spending item is part of a $850,662 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/23/2010 |
A-VAR ELECTRIC, INC. | $5,478 |
The project includes replacing 12 boilers in 12 separate buildings during the summer of 2010 at Ft. Carson. The project includes engineering design services, demolition of existing boilers, installation of new boilers, piping connections, and boiler flue
This spending item is part of a $850,662 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/23/2010 |