Recovery Tracker

How Much Stimulus Funding is Going to Your County?

District of Columbia County, D.C., funds by Smithsonian Institution

Listing $15,865,913.64 in stimulus funds from Smithsonian Institution for District of Columbia

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
BISCAYNE CONTRACTORS, INC. $2,674,421 General Contracting, demolition, Hazmat removal
This spending item is part of a $3,686,421 allocation. See details
Smithsonian Institution 9/30/2009
SCHINDLER ELEVATOR CORPORATION $2,646,101 SEC shall furnish all supervision, labor, materials,and equipment necessary to complete escalator repair and upgrade work at NASM, as well as elevator upgrade work at the NMAH Smithsonian Institution 6/12/2009
M & M SALES, INC. $2,136,885 Recovery-Install high voltage electrical safety improvements Smithsonian Institution 4/10/2009
FORT MYER CONSTRUCTION CORPORATION $1,900,512 To provide supervision, labor, equipment and materials required to Repair the three (3) Bridges at the National Zoological Park (NZP). Washington DC
This spending item is part of a $1,959,505 allocation. See details
Smithsonian Institution 10/15/2009
POTOMAC ABATEMENT, INC. $1,012,000 General Contracting, demolition, Hazmat removal
This spending item is part of a $3,686,421 allocation. See details
Smithsonian Institution 9/30/2009
SEVERN ASSOCIATES, LLC $701,863 Providing all of the supervision, labor, material, and equipment tp perform construction services necessary for replacement of the roof and exterior repairs at the Lion/Tiger Complex and Research Hill Buildings, which include the Neocropsy, Biological Res
This spending item is part of a $2,703,958 allocation. See details
Smithsonian Institution 6/02/2009
WORCESTER EISENBRANDT, INC. $553,000 Provide all labor, materials, equipment, and supervision for the restoration of the exterior masonary at the Smithsonian Institution's Arts and Industries Building (AIB)
This spending item is part of a $932,261 allocation. See details
Smithsonian Institution 6/18/2009
BOVIS LEND LEASE, INC. $550,626 Provide project management support for the Smithsonian's AIB & NZP projects relating to the Recovery Act projects Smithsonian Institution 4/16/2009
HSU DEVELOPMENT, INC. $516,475 Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation. See details
Smithsonian Institution 6/05/2009
BOVIS LEND LEASE, INC. $383,728 Provide Construction Management support services for Smithsonian's AIB ARRA Demolition & Hazmat Removal and Masonry Restoration Projects Smithsonian Institution 9/23/2009
EDIFICE GROUP, INC. $379,262 Provide all labor, materials, equipment, and supervision for the restoration of the exterior masonary at the Smithsonian Institution's Arts and Industries Building (AIB)
This spending item is part of a $932,261 allocation. See details
Smithsonian Institution 6/18/2009
BOVIS LEND LEASE, INC. $366,323 Construction Management support services for Smithsonian NZP Bridge Repairs Project Smithsonian Institution 5/04/2009
CYNERGY ELECTRIC COMPANY, INC. $355,665 Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
This spending item is part of a $1,000,865 allocation. See details
Smithsonian Institution 6/05/2009
CYNERGY ELECTRIC COMPANY, INC. $350,951 Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
This spending item is part of a $1,000,865 allocation. See details
Smithsonian Institution 6/05/2009
HSU DEVELOPMENT, INC. $294,248 Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
This spending item is part of a $1,000,865 allocation. See details
Smithsonian Institution 6/05/2009
DJB CONTRACTING, INCORPORATED $254,210 NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation. See details
Smithsonian Institution 8/17/2009
PHOENIX FIRE PROTECTION, INC. $228,549 Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation. See details
Smithsonian Institution 6/05/2009
HELLER ELECTRIC COMPANY, INC. $223,447 Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation. See details
Smithsonian Institution 6/05/2009
SAS VENTURES, INC. $114,832 Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation. See details
Smithsonian Institution 6/05/2009
M. D. MILLER CO., INC. $58,993 To provide supervision, labor, equipment and materials required to Repair the three (3) Bridges at the National Zoological Park (NZP). Washington DC
This spending item is part of a $1,959,505 allocation. See details
Smithsonian Institution 10/15/2009
SMITHGROUP, INC. $56,479 Recovery funds- Arts & Industries Bldg Phase 1 Demolition and Hazmat Removal Construction Phase Services Smithsonian Institution 6/26/2009
ATLANTIC REFINISHING & RESTORATION, INC $50,253 NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation. See details
Smithsonian Institution 8/17/2009
SMITHGROUP, INC. $39,331 Recovery funds- Arts & Industries Bldg Masonry Repairs Construction Phase Services Smithsonian Institution 7/09/2009
Gales Warning Charters, Inc. $10,060 NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation. See details
Smithsonian Institution 8/17/2009
ARAMIS CONSTRUCTION, INC. $4,500 NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation. See details
Smithsonian Institution 8/17/2009
Waypoint Contracting Services, LLC $3,200 Providing all of the supervision, labor, material, and equipment tp perform construction services necessary for replacement of the roof and exterior repairs at the Lion/Tiger Complex and Research Hill Buildings, which include the Neocropsy, Biological Res
This spending item is part of a $2,703,958 allocation. See details
Smithsonian Institution 6/02/2009