Miami-Dade County, Fla., funds by General Services Administration
Listing $2,238,921.02 in stimulus funds from General Services Administration for Miami-Dade
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
NATIONAL ROOFING CO., INC. | $978,923 |
Design and install roof replacements and improvements of the Wilke D Ferguson Federal Building. Design and install roof replacements and improvements of the Brickell Plaza Federal Office Building. Goal for roof replacement is to provide a more energy ef
This spending item is part of a $1,528,661 allocation.
See details
|
Public Buildings Service | 10/26/2009 |
PLATINUM ONE CONTRACTING, INC. | $503,238 |
Design and install roof replacements and improvements of the Wilke D Ferguson Federal Building. Design and install roof replacements and improvements of the Brickell Plaza Federal Office Building. Goal for roof replacement is to provide a more energy ef
This spending item is part of a $1,528,661 allocation.
See details
|
Public Buildings Service | 10/26/2009 |
ENOLA CONTRACTING SERVICES INC | $361,933 |
Design/Build Thermal & Moisture Protection System Repairs at the Dyer Federal Courthouse in Miami, FL.
This spending item is part of a $765,106 allocation.
See details
|
Public Buildings Service | 12/17/2009 |
TENG & ASSOCIATES, INC. | $333,188 | Replace dampers and chilled water valves at the Air Handlers and Cooling Towers at the James Lawrence King Federal Justice Building. Dampers and valves to be wired and integrated into the new control system. | Public Buildings Service | 3/26/2010 |
MCDONOUGH BOLYARD PECK, INC | $57,490 | This project is an ARRA project to reroof the historic Dyer Courthouse in downtown Miami, FL and McDonough Bolyard Peck, Inc. is acting as Construction Management as-agent (CMa) during construction phase of the project. McDonough Bolyard Peck, Inc. will | Public Buildings Service | 4/20/2010 |
BROOKS RANGE CONTRACT SERVICES, INC. | $4,150 | Operations & Maintenance Contractor Support Services for the recommissioning project - Claude Pepper FB. We will be performing support services as called for by the gov and will be reimbured on a hour by hour as needed basis with a not to exceed amount. | Public Buildings Service | 2/17/2010 |