Orange County, Fla., funds by Department of Veterans Affairs
Listing $6,079,172.97 in stimulus funds from Department of Veterans Affairs for Orange
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ENTHALPY ENGINEERING CORP. | $1,278,596 | Design/build HVAC Repairs, Lakemont Campus, Orlando VA Medical Center | Department of Veterans Affairs | 7/30/2009 |
ENTHALPY ENGINEERING CORP. | $1,168,203 | Design/build HVAC Repairs, Lakemont Campus, Orlando VA Medical Center | Department of Veterans Affairs | 7/30/2009 |
MORAN CONSTRUCTION INC | $861,033 | Design and Construction of New Steam Pipe System, Orlando VAMC | Department of Veterans Affairs | 3/18/2010 |
J.A.M. CONSTRUCTION SERVICES, INC. | $588,000 | DEMOLITION AND REMOVAL OF EXISTING OPERATING ROOM(or) FINISHES | Department of Veterans Affairs | 6/12/2010 |
STROLLO ARCHITECTS INC | $386,989 | Up-Grade to Public Restrooms Phase 2 - Miami Veterans | Department of Veterans Affairs | 4/22/2009 |
ENTHALPY ENGINEERING CORP. | $345,512 | M-Deck Reinsulation of piping and HVAC Systems on entire M-Deck Building 500 at Orlando VA Medical Center | Department of Veterans Affairs | 6/29/2010 |
Johnson Controls, Inc | $317,470 |
Original contract was modified to add the 3 options that were proposed on during initial IFB and to add the cost of replacing the valves and providing negative air solutions for 3 AC units. Original contract price of $129,000 was increased by $278,880 br
This spending item is part of a $407,880 allocation.
See details
|
Department of Veterans Affairs | 7/28/2010 |
J.A.M. CONSTRUCTION SERVICES, INC. | $278,992 | DEMO AND REMOVAL OF EXISTING OR UTILITY SYSTEM | Department of Veterans Affairs | 6/09/2010 |
J.A.M. CONSTRUCTION SERVICES, INC. | $198,000 | OR HVAC Upgrades | Department of Veterans Affairs | 3/16/2011 |
TL SERVICES, INC. | $181,992 |
RENOVATE SPD CARTLIFT
This spending item is part of a $280,417 allocation.
See details
|
Department of Veterans Affairs | 4/09/2010 |
ASTOR CONSTRUCTION SERVICES INC | $137,775 | Replace Fire Alarm System | Department of Veterans Affairs | 6/24/2009 |
ASTOR CONSTRUCTION SERVICES INC | $133,775 | Replace Fire Alarm System Lakemont Campus | Department of Veterans Affairs | 6/15/2009 |
Kone Inc. | $98,425 |
RENOVATE SPD CARTLIFT
This spending item is part of a $280,417 allocation.
See details
|
Department of Veterans Affairs | 4/09/2010 |
BLUE CORD DESIGN AND CONSTRUCTION, LLC | $70,410 |
Original contract was modified to add the 3 options that were proposed on during initial IFB and to add the cost of replacing the valves and providing negative air solutions for 3 AC units. Original contract price of $129,000 was increased by $278,880 br
This spending item is part of a $407,880 allocation.
See details
|
Department of Veterans Affairs | 7/28/2010 |
Reliable Services Group, LLC | $20,000 |
Original contract was modified to add the 3 options that were proposed on during initial IFB and to add the cost of replacing the valves and providing negative air solutions for 3 AC units. Original contract price of $129,000 was increased by $278,880 br
This spending item is part of a $407,880 allocation.
See details
|
Department of Veterans Affairs | 7/28/2010 |
Wayne Automatic Fire Sprinklers, Inc. | $14,000 |
Lab Site Prep & Recovery
This spending item is part of a $1,514,718 allocation.
See details
|
Department of Veterans Affairs | 6/02/2010 |