Walton County, Fla., funds by Department of the Air Force
Listing $25,090,991.94 in stimulus funds from Department of the Air Force for Walton
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
C. W. ROBERTS CONTRACTING, INCORPORATED | $6,080,022 |
Repair Asphaltic Concrete on Runway 12/30 at Eglin AFB, FL. Mill existing asphalt, repave asphalt, and restripe pavement markings.
This spending item is part of a $6,291,088 allocation.
See details
|
Department of the Air Force | 6/01/2009 |
C. W. ROBERTS CONTRACTING, INCORPORATED | $5,318,435 |
Repair Asphaltic Concrete on Runway 01/19 at Eglin AFB, FL. Mill existing asphalt, repave asphalt, and restripe pavement markings.
This spending item is part of a $5,516,235 allocation.
See details
|
Department of the Air Force | 6/04/2009 |
C. W. ROBERTS CONTRACTING, INCORPORATED | $4,620,969 |
Replace Airfield Pavements around King Hanger and Taxiway R at Eglin AFB, FL. Mill and remove asphalt pavement, remove existing base material, excavate to subgrade, place new base material, install new aspahlt paving, and install new pavement markings.
This spending item is part of a $4,666,969 allocation.
See details
|
Department of the Air Force | 6/05/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $2,912,111 |
Removing existing concrete slabs on Taxiway M East parking apron and installing new concrete slabs with new graded aggregate base. Removing existing concrete slabs on Taxiway D apron and installing new concrete slabs with new graded aggregate base.
This spending item is part of a $4,493,210 allocation.
See details
|
Department of the Air Force | 6/11/2009 |
C. W. ROBERTS CONTRACTING, INCORPORATED | $2,132,237 |
Repair Asphaltic Concrete on Taxiways R & P at Eglin AFB, FL. Mill existing asphalt, repair base as shown on drawings, repave asphalt, and restripe pavement markings.
This spending item is part of a $2,197,327 allocation.
See details
|
Department of the Air Force | 6/01/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $1,444,642 |
Overlay Range Road 213 from Site B-75 to AUX Field 7. Widen each side of the road with 3 feet of base material and 2 feet of asphalt. Resurface the entire width of the roadway including the widened area. Restripe new pavement markings as well as grass the
This spending item is part of a $1,541,679 allocation.
See details
|
Department of the Air Force | 6/01/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $664,179 |
Repair Range Road 213 from Range Road 236 to Aux Field 5 Ramp at Eglin AFB, FL. Widen the existing road three feet on each side with aggregate base. Install new asphalt pavement over the existing roadway and the new widened area. Install new pavement mark
This spending item is part of a $696,195 allocation.
See details
|
Department of the Air Force | 6/04/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $252,881 |
Overlay the parking lot in the motor pool area adjacent to building 500 at Eglin AFB, FL. Mill the existing asphalt 2 and replace base course as necessary. Place new 2 asphalt paving and restripe new parking area.
This spending item is part of a $259,081 allocation.
See details
|
Department of the Air Force | 6/01/2009 |
C. W. ROBERTS CONTRACTING, INCORPORATED | $235,848 |
Overlay and widen Perimeter Road, Eglin AFB, FL. Widen each side of the road two foot. Overlay the existing roadway and restripe pavement markings.
This spending item is part of a $248,268 allocation.
See details
|
Department of the Air Force | 6/09/2009 |
C. W. ROBERTS CONTRACTING, INCORPORATED | $225,713 |
Overlay parking lot adjacent to the Eglin BX, Eglin AFB, FL. Mill and overlay the exsiting asphalt,replace concrete curb where shown on plans, replace base where shown on plans, and restripe parking lot.
This spending item is part of a $249,188 allocation.
See details
|
Department of the Air Force | 6/12/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $215,754 |
Remove rubber build up and restripe airfield pavements on Eglin AFB, FL and Duke Field.
This spending item is part of a $694,764 allocation.
See details
|
Department of the Air Force | 6/11/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $205,688 |
Restripe Roads and Parking Lots on Eglin AFB, FL.
This spending item is part of a $251,688 allocation.
See details
|
Department of the Air Force | 6/11/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $151,961 |
Replace pavements around Building 690 Parking Lot at Eglin AFB, FL. Mill the existing pavement, compact base as necessary, install new asphalt pavement, and install ne pavement markings.
This spending item is part of a $155,161 allocation.
See details
|
Department of the Air Force | 6/04/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $143,261 |
Replace pavements around Buildings 1405, 1354, 1351, and 1352. Mill existing pavement, install new pavement, restripe parking spaces, install new concrete bumper blocks.
This spending item is part of a $147,911 allocation.
See details
|
Department of the Air Force | 6/10/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $109,989 |
Construct new parking lot at Unity Park, Eglin AFB, FL. Design Parking lot, obtain necessary stormwater permits, clear and grub site, grade site, install base, install asphalt paving, install sidewalk, install parking lot striping, and install grassing.
This spending item is part of a $120,229 allocation.
See details
|
Department of the Air Force | 6/12/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $67,639 |
Install Airfield Closure Markings on various Auxillary Fields on Eglin AFB Reservation.
This spending item is part of a $137,214 allocation.
See details
|
Department of the Air Force | 9/17/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $66,679 |
Mill and resurface existing parking lot at Building 3067, Duke Field, Aux Fld 3, Eglin AFB. Restripe parking spaces as required. Remove Concrete and replace Base course if needed after milling.
This spending item is part of a $72,379 allocation.
See details
|
Department of the Air Force | 6/09/2009 |
C. W. ROBERTS CONTRACTING, INCORPORATED | $65,815 |
Overlay access roads adjacent to the Eglin BX, Eglin AFB, FL. Mill and overlay the exsiting asphalt,replace concrete curb where shown on plans, replace base where shown on plans, and restripe roadway.
This spending item is part of a $73,970 allocation.
See details
|
Department of the Air Force | 6/12/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $59,433 |
Mill and overlay asphalt equipment parking ramp in front of Hanger 1343 - 33rd Fighter Wing at Eglin AFB, FL.
This spending item is part of a $64,953 allocation.
See details
|
Department of the Air Force | 6/11/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $48,803 |
Replace Pavement around building 1408 Parking Lot at Eglin AFB, FL. Mill existing asphalt pavement, install new asphalt, restripe parking spaces, install new concrete bumper blocks.
This spending item is part of a $50,627 allocation.
See details
|
Department of the Air Force | 6/12/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $47,475 |
Overlay the parking lot adjacent to Dorm 18 along 7th Street at Eglin AFB,FL. Mill the existing asphalt, repair the base course where shown on the drawings, place new asphalt and restripe parking spaces.
This spending item is part of a $49,299 allocation.
See details
|
Department of the Air Force | 6/12/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $18,332 |
Install Airfield Closure Markings on various auxillary airfields on the Eglin AFB Reservation.
This spending item is part of a $39,584 allocation.
See details
|
Department of the Air Force | 6/02/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $2,376 |
Restripe Range Road 218(Navy EOD School Road) with reflective paint to match the existing configuration.
This spending item is part of a $9,900 allocation.
See details
|
Department of the Air Force | 6/11/2009 |
C. W. ROBERTS CONTRACING, INCORPORATED | $750 |
Restripe Parking Lot at Building 1345.
This spending item is part of a $4,750 allocation.
See details
|
Department of the Air Force | 6/04/2009 |