Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Fulton County, Ga., funds by General Services Administration

Listing $25,889,720.57 in stimulus funds from General Services Administration for Fulton

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CIRCLE GROUP, LLC, THE $2,630,101 The project consist of the renovation / modernization of the Dr. A.H. McCoy Federal Building located in Jackson, MS. The scope of work includes a complete renovation of the building's 15 floors plus the basement. The project also consist of replacing al
This spending item is part of a $72,509,875 allocation. See details
Public Buildings Service 7/24/2009
NATIONAL BUILDING CONTRACTORS, INC. $2,137,031 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
URS GROUP, INC $1,729,635 Lighting Retrofits - The GSA seeks to complete lighting retrofits on multiple federal courthouses and federal buildings throughout the Sunbelt Region. The lighting retrofits will utilize the latest lighting practices and equipment to enhance energy effici Public Buildings Service 3/30/2010
Acl & Assoc. LLC $1,337,697 The project consist of the renovation / modernization of the Dr. A.H. McCoy Federal Building located in Jackson, MS. The scope of work includes a complete renovation of the building's 15 floors plus the basement. The project also consist of replacing al
This spending item is part of a $72,509,875 allocation. See details
Public Buildings Service 7/24/2009
REAMS ENTERPRISES INC. $1,277,966 Modernizing building systems for energy conservation measures at the IRS Annex, Chamblee, GA. and Richard B. Russell Federal Building and U.S. Courthouse, Atlanta, GA.
This spending item is part of a $2,322,251 allocation. See details
Public Buildings Service 3/29/2010
National Energy Services Inc $1,253,433 Provide all labor, equipment, materials and supervision necessary for relighting project at Atlanta Federal Center in Atlanta, Georgia, as noted below in the place of primary performance.
This spending item is part of a $1,912,684 allocation. See details
Public Buildings Service 3/15/2010
GEO-MARINE, INC. $1,147,583 Advanced Metering installation 33 GSA Region IV buildings: AL0043AC Frank M Johnson FB-CT15 Lee Street Montgomery Alabama 36104 AL0076AB Federal Building 113 St. Joesph Street Mobile Alabama 36602 AL0028ZZ FB-CT 600 Broad Street Gadsen Alabama 35901 FL000
This spending item is part of a $1,929,228 allocation. See details
Public Buildings Service 9/30/2010
STOUTAMIRE WALKER INFORMATION TECHNOLOGY SERVICES INC $1,044,284 Modernizing building systems for energy conservation measures at the IRS Annex, Chamblee, GA. and Richard B. Russell Federal Building and U.S. Courthouse, Atlanta, GA.
This spending item is part of a $2,322,251 allocation. See details
Public Buildings Service 3/29/2010
NATIONAL ESCROW $976,907 Installation of electrical sub metering in various locations/buildings throughout the southeast region. Public Buildings Service 9/30/2010
AMEC E&I, INC $964,697 Roof Inspections for various projects in the SE Region including: the Stephens Federal Building in Athens, GA; Athens Federal Courthouse in Athens, GA; Tomochichi Federal Courthouse in Savannah, GA; Scarlett Federal Building-Courthouse in Brunswick, GA; G
This spending item is part of a $1,004,007 allocation. See details
Public Buildings Service 3/30/2010
AGL RESOURCES INC. $677,780 Remove Atmospheric Boilers approximately 40 years old and replacing with >95% efficient condensing boiler by using funds provided by the Recovery act. Public Buildings Service 3/22/2010
MACK SCOGIN MERRILL ELAM ARCHITECTS, INC $663,434 Construction Administration services for new U.S. Courthouse in Austin, TX. Construction Administration services last 36 months.
This spending item is part of a $1,959,793 allocation. See details
Public Buildings Service 7/25/2009
INTERNATIONAL ENERGY CONSERVATION SYSTEMS, INC $662,420 Advanced Metering installation 33 GSA Region IV buildings: AL0043AC Frank M Johnson FB-CT15 Lee Street Montgomery Alabama 36104 AL0076AB Federal Building 113 St. Joesph Street Mobile Alabama 36602 AL0028ZZ FB-CT 600 Broad Street Gadsen Alabama 35901 FL000
This spending item is part of a $1,929,228 allocation. See details
Public Buildings Service 9/30/2010
FIRE AND SECURITY, INC. $661,769 Installation of Fire Alarm Devices Government Funded/Awarded-at various buildings throughout the SouthEast Sunbelt Region Public Buildings Service 3/31/2010
NATIONAL ESCROW $661,769 We received government contract funds to install fire alarm devices at various buildings throughout southeast sunbelt region. Public Buildings Service 3/31/2010
GEORGIA POWER COMPANY $659,251 Provide all labor, equipment, materials and supervision necessary for relighting project at Atlanta Federal Center in Atlanta, Georgia, as noted below in the place of primary performance.
This spending item is part of a $1,912,684 allocation. See details
Public Buildings Service 3/15/2010
JACOBS TECHNOLOGY INC. $646,840 GSA REGION 4 ARRA ENGINEERING SUPPORT MECHANICAL AND ELECTRICAL ENGINEERING SUPPORT FOR GSA REGION 4 ARRA FUNDED PROJECTS. MECHANICAL AND ELECTRICAL ENGINEERING SUPPORT FOR GSA REGION 4 ARRA FUNDED PROJECTS. Public Buildings Service 3/05/2010
DANIEL MOVING SYSTEMS, INC. $617,949 The project consist of the renovation / modernization of the Dr. A.H. McCoy Federal Building located in Jackson, MS. The scope of work includes a complete renovation of the building's 15 floors plus the basement. The project also consist of replacing al
This spending item is part of a $72,509,875 allocation. See details
Public Buildings Service 7/24/2009
WORKING BUILDINGS, LLC $537,047 Provide Architecture and Engineering commissioning expertise to conduct re-commissioning / retro-commissioning planning, identify energy conservation and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendati
This spending item is part of a $646,205 allocation. See details
Public Buildings Service 8/14/2009
E M C ENGINEERS, INC. $468,149 Perform a holistic, systematic evalution of exisiting buildings and controls to identify and implement operational and maintenance improvements, and to ensure optimal performance over time. Provide cost and savings data for capital improvements on 6 loca Public Buildings Service 9/28/2009
WORKING BUILDINGS, LLC $432,880 Recovery: Provide Commissioning Services during the construction phase and post construction phase of the project. The scope of the project includes the renovation and new construction addition to the existing Internal Revenue Services (IRS) Service Cen
This spending item is part of a $600,213 allocation. See details
Public Buildings Service 7/21/2009
AMEC E&I, INC $427,530 Construction Management and Commissioning Services for the moderization of General Services Administration (GSA) Headquarters at 1800 F Street, NW, Washington, DC. The purpose is to manage the budget, schedule, and quality of the project for the GSA.
This spending item is part of a $8,871,525 allocation. See details
Public Buildings Service 12/24/2009
FIRE AND SECURITY, INC. $417,744 INSTALLATION OF FIRE ALARM DEVICES .WE RECEIVED GOVERNMENT CONTRACT FUNDS at various buildings throughout southeast sunbelt region Public Buildings Service 3/25/2010
NATIONAL ESCROW $417,744 We received government contract funds to install fire alarm devices in various buildings throughout southeast sunbelt region. Public Buildings Service 3/25/2010
NATIONAL ESCROW $402,060 We received government contract funds to install fire alarm devices in various buildings throughout the southeast sunbelt region. Public Buildings Service 3/25/2010
GEORGIA POWER COMPANY $290,683 Provide all labor and materials to complete relamping project at Richard B Russell Federal Building in Atlanta, Georgia as noted in the place of primary performance section.
This spending item is part of a $350,275 allocation. See details
Public Buildings Service 3/31/2010
MCDONOUGH BOLYARD PECK, INC $263,034 McDonough Bolyard Peck, Inc. provides Project and Construction Management services to General Services Administration Region IV for the administration of their American Recovery and Reinvestment Act program. In particular, McDonough Bolyard Peck, Inc. pr Public Buildings Service 7/02/2010
NATIONAL BUILDING CONTRACTORS, INC. $257,417 ARRA-funded replacement of penthouse and stair enclosure roofs with vegetated roofs.
This spending item is part of a $264,117 allocation. See details
Public Buildings Service 10/16/2009
Avid Energy LLC $256,151 Provide services for Architectural and engineering Lighting Studies for the Chamblee Internal Revenue Service Annex - GA0010AE, Chamblee, Georgia, based on the Request for Proposal dated 10/15/2009, the proposal, and all revised proposals including negoti
This spending item is part of a $334,381 allocation. See details
Public Buildings Service 12/11/2009
NEWCOMB & BOYD $243,270 Modernization of the existing George C. Young Courthouse/Federal Building, Orlando, Florida (approximately 140,000 square feet).
This spending item is part of a $5,212,556 allocation. See details
Public Buildings Service 9/03/2009
MCDONOUGH BOLYARD PECK, INC $226,428 McDonough Bolyard Peck, Inc. provides Construction Management services to GSA Region IV for the administration of their ARRA program. In particular, McDonough Bolyard Peck, Inc. provided a full time cost estimator for a period of one year in support of t Public Buildings Service 9/28/2010
KIDZ ZONE PLAY SYSTEMS: MID AMERICA LLC $175,000 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
WEST GEORGIA ROOFING II, INC. $141,585 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
U.S.COST INCORPORATED $135,000 Huntington Federal Building, Huntington, WV. The project objectives are: Modernize the existing heating,ventilation, air conditioning system to a Variable Air Volume system; Incorporate photo voltaic technology on the existing roof; Replace existing windo
This spending item is part of a $4,625,053 allocation. See details
Public Buildings Service 10/09/2009
COX, ALLEN AND ASSOCIATES, ARCHITECTS, INC $133,398 The purpose is to study and obtain results regarding electric energy consumption within the Romano L. Mazzoli Federal Building in Louisville, Kentucky. Public Buildings Service 11/30/2009
Michael E Clark & Associates $105,700 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
GEORGIA POWER COMPANY $78,230 Provide services for Architectural and engineering Lighting Studies for the Chamblee Internal Revenue Service Annex - GA0010AE, Chamblee, Georgia, based on the Request for Proposal dated 10/15/2009, the proposal, and all revised proposals including negoti
This spending item is part of a $334,381 allocation. See details
Public Buildings Service 12/11/2009
NEWCOMB & BOYD $75,074 Architectural and Engineering Services for Lighting Study for the Matthew Perry US Court House, Columbia, SC. The following tasks to be accomplished: Task No. 1 - Survey Existing Conditions; Task No. 2 - Lighting Conceptualization; Task No. 3 - Deleted
This spending item is part of a $104,877 allocation. See details
Public Buildings Service 12/01/2009
TIME & COST MANAGERS INC $67,080 The scope of this requirement is to provide support for the planning and estimating of construction projects and the repair and alteration projects funded by the American Recovery and Reinvestment Act (ARRA). Specifically, the team - ? Prepares initial c
This spending item is part of a $91,224 allocation. See details
Public Buildings Service 8/06/2009
COMMISSIONING & GREEN BUILDING SOLUTIONS, INC. $65,443 CAMPBELL Courthouse: Independent Commissioning Services Serve as the Commissioning (Cx) Agent for the ARRA Re-Commissioning project at Campbell CH, Mobile Al- and provide industry-standard commissioning services for implementation of project scope: contro Public Buildings Service 9/29/2011
FCB ENGINEERING $63,392 GOALS: The purpose of the McCoy Federal Building Modernization Project is to create a state-ofG??the art working environment for Federal tenants in Jackson, minimize future vacancies, operational efficiency and economy in building systems and provide prog
This spending item is part of a $3,635,607 allocation. See details
Public Buildings Service 7/29/2009
Chris Haggard Plumbing LLC $59,616 Advanced Metering installation 33 GSA Region IV buildings: AL0043AC Frank M Johnson FB-CT15 Lee Street Montgomery Alabama 36104 AL0076AB Federal Building 113 St. Joesph Street Mobile Alabama 36602 AL0028ZZ FB-CT 600 Broad Street Gadsen Alabama 35901 FL000
This spending item is part of a $1,929,228 allocation. See details
Public Buildings Service 9/30/2010
METROPOWER, INC. $59,610 Advanced Metering installation 33 GSA Region IV buildings: AL0043AC Frank M Johnson FB-CT15 Lee Street Montgomery Alabama 36104 AL0076AB Federal Building 113 St. Joesph Street Mobile Alabama 36602 AL0028ZZ FB-CT 600 Broad Street Gadsen Alabama 35901 FL000
This spending item is part of a $1,929,228 allocation. See details
Public Buildings Service 9/30/2010
SL King & Assoc $59,592 Provide all labor and materials to complete relamping project at Richard B Russell Federal Building in Atlanta, Georgia as noted in the place of primary performance section.
This spending item is part of a $350,275 allocation. See details
Public Buildings Service 3/31/2010
EATON ENERGY SOLUTIONS, INC. $46,045 Work includes the improvements of the existing Heating Ventitlation Air Conditioner system and the Building Automation System including sequenace of operation, improved setpoints, hardware replacement and Heating Ventitlation Air Conditioner equipment rep Public Buildings Service 9/15/2011
TTV ARCHITECTS INC $41,706 Architectural and engineering lighting studies for the Sam Gibbons United States District Courthouse in Tampa, Florida
This spending item is part of a $128,061 allocation. See details
Public Buildings Service 11/30/2009
HEERY INTERNATIONAL, INC. $39,310 Roof Inspections for various projects in the SE Region including: the Stephens Federal Building in Athens, GA; Athens Federal Courthouse in Athens, GA; Tomochichi Federal Courthouse in Savannah, GA; Scarlett Federal Building-Courthouse in Brunswick, GA; G
This spending item is part of a $1,004,007 allocation. See details
Public Buildings Service 3/30/2010
Heaton Erecting, Inc. $39,182 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
INTEGRITY MANAGEMENT CONSULTING, INC $24,144 The scope of this requirement is to provide support for the planning and estimating of construction projects and the repair and alteration projects funded by the American Recovery and Reinvestment Act (ARRA). Specifically, the team - ? Prepares initial c
This spending item is part of a $91,224 allocation. See details
Public Buildings Service 8/06/2009
BROOKS RANGE CONTRACT SERVICES, INC. $20,196 Operation & Maintenance Support Services for Recommissioning Services at the Richard B Russell FBCT Atlanta, Georgia - GA0121ZZ. This is a support function type job on a hour by hour basis to support others in the recommisssioning effort with a not to ex Public Buildings Service 2/11/2010
R.K. Elite Hydro-Vac Services, Inc. $20,160 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
SCHNEIDER ELECTRIC USA, INC. $19,383 THE PURPOSES OF THIS CONTRACT ARE TO PROVIDE ELECTRIC, WATER, GAS, COOLING TOWER, AND STEAM ADVANCED METERING TIE IN INTEGRATIONS FOR BA04 PROJECTS FOR FEDERAL BUILDINGS, COURTHOUSES, AND US POST OFFICES IN GEORGIA, ALABAMA, FLORIDA, NORTH CAROLINA, SOUTH Public Buildings Service 2/17/2011
SCHNEIDER ELECTRIC USA, INC. $12,283 THE PURPOSE OF THIS CONTRACT IS TO PROVIDE ELECTRIC, WATER, GAS, COOLING TOWER AND STEAM ADVANCED METER TIE-IN INTEGRATIONS FOR BA03 PROJECTS FOR FEDERAL BUILDINGS, COURTHOUSES, AND US POST OFFICES IN GEORGIA, ALABAMA, FLORIDA, NORTH CAROLINA, SOUTH CAROL Public Buildings Service 12/07/2010
WEATHERPROOFING TECHNOLOGIES, INC. $10,000 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010
Landscape Support Svc $6,700 ARRA-funded replacement of penthouse and stair enclosure roofs with vegetated roofs.
This spending item is part of a $264,117 allocation. See details
Public Buildings Service 10/16/2009
ROOFMAINTENANCE.COM, INC. $1,210 ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs.
This spending item is part of a $2,629,868 allocation. See details
Public Buildings Service 2/08/2010