Muscogee County, Ga., funds by Army, Department of

Listing $26,160,211.22 in stimulus funds from Army, Department of for Muscogee

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
J2 ENGINEERING INC $2,352,317 Drainage improvement contract 33119 from Wold to Ingersoll
This spending item is part of a $2,425,069 allocation. See details
Army, Department of 3/30/2010
HOLMAN CONSTRUCTION & GENERAL CONTRACTORS INC $2,215,391 RENOVATE BLDG 7 Army, Department of 9/09/2009
EJS CONTRACTING, INC. $1,826,303 Upgrade propane injection plant building 175 Army, Department of 12/04/2009
SAUER INCORPORATED $1,580,387 Barricks renovation to correct safery issues - Building 2832 - 3rd/75th Ranger 2833 and 2834
This spending item is part of a $8,609,364 allocation. See details
Army, Department of 9/29/2009
Warr Grading Contractor, Inc. $1,224,533 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to replacement of storm sewer lines from Sigerfoos to Wold.
This spending item is part of a $1,761,397 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/30/2009
HOLMAN CONSTRUCTION & GENERAL CONTRACTORS INC $855,579 RENOVATE BLDG 67 Army, Department of 7/21/2009
FREEMAN & ASSOCIATES, INC. $748,622 The Contractor shall provide all services, material, equipment, and labor for the renovation of Buildings 72. Building 72 will be brought back to its original state of a theater. Thisbuilding is a historical property and as a result, the work must be perf
This spending item is part of a $1,144,848 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2009
WEBB CONSTRUCTION GROUP, INC. $743,081 Interior renovations to Child Development Center Army, Department of 3/31/2010
EJS CONTRACTING, INC. $739,443 Replace bridge 12 Army, Department of 12/23/2009
JORDAN ENTERPRISES, LLC $725,000 TASK ORDER FOR CONSTRUCTION OF REFOOF BUILDING 73, FORT BENNING, GA - Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Reroof Building 73. All work shall be performed in accordance with co
This spending item is part of a $1,408,910 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/13/2009
WEBB CONSTRUCTION GROUP, INC. $691,311 Interior renovations to dining facility Fort Benning GA Army, Department of 3/31/2010
HOLMAN CONSTRUCTION & GENERAL CONTRACTORS INC $681,122 BLDG 83 FIRE ALARM SYSTEM Army, Department of 9/17/2009
EJS CONTRACTING, INC. $667,373 Repair of Building 89 Army, Department of 3/29/2010
Indoor Solutions Hvac, Inc. $647,582 As a part of the Defense Health Program this project (OSD#27,P2#325203) Modernize Ortho, Peds, and Internal Med Building 09200, Martin Army Hospital, is to provide the repairs in these medical clinics to include plumbing, HVAC, electrical, nd other constr
This spending item is part of a $2,673,017 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/22/2010
J & J MAINTENANCE, INC. $604,062 As a part of the Defense Health Program this project, Modernize Dahlonega Health Clinic, Bldg 00027, Ft Benning, GA, will provide the a temporary building allowing TMC to operate during renovation, HAZMAT abatement, demolition, replament of roof, gutters,
This spending item is part of a $1,142,431 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/26/2010
HOLMAN CONSTRUCTION & GENERAL CONTRACTORS INC $598,114 BLDG 75 FIRE ALARM SYSTEM Army, Department of 9/17/2009
J & J MAINTENANCE, INC. $551,024 As a part of the Defense Health Program this project (OSD#27,P2#325203) Modernize Ortho, Peds, and Internal Med Building 09200, Martin Army Hospital, is to provide the repairs in these medical clinics to include plumbing, HVAC, electrical, nd other constr
This spending item is part of a $2,673,017 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/22/2010
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $536,864 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to replacement of storm sewer lines from Sigerfoos to Wold.
This spending item is part of a $1,761,397 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/30/2009
ROBINSON PAVING COMPANY $528,193 RESURFACE 8TH DIVISION ROAD Army, Department of 3/31/2010
ROBINSON PAVING COMPANY $521,226 RESURFACING WILD CAT RD Army, Department of 4/14/2010
DMS-ALLSTAR JV $494,177 TASK ORDER FOR CONSTRUCTION OF REFOOF BUILDING 73, FORT BENNING, GA - Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Reroof Building 73. All work shall be performed in accordance with co
This spending item is part of a $1,408,910 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/13/2009
SHERLOCK SMITH & ADAMS INC $449,649 This award consists of three projects for Architectural-Engineering (A-E) design. Project #1 is design for repair by replacement of Oral and General Surgery HVAC Systems, Building 9200 at Fort Benning, GA. Project #2 is design for renewal in support of U.S. Army Corps of Engineers, except civil program financing 6/08/2009
WEBB CONSTRUCTION GROUP, INC. $401,480 Upgrade HVAC systems and interior renovations Bldg 397 Ft Benning Army, Department of 3/31/2010
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $396,226 The Contractor shall provide all services, material, equipment, and labor for the renovation of Buildings 72. Building 72 will be brought back to its original state of a theater. Thisbuilding is a historical property and as a result, the work must be perf
This spending item is part of a $1,144,848 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2009
WARR GRADING CONTRACTOR, INC. $363,969 : Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to replacement of storm sewer lines from Lumpkin to Yeager. Job duration is 365 days from NTP.
This spending item is part of a $516,624 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/30/2009
DMS-ALLSTAR JV $337,499 Repair and renovate north side of Bldg 5000, which is the Ranger BN HQ Offices located at 8th Division Road in the Harmony Church Area. Contractor shall reconfigure north end of building IAW with enclosed drawing. All materials and colors shall match so U.S. Army Corps of Engineers, except civil program financing 9/22/2009
ALEXANDER CONTRACTING CO., INC. $326,940 Barricks renovation to correct safery issues - Building 2832 - 3rd/75th Ranger 2833 and 2834
This spending item is part of a $8,609,364 allocation. See details
Army, Department of 9/29/2009
T & D MECHANICAL, INC. $295,812 As a part of the Defense Health Program this project, Repair Oral Surgery and General Surgery HVAC, Bldg 09200, Martin Army Community Hospital, Ft Benning, GA, will provide the repair of the oral surgery and general surgery HVAC systems in bldg 09200 to i
This spending item is part of a $518,341 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/26/2010
SHERLOCK SMITH & ADAMS INC $269,927 As part of the Defense Health Programs at Fort Benning, we will provide design to modernize the Ortho, Peds, and Internal Medicine Clinics, Building 9200, for Martin Army Community Hospital in Fort Benning, Georgia. U.S. Army Corps of Engineers, except civil program financing 12/11/2009
EJS CONTRACTING, INC. $264,972 Repair bridge 14 at randall Creek Army, Department of 3/29/2010
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $234,505 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Replace Roof Bldg 241. Job duration is 120 calendar days from NTP.
This spending item is part of a $435,813 allocation. See details
Army, Department of 9/11/2009
RITCH ELECTRIC CO, INC. $229,826 As a part of the Defense Health Program this project (OSD#27,P2#325203) Modernize Ortho, Peds, and Internal Med Building 09200, Martin Army Hospital, is to provide the repairs in these medical clinics to include plumbing, HVAC, electrical, nd other constr
This spending item is part of a $2,673,017 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/22/2010
NATIVE AMERICAN SERVICES CORP. $225,954 RE-ROOF BUILDING 933
This spending item is part of a $488,954 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/11/2009
T & D MECHANICAL, INC. $197,927 As a part of the Defense Health Program this project (OSD#27,P2#325203) Modernize Ortho, Peds, and Internal Med Building 09200, Martin Army Hospital, is to provide the repairs in these medical clinics to include plumbing, HVAC, electrical, nd other constr
This spending item is part of a $2,673,017 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/22/2010
BEL-MAC ROOFING, INC. $189,733 TASK ORDER FOR CONSTRUCTION OF REFOOF BUILDING 73, FORT BENNING, GA - Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Reroof Building 73. All work shall be performed in accordance with co
This spending item is part of a $1,408,910 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/13/2009
BEL-MAC ROOFING, INC. $184,948 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Replace Roof Bldg 241. Job duration is 120 calendar days from NTP.
This spending item is part of a $435,813 allocation. See details
Army, Department of 9/11/2009
DON JONES CONSTRUCTION CO., INC. $165,129 Renovation of Building 2769 - Wigle Hall, Ft. Benning, GA Army, Department of 3/31/2010
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $152,655 : Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to replacement of storm sewer lines from Lumpkin to Yeager. Job duration is 365 days from NTP.
This spending item is part of a $516,624 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/30/2009
Lott Sheet Metal, Inc. $151,792 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to Re-Roof Main Library Bldg 93. Job duration 120 days from NTP.
This spending item is part of a $299,758 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/07/2009
AAROW EQUIPMENT & SERVICES, INC. $149,975 The objective of this project is to develop work plans and to replace the sanitary drain, steam, and condensate piping serving the kitchen in Martin Army Community Hospital, Ft Benning, GA. Martin Army Community Hospital was constructed in 1955, 500 bed
This spending item is part of a $263,816 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 5/22/2009
NATIVE AMERICAN SERVICES CORP. $144,931 REPAIR FAILING ROOF
This spending item is part of a $242,331 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/19/2009
J & J MAINTENANCE, INC. $128,209 As a part of the Defense Health Program this project, Repair Oral Surgery and General Surgery HVAC, Bldg 09200, Martin Army Community Hospital, Ft Benning, GA, will provide the repair of the oral surgery and general surgery HVAC systems in bldg 09200 to i
This spending item is part of a $518,341 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/26/2010
WEBB CONSTRUCTION GROUP INC $127,698 Re-Wire Hooks Range Trap Army, Department of 9/15/2009
DENNY ENTERPRISES $124,279 Barricks renovation to correct safery issues - Building 2832 - 3rd/75th Ranger 2833 and 2834
This spending item is part of a $8,609,364 allocation. See details
Army, Department of 9/29/2009
TRANE U.S. INC. $118,104 Cooling Tower Army, Department of 8/13/2009
J & J MAINTENANCE, INC. $113,841 The objective of this project is to develop work plans and to replace the sanitary drain, steam, and condensate piping serving the kitchen in Martin Army Community Hospital, Ft Benning, GA. Martin Army Community Hospital was constructed in 1955, 500 bed
This spending item is part of a $263,816 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 5/22/2009
Protech Fire Protection $110,464 Barricks renovation to correct safery issues - Building 2832 - 3rd/75th Ranger 2833 and 2834
This spending item is part of a $8,609,364 allocation. See details
Army, Department of 9/29/2009
HOLMAN CONSTRUCTION & GENERAL CONTRACTORS INC $104,819 UPGRADE BLDG 215 Army, Department of 8/11/2009
HARTIN ELECTRIC, INC. $100,000 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to Re-Roof Main Library Bldg 93. Job duration 120 days from NTP.
This spending item is part of a $299,758 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/07/2009
J2/KADELL J.V., LLC $83,664 Renovate Building 328 - Parking lot for proposed Tax Service Center Ft. Benning
This spending item is part of a $963,007 allocation. See details
Army, Department of 9/17/2009
J2 ENGINEERING INC $77,856 Joint Demonstration and Verification of the Performance of Microturbine Combined Heat and Power Generation
This spending item is part of a $1,953,507 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/19/2009
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $76,692 FURNISH AND INSTALL LABOR MATERIAL AND EQUIPMENT TO REPLACE THE ROOF ON BLG 328. JOB DURATION IS 90 DAYS FROM NTP.
This spending item is part of a $131,976 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/19/2009
J2/KADELL J.V., LLC $72,752 Drainage improvement contract 33119 from Wold to Ingersoll
This spending item is part of a $2,425,069 allocation. See details
Army, Department of 3/30/2010
Lott Sheet Metal, Inc. $55,284 FURNISH AND INSTALL LABOR MATERIAL AND EQUIPMENT TO REPLACE THE ROOF ON BLG 328. JOB DURATION IS 90 DAYS FROM NTP.
This spending item is part of a $131,976 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/19/2009
Sprinkler Contractors, Inc $54,170 As a part of the Defense Health Program this project (OSD#27,P2#325203) Modernize Ortho, Peds, and Internal Med Building 09200, Martin Army Hospital, is to provide the repairs in these medical clinics to include plumbing, HVAC, electrical, nd other constr
This spending item is part of a $2,673,017 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/22/2010
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $47,966 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to Re-Roof Main Library Bldg 93. Job duration 120 days from NTP.
This spending item is part of a $299,758 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/07/2009
DON JONES CONSTRUCTION CO., INC. $42,500 Replace Guard Rails Army, Department of 2/02/2010
ALEXANDER ELECTRIC CO. $40,000 Barricks renovation to correct safery issues - Building 2832 - 3rd/75th Ranger 2833 and 2834
This spending item is part of a $8,609,364 allocation. See details
Army, Department of 9/29/2009
C J HEARNE CONSTRUCTION CO $13,800 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Replace Roof Bldg 241. Job duration is 120 calendar days from NTP.
This spending item is part of a $435,813 allocation. See details
Army, Department of 9/11/2009
Alaga Paint Company, Inc. $2,560 Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Replace Roof Bldg 241. Job duration is 120 calendar days from NTP.
This spending item is part of a $435,813 allocation. See details
Army, Department of 9/11/2009