Listing $12,363,533.45 in stimulus funds from Agriculture, Department of for Clearwater

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
ASCORP, INC. $1,243,286 To widen and repair 2.1 miles of the Warren Wagon Road by mechanically stabilized earth walls, widening existing cut/fill sections and improving drainage measures. Work also includes surfacing 2.7 miles of road with an optional 3.2 miles of additional ro Forest Service 6/10/2010
STONE RIDGE CONSTRUCTION, INC $791,841 The Kelly Forks W.C. Housing project consists of the construction of (3) three 3-bedroom , approximately 1144-square foot modular buildings and appurtenances for the Clearwater National Forest at Kelly Forks Work Center. The project shall include the dem Forest Service 9/20/2010
DAVIDSON CONSTRUCTION INC $712,374 The project consists of a structural upgrade / repair and miscellaneous repairs to the existing 3360 s.f. visitor center and the adjacent 880 s.f. warming hut. Ten years after completion, the log structure has undergone unacceptable levels of settlement a Forest Service 9/10/2010
QUALITY PAVING & PATCHING, LLC $554,753 THIS AWARD WAS FOR ASPHALT CRACKSEAL AND PATCHING AT UPPER NORTH FORK RANGER DISTRICT, CLEARWATER NATIONAL FOREST.
This spending item is part of a $706,910 allocation. See details
Forest Service 8/23/2010
TRIPLE TREE, INC. $477,890 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r Forest Service 9/04/2009
TRIPLE TREE, INC. $457,644 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation. See details
Forest Service 9/04/2009
TRIPLE TREE, INC. $457,644 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation. See details
Forest Service 9/04/2009
QUALITY PAVING & PATCHING, LLC $450,000 This award is to do asphalt patching and sealing cracks in the Aquarius & Road 247 in Clearwater National Forest.
This spending item is part of a $609,899 allocation. See details
Forest Service 8/13/2010
CORRECTION, IDAHO DEPARTMENT $369,830 Recovery Act of 2009: Capital Improvement and Maintenance Funds received from the US Forest Service for the purpose of trail maintenance. The project is located on NFS lands administered by the Clearwater National Forest. The project targets needed deferred maintenance on trails located across the fo... Show more Forest Service 9/16/2009
DOWL, LLC $351,916 Clearwater National Forest, Region 1, received ARRA funding for design work and has identified a variety of projects from AOP culvert replacements, to asphalt repair and rehab to bridges replacements. Forest Service 9/04/2009
MULTIPLE RECIPIENTS $328,600 Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA Rural Housing Service 6/30/2009
T & T CONTRACTING INC $307,505 Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation. See details
Forest Service 5/12/2010
TRIPLE TREE, INC. $283,195 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The contractor shall r Forest Service 6/10/2010
TRIPLE TREE, INC. $283,195 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The contractor shall r Forest Service 6/10/2010
QUALITY PAVING & PATCHING, LLC $250,000 This contract is to do crack sealing and asphalt patching in select areas in Lochsa-Pierce Ranger District, Clearwater National Forest.
This spending item is part of a $304,840 allocation. See details
Forest Service 7/14/2010
DAVID ACTON BUILDING CORPORATION $238,630 LOWER NORTH FORK BRIDGE REPAIRS This contract will consists of bridge repairs on three bridges Flume Creek, Lolo Creek, and Skull Creek Bridges. Flume Bridge Repairs: This work will consists of removing and replacing timber abutment post, repairing stream Forest Service 8/03/2010
STONE RIDGE CONSTRUCTION, INC $229,838 The Powell Water Supply Line Replacement project consists of approximately 4,770 LF of new 6 water main construction, upgrades to the spring box, upgrades to the reservoir, and a highway crossing. This work will also include all other labor, materials an Forest Service 8/23/2010
STONE RIDGE CONSTRUCTION, INC $228,274 Work involves the removal of 2 existing culverts and the replacement with new Trideck beam bridges. Improvements consist of but are not limited to structural excavation, excavation and reshaping of the channel, placement of in-stream step pool structures Forest Service 3/10/2010
WEATHERGUARD, INC. $219,613 Deferred maintenance; roofing projects. Maintenance and repair of various roofs, forest wide. Forest Service 8/17/2010
STONE RIDGE CONSTRUCTION, INC $193,123 This project includes removing and disposing of an existing culvert, structural excavation, roadway embankment, backfilling, compacting, furnishing and setting a precast concrete bridge, placing riprap, and hauling and placing aggregate surfacing. Forest Service 3/25/2010
DOWL, LLC $190,297 Engineering design for Clearwater National Forest's China, Fisher Goat N. & S. and Mud N and SE AOP Sites, Pavement Design and Deep Fill Geotechnical Design Forest Service 12/21/2009
DALE A BARGER $187,123 Decommissioning 20 miles of canyon creek road and approximately ten to twelve miles of highline breaks road, turning the old roads back to natural landscape. Forest Service 4/26/2010
CXT INCORPORATED $172,475 PROJECT 11 RECREATION TOILET REPLACEMENTS. Forest Service 12/28/2009
RICHARDSON ENTERPRISES, INC. $170,294 Clearwater, North Fork Site Rehab Forest Service 9/23/2010
CXT INCORPORATED $168,025 PROJECT 11 RECREATION TOILET REPLACEMENTS. Forest Service 12/28/2009
BONNEVILLE ASPHALT & REPR LLC $159,899 This award is to do asphalt patching and sealing cracks in the Aquarius & Road 247 in Clearwater National Forest.
This spending item is part of a $609,899 allocation. See details
Forest Service 8/13/2010
DOWL, LLC $158,000 Inspection and testing on the Clearwater National Forest Forest Service 5/21/2010
EXECUTIVE OFFICE OF THE STATE OF IDAHO $152,524 Recovery Act of 2009: Capital Improvement and Maintenance Perform standard campground and sign maintenance in the Clearwater National Forest using disadvantaged youth. Forest Service 5/07/2010
BONNEVILLE ASPHALT & REPR LLC $152,157 THIS AWARD WAS FOR ASPHALT CRACKSEAL AND PATCHING AT UPPER NORTH FORK RANGER DISTRICT, CLEARWATER NATIONAL FOREST.
This spending item is part of a $706,910 allocation. See details
Forest Service 8/23/2010
MULTIPLE RECIPIENTS $143,310 Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA Rural Housing Service 5/31/2009
AGEE CONSTRUCTION $137,022 The purpose of the contact was to blade out any pot holes, wash boards, ruts and basically maintain forest roads and to clean debris from ditches to keep drainage flowing through proper channels. Forest Service 3/08/2010
GEORGE & JACKIE BRAMMER PARTNERSHIP $124,504 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 8/16/2010
STONE RIDGE CONSTRUCTION, INC $121,585 Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation. See details
Forest Service 5/12/2010
AGEE CONSTRUCTION $121,447 The purpose of the contract is to maintain forest roads and to clean debris from ditches to keep drainage flowing in the proper chanels Forest Service 8/30/2010
GREAT BURN STUDY GROUP $118,507 Recovery Act of 2009: Capital Improvement and Maintenance North Idaho Counties Trail Maintenance and Reconstruction. Specifically to: provide a Trail Liaison Program Coordinator to work with the Forest Service on the Trail Deferred Maintenance program. This person will work with volunteers, contracto... Show more Forest Service 2/23/2010
VERKIST CUBED LLC $114,015 Brushing and Clearing Trails Forest Service 4/19/2010
HIGH COUNTRY SPRAYERS, LLC $110,000 To perform road side noxious weed spraying on Federal Forest service roads as well as misc. forest owned properties. Cover 50 feet from center of road each direction. Spraying 400 miles of road and nearly 150 acres of buildings, campsites, misc. gravel Forest Service 5/25/2010
NEZ PERCE TRIBE $100,229 Recovery Act of 2009: Capital Improvement and Maintenance Weed Coordinator for Nez Perce Tribe. Coordination with Nez Perce Clearwater National Forest and other land managers. Implement a well rounded weed management program that includes inventory, monitoring, control, prevention, education, and res... Show more Forest Service 12/30/2009
OLD GOAT ENTERPRISES $92,335 Trail maintenance and brushing in the Clearwater National Forest. Trails to be worked are: Weitas Ridge, Lean To Point, Yokum Ridge, Liz Butte, Yokum Creek, Greenside Butte, Gold Hill, Indian Meadows, Cooperation, Mocus Point, Warm Springs, Pouliot, Ceda Forest Service 4/18/2010
DOWL, LLC $91,339 Engineering design Clearwater National Forest for Final Design Bridges Forest Service 1/27/2010
BITTER ROOT RESOURCE CONSERVATION & DEVELOPMENT AREA INC $75,414 Recovery Act of 2009: Capital Improvement and Maintenance The purpose of the award is to work cooperatively on the public lands managed by the Clearwater National Forest, provideconservation leadership training and work as a liaison woth CORs for the trails and backcountry recreation and wilderness p... Show more Forest Service 2/18/2010
AGEE CONSTRUCTION $72,056 The purpose of the contact was to maintain forest roads and to clean debris from ditches to keep drainage flowing through proper channels. Forest Service 7/24/2009
OLD GOAT ENTERPRISES $66,300 Trail brushing and maintenance in the Clearwater-Nez Perce National Forest. Names of trails to be worked are: Churchhill, Running Creek, Lynx Creek, Wounded Doe, Rapid Creek, and Cayuse-Monroe. Forest Service 9/16/2010
B H & W PTN $62,446 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 8/16/2010
TNT CONSTRUCTION $57,500 Clearwater painting for Powell, Kooskia, Canyon work centers. Forest Service 8/25/2010
ANDERSON ELECTRIC $56,741 lighting contract Forest Service 5/18/2010
BONNEVILLE ASPHALT & REPR LLC $54,840 This contract is to do crack sealing and asphalt patching in select areas in Lochsa-Pierce Ranger District, Clearwater National Forest.
This spending item is part of a $304,840 allocation. See details
Forest Service 7/14/2010
BARGER LOGGING $50,000 GAME CREEK ROAD DECOMMISSIONING Forest Service 4/16/2010
ANNIS, DUANE $49,652 RECOVERY Deferred Trail Maintenance,clearing windfall and brush and cleaning culverts and ditches of debris on forest trails Forest Service 4/16/2010
ANNIS, DUANE $49,652 RECOVERY Deferred Trail Maintenance, Clearwater National Forest project. Forest Service 4/16/2010
RIVERVIEW CONSTRUCTION $45,467 NEW PUMP HOUSE AND PIPING Forest Service 8/20/2010
R. J. THOMAS MANUFACTURING COMPANY, INC. $40,275 CIM-0105-23F PROJECT 7 REC DEFERRED MTNC REPLACE FIRE RINGS Forest Service 4/22/2010
MULTIPLE RECIPIENTS $40,149 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 6/30/2010
BUDGET ELECTRIC INC $39,183 THE POWELL RANGER STATION PROJECT REQUIRES THE DEMOLITION AND DISPOSAL OF EXISTING LIGHT FIXTURES AND LAMPS AND THE INSTALLATION OF NEW LIGHT FIXTURES, LAMPS, AND OCCUPANCY SENSORS AT THE RANGER STATION. Forest Service 5/19/2010
GRAY LUMBER COMPANY, INC $39,120 We provided treated sign posts for use in the parks to facilitate the installation of signage that would showcase services and ammenities available to the public and enhance their experience. Forest Service 6/03/2010
JIM ZENNER FARMS $37,938 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 7/22/2010
NORTH IDAHO DRILLING INC $36,783 Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation. See details
Forest Service 5/12/2010
DANNY & DONNA BROWN $35,166 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 6/09/2010
GREAT BURN STUDY GROUP $34,540 Recovery Act of 2009: Capital Improvement and Maintenance North Idaho Counties Trail Maintenance and Reconstruction Specifically, this award is to accomplish the following: apply herbicides to noxious weeds by a state licensed professional, conduct bug releases to combat noxious weeds, provide appro... Show more Forest Service 2/23/2010
HAIGHT, GARY $32,640 0245E0035M Catering Service for Backcountry Facilities Maintenance Crews at Weitas Guard Station and Weitas Butte Spike Camp Forest Service 7/07/2010
DALE A BARGER $31,467 Log Landing Forest Service 3/25/2010
DALE A BARGER $31,467 log landing rehabilitation Forest Service 3/17/2010
LAND RECLAMATION SERVICES LLC $23,752 Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation. See details
Forest Service 5/12/2010
CALLISON TRUCKING AND EXCAVATION $20,246 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation. See details
Forest Service 9/04/2009
Callison Trucking and Excavation $20,246 This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation. See details
Forest Service 9/04/2009
DOWL, LLC $15,273 Clearwater National Forest, Region 1, received ARRA funding for site visits to prepare for projects from AOP culvert replacements, to asphalt repair and rehab to bridges replacements. Forest Service 9/14/2009
TRI-PRO CEDAR PRODUCTS, INC. $13,920 200 pieces of 3x12x16' Cedar #2&Btr bridge planking Forest Service 5/17/2010
PACIFIC LUMBER RESOURCES, INC. $5,775 For 150 gallons of waterproofer for picnic tables maintenance in the Clearwater Forest Forest Service 4/12/2010
AGEE CONSTRUCTION $5,666 ROAD BLADING Forest Service 6/24/2010
ANDERSON ELECTRIC $3,595 INSTALL NEW BEDROOM LIGHTING IN BEDROOMS AT DORMS CANYON RANGER STATION. INSTALL GROUND FAULT CIRCUITS IN FIRE CACHE BUILDING-CORRECT CODE VIOLATIONS IN WIRING FOR LIGHT SWITCHING FIRE CACHE. Forest Service 9/13/2010
MULTIPLE RECIPIENTS $796 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 10/31/2010
MULTIPLE RECIPIENTS $443 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 9/30/2010
MULTIPLE RECIPIENTS $440 Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY Farm Service Agency 3/26/2009
BERTHA LOUGH ESTATE $348 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 9/15/2010
MULTIPLE RECIPIENTS $0 Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA Rural Housing Service 9/30/2009