Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ASCORP, INC. | $1,243,286 | To widen and repair 2.1 miles of the Warren Wagon Road by mechanically stabilized earth walls, widening existing cut/fill sections and improving drainage measures. Work also includes surfacing 2.7 miles of road with an optional 3.2 miles of additional ro | Forest Service | 6/10/2010 |
STONE RIDGE CONSTRUCTION, INC | $791,841 | The Kelly Forks W.C. Housing project consists of the construction of (3) three 3-bedroom , approximately 1144-square foot modular buildings and appurtenances for the Clearwater National Forest at Kelly Forks Work Center. The project shall include the dem | Forest Service | 9/20/2010 |
DAVIDSON CONSTRUCTION INC | $712,374 | The project consists of a structural upgrade / repair and miscellaneous repairs to the existing 3360 s.f. visitor center and the adjacent 880 s.f. warming hut. Ten years after completion, the log structure has undergone unacceptable levels of settlement a | Forest Service | 9/10/2010 |
QUALITY PAVING & PATCHING, LLC | $554,753 |
THIS AWARD WAS FOR ASPHALT CRACKSEAL AND PATCHING AT UPPER NORTH FORK RANGER DISTRICT, CLEARWATER NATIONAL FOREST.
This spending item is part of a $706,910 allocation.
See details
|
Forest Service | 8/23/2010 |
TRIPLE TREE, INC. | $477,890 | This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r | Forest Service | 9/04/2009 |
TRIPLE TREE, INC. | $457,644 |
This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation.
See details
|
Forest Service | 9/04/2009 |
TRIPLE TREE, INC. | $457,644 |
This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation.
See details
|
Forest Service | 9/04/2009 |
QUALITY PAVING & PATCHING, LLC | $450,000 |
This award is to do asphalt patching and sealing cracks in the Aquarius & Road 247 in Clearwater National Forest.
This spending item is part of a $609,899 allocation.
See details
|
Forest Service | 8/13/2010 |
CORRECTION, IDAHO DEPARTMENT | $369,830 | Recovery Act of 2009: Capital Improvement and Maintenance Funds received from the US Forest Service for the purpose of trail maintenance. The project is located on NFS lands administered by the Clearwater National Forest. The project targets needed deferred maintenance on trails located across the foforest. The pr... Show more | Forest Service | 9/16/2009 |
DOWL, LLC | $351,916 | Clearwater National Forest, Region 1, received ARRA funding for design work and has identified a variety of projects from AOP culvert replacements, to asphalt repair and rehab to bridges replacements. | Forest Service | 9/04/2009 |
MULTIPLE RECIPIENTS | $328,600 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 6/30/2009 |
T & T CONTRACTING INC | $307,505 |
Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation.
See details
|
Forest Service | 5/12/2010 |
TRIPLE TREE, INC. | $283,195 | This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The contractor shall r | Forest Service | 6/10/2010 |
TRIPLE TREE, INC. | $283,195 | This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The contractor shall r | Forest Service | 6/10/2010 |
QUALITY PAVING & PATCHING, LLC | $250,000 |
This contract is to do crack sealing and asphalt patching in select areas in Lochsa-Pierce Ranger District, Clearwater National Forest.
This spending item is part of a $304,840 allocation.
See details
|
Forest Service | 7/14/2010 |
DAVID ACTON BUILDING CORPORATION | $238,630 | LOWER NORTH FORK BRIDGE REPAIRS This contract will consists of bridge repairs on three bridges Flume Creek, Lolo Creek, and Skull Creek Bridges. Flume Bridge Repairs: This work will consists of removing and replacing timber abutment post, repairing stream | Forest Service | 8/03/2010 |
STONE RIDGE CONSTRUCTION, INC | $229,838 | The Powell Water Supply Line Replacement project consists of approximately 4,770 LF of new 6 water main construction, upgrades to the spring box, upgrades to the reservoir, and a highway crossing. This work will also include all other labor, materials an | Forest Service | 8/23/2010 |
STONE RIDGE CONSTRUCTION, INC | $228,274 | Work involves the removal of 2 existing culverts and the replacement with new Trideck beam bridges. Improvements consist of but are not limited to structural excavation, excavation and reshaping of the channel, placement of in-stream step pool structures | Forest Service | 3/10/2010 |
WEATHERGUARD, INC. | $219,613 | Deferred maintenance; roofing projects. Maintenance and repair of various roofs, forest wide. | Forest Service | 8/17/2010 |
STONE RIDGE CONSTRUCTION, INC | $193,123 | This project includes removing and disposing of an existing culvert, structural excavation, roadway embankment, backfilling, compacting, furnishing and setting a precast concrete bridge, placing riprap, and hauling and placing aggregate surfacing. | Forest Service | 3/25/2010 |
DOWL, LLC | $190,297 | Engineering design for Clearwater National Forest's China, Fisher Goat N. & S. and Mud N and SE AOP Sites, Pavement Design and Deep Fill Geotechnical Design | Forest Service | 12/21/2009 |
DALE A BARGER | $187,123 | Decommissioning 20 miles of canyon creek road and approximately ten to twelve miles of highline breaks road, turning the old roads back to natural landscape. | Forest Service | 4/26/2010 |
CXT INCORPORATED | $172,475 | PROJECT 11 RECREATION TOILET REPLACEMENTS. | Forest Service | 12/28/2009 |
RICHARDSON ENTERPRISES, INC. | $170,294 | Clearwater, North Fork Site Rehab | Forest Service | 9/23/2010 |
CXT INCORPORATED | $168,025 | PROJECT 11 RECREATION TOILET REPLACEMENTS. | Forest Service | 12/28/2009 |
BONNEVILLE ASPHALT & REPR LLC | $159,899 |
This award is to do asphalt patching and sealing cracks in the Aquarius & Road 247 in Clearwater National Forest.
This spending item is part of a $609,899 allocation.
See details
|
Forest Service | 8/13/2010 |
DOWL, LLC | $158,000 | Inspection and testing on the Clearwater National Forest | Forest Service | 5/21/2010 |
EXECUTIVE OFFICE OF THE STATE OF IDAHO | $152,524 | Recovery Act of 2009: Capital Improvement and Maintenance Perform standard campground and sign maintenance in the Clearwater National Forest using disadvantaged youth. | Forest Service | 5/07/2010 |
BONNEVILLE ASPHALT & REPR LLC | $152,157 |
THIS AWARD WAS FOR ASPHALT CRACKSEAL AND PATCHING AT UPPER NORTH FORK RANGER DISTRICT, CLEARWATER NATIONAL FOREST.
This spending item is part of a $706,910 allocation.
See details
|
Forest Service | 8/23/2010 |
MULTIPLE RECIPIENTS | $143,310 | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Rural Housing Service | 5/31/2009 |
AGEE CONSTRUCTION | $137,022 | The purpose of the contact was to blade out any pot holes, wash boards, ruts and basically maintain forest roads and to clean debris from ditches to keep drainage flowing through proper channels. | Forest Service | 3/08/2010 |
GEORGE & JACKIE BRAMMER PARTNERSHIP | $124,504 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 8/16/2010 |
STONE RIDGE CONSTRUCTION, INC | $121,585 |
Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation.
See details
|
Forest Service | 5/12/2010 |
AGEE CONSTRUCTION | $121,447 | The purpose of the contract is to maintain forest roads and to clean debris from ditches to keep drainage flowing in the proper chanels | Forest Service | 8/30/2010 |
GREAT BURN STUDY GROUP | $118,507 | Recovery Act of 2009: Capital Improvement and Maintenance North Idaho Counties Trail Maintenance and Reconstruction. Specifically to: provide a Trail Liaison Program Coordinator to work with the Forest Service on the Trail Deferred Maintenance program. This person will work with volunteers, contractotors and fores... Show more | Forest Service | 2/23/2010 |
VERKIST CUBED LLC | $114,015 | Brushing and Clearing Trails | Forest Service | 4/19/2010 |
HIGH COUNTRY SPRAYERS, LLC | $110,000 | To perform road side noxious weed spraying on Federal Forest service roads as well as misc. forest owned properties. Cover 50 feet from center of road each direction. Spraying 400 miles of road and nearly 150 acres of buildings, campsites, misc. gravel | Forest Service | 5/25/2010 |
NEZ PERCE TRIBE | $100,229 | Recovery Act of 2009: Capital Improvement and Maintenance Weed Coordinator for Nez Perce Tribe. Coordination with Nez Perce Clearwater National Forest and other land managers. Implement a well rounded weed management program that includes inventory, monitoring, control, prevention, education, and resestoration.... Show more | Forest Service | 12/30/2009 |
OLD GOAT ENTERPRISES | $92,335 | Trail maintenance and brushing in the Clearwater National Forest. Trails to be worked are: Weitas Ridge, Lean To Point, Yokum Ridge, Liz Butte, Yokum Creek, Greenside Butte, Gold Hill, Indian Meadows, Cooperation, Mocus Point, Warm Springs, Pouliot, Ceda | Forest Service | 4/18/2010 |
DOWL, LLC | $91,339 | Engineering design Clearwater National Forest for Final Design Bridges | Forest Service | 1/27/2010 |
BITTER ROOT RESOURCE CONSERVATION & DEVELOPMENT AREA INC | $75,414 | Recovery Act of 2009: Capital Improvement and Maintenance The purpose of the award is to work cooperatively on the public lands managed by the Clearwater National Forest, provideconservation leadership training and work as a liaison woth CORs for the trails and backcountry recreation and wilderness p projects. Th... Show more | Forest Service | 2/18/2010 |
AGEE CONSTRUCTION | $72,056 | The purpose of the contact was to maintain forest roads and to clean debris from ditches to keep drainage flowing through proper channels. | Forest Service | 7/24/2009 |
OLD GOAT ENTERPRISES | $66,300 | Trail brushing and maintenance in the Clearwater-Nez Perce National Forest. Names of trails to be worked are: Churchhill, Running Creek, Lynx Creek, Wounded Doe, Rapid Creek, and Cayuse-Monroe. | Forest Service | 9/16/2010 |
B H & W PTN | $62,446 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 8/16/2010 |
TNT CONSTRUCTION | $57,500 | Clearwater painting for Powell, Kooskia, Canyon work centers. | Forest Service | 8/25/2010 |
ANDERSON ELECTRIC | $56,741 | lighting contract | Forest Service | 5/18/2010 |
BONNEVILLE ASPHALT & REPR LLC | $54,840 |
This contract is to do crack sealing and asphalt patching in select areas in Lochsa-Pierce Ranger District, Clearwater National Forest.
This spending item is part of a $304,840 allocation.
See details
|
Forest Service | 7/14/2010 |
BARGER LOGGING | $50,000 | GAME CREEK ROAD DECOMMISSIONING | Forest Service | 4/16/2010 |
ANNIS, DUANE | $49,652 | RECOVERY Deferred Trail Maintenance,clearing windfall and brush and cleaning culverts and ditches of debris on forest trails | Forest Service | 4/16/2010 |
ANNIS, DUANE | $49,652 | RECOVERY Deferred Trail Maintenance, Clearwater National Forest project. | Forest Service | 4/16/2010 |
RIVERVIEW CONSTRUCTION | $45,467 | NEW PUMP HOUSE AND PIPING | Forest Service | 8/20/2010 |
R. J. THOMAS MANUFACTURING COMPANY, INC. | $40,275 | CIM-0105-23F PROJECT 7 REC DEFERRED MTNC REPLACE FIRE RINGS | Forest Service | 4/22/2010 |
MULTIPLE RECIPIENTS | $40,149 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 6/30/2010 |
BUDGET ELECTRIC INC | $39,183 | THE POWELL RANGER STATION PROJECT REQUIRES THE DEMOLITION AND DISPOSAL OF EXISTING LIGHT FIXTURES AND LAMPS AND THE INSTALLATION OF NEW LIGHT FIXTURES, LAMPS, AND OCCUPANCY SENSORS AT THE RANGER STATION. | Forest Service | 5/19/2010 |
GRAY LUMBER COMPANY, INC | $39,120 | We provided treated sign posts for use in the parks to facilitate the installation of signage that would showcase services and ammenities available to the public and enhance their experience. | Forest Service | 6/03/2010 |
JIM ZENNER FARMS | $37,938 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 7/22/2010 |
NORTH IDAHO DRILLING INC | $36,783 |
Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation.
See details
|
Forest Service | 5/12/2010 |
DANNY & DONNA BROWN | $35,166 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 6/09/2010 |
GREAT BURN STUDY GROUP | $34,540 | Recovery Act of 2009: Capital Improvement and Maintenance North Idaho Counties Trail Maintenance and Reconstruction Specifically, this award is to accomplish the following: apply herbicides to noxious weeds by a state licensed professional, conduct bug releases to combat noxious weeds, provide approropriate docum... Show more | Forest Service | 2/23/2010 |
HAIGHT, GARY | $32,640 | 0245E0035M Catering Service for Backcountry Facilities Maintenance Crews at Weitas Guard Station and Weitas Butte Spike Camp | Forest Service | 7/07/2010 |
DALE A BARGER | $31,467 | Log Landing | Forest Service | 3/25/2010 |
DALE A BARGER | $31,467 | log landing rehabilitation | Forest Service | 3/17/2010 |
LAND RECLAMATION SERVICES LLC | $23,752 |
Work consists of road reconditioning and placement of 23,528 tons of crushed aggregate surfacing on approximately 6 miles of Road 250 from Noe Creek Campground 6 miles West. Quarry development, rock crushing and pit restoration also are included. A gove
This spending item is part of a $489,625 allocation.
See details
|
Forest Service | 5/12/2010 |
CALLISON TRUCKING AND EXCAVATION | $20,246 |
This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation.
See details
|
Forest Service | 9/04/2009 |
Callison Trucking and Excavation | $20,246 |
This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r
This spending item is part of a $477,890 allocation.
See details
|
Forest Service | 9/04/2009 |
DOWL, LLC | $15,273 | Clearwater National Forest, Region 1, received ARRA funding for site visits to prepare for projects from AOP culvert replacements, to asphalt repair and rehab to bridges replacements. | Forest Service | 9/14/2009 |
TRI-PRO CEDAR PRODUCTS, INC. | $13,920 | 200 pieces of 3x12x16' Cedar #2&Btr bridge planking | Forest Service | 5/17/2010 |
PACIFIC LUMBER RESOURCES, INC. | $5,775 | For 150 gallons of waterproofer for picnic tables maintenance in the Clearwater Forest | Forest Service | 4/12/2010 |
AGEE CONSTRUCTION | $5,666 | ROAD BLADING | Forest Service | 6/24/2010 |
ANDERSON ELECTRIC | $3,595 | INSTALL NEW BEDROOM LIGHTING IN BEDROOMS AT DORMS CANYON RANGER STATION. INSTALL GROUND FAULT CIRCUITS IN FIRE CACHE BUILDING-CORRECT CODE VIOLATIONS IN WIRING FOR LIGHT SWITCHING FIRE CACHE. | Forest Service | 9/13/2010 |
MULTIPLE RECIPIENTS | $796 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 10/31/2010 |
MULTIPLE RECIPIENTS | $443 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 9/30/2010 |
MULTIPLE RECIPIENTS | $440 | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Farm Service Agency | 3/26/2009 |
BERTHA LOUGH ESTATE | $348 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 9/15/2010 |
MULTIPLE RECIPIENTS | $0 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 9/30/2009 |