Kootenai County, Idaho, funds by Energy, Department of
Listing $8,955,019.79 in stimulus funds from Energy, Department of for Kootenai
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CEDAR MOUNTAIN SUPPLY, INC. | $2,179,208 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CWR ENTERPRISES, LLC | $1,335,326 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
EHRLICH, ROBERT | $1,064,076 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $642,921 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $616,895 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
EHRLICH, ROBERT | $538,930 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $428,399 |
The High-Energy Battery Test Facility equipment will include 10 primary high-energy test stations; one vibration test station; one central control room; calibration equipment; and electric power, and HVAC upgrades necessary to conduct the battery testing.
This spending item is part of a $5,000,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
EHRLICH, ROBERT | $323,025 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
EHRLICH, ROBERT | $251,481 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
KOOTENAI, COUNTY OF | $205,000 |
State Energy Program The SEP ARRA Grant is comprised of 5 Program Markets: Schools Efficiency Project All 703 Idaho K through 12 schools will receive scoping audits, equipment and controls tune-ups, and energy use tracking and reporting software and sensor installation and t
This spending item is part of a $28,572,000 allocation.
See details
|
Energy, Department of | 3/11/2010 |
COEUR D'ALENE, CITY OF | $191,700 | Energy Efficiency and Conservation Block Grant Program (EECBG) Recovery Act - Energy Efficiency & Conservation Block Grant Program | Energy, Department of | 9/04/2009 |
EHRLICH, ROBERT | $153,492 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
T&T ROOFING AND SHEET METAL, INC. | $120,489 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This grant will enable Kootenai County to invest in energy efficient projects that will provide longterm economic benefits by decreasing energy use. Our energy efficiency and conservation strategy includes projects to retrofit buildings w with insulated roo... Show more
This spending item is part of a $374,400 allocation.
See details
|
Energy, Department of | 11/30/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $108,755 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
KOOTENAI, COUNTY OF | $98,552 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This grant will enable Kootenai County to invest in energy efficient projects that will provide longterm economic benefits by decreasing energy use. Our energy efficiency and conservation strategy includes projects to retrofit buildings w with insulated roo... Show more
This spending item is part of a $374,400 allocation.
See details
|
Energy, Department of | 11/30/2009 |
RIVERBEND GROUP LLC | $84,235 |
State Energy Program The Montana State Energy Program (SEP) ARRA plan will create and retain Montana jobs, save significant amounts of energy and taxpayer dollars in public and residential buildings, and lead to an increase in renewable energy production. SEP ARRA fund expend
This spending item is part of a $25,855,000 allocation.
See details
|
Energy, Department of | 7/02/2009 |
ICON CORPORATION | $81,800 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This grant will enable Kootenai County to invest in energy efficient projects that will provide longterm economic benefits by decreasing energy use. Our energy efficiency and conservation strategy includes projects to retrofit buildings w with insulated roo... Show more
This spending item is part of a $374,400 allocation.
See details
|
Energy, Department of | 11/30/2009 |
EHRLICH, ROBERT | $76,820 |
The High-Energy Battery Test Facility equipment will include 10 primary high-energy test stations; one vibration test station; one central control room; calibration equipment; and electric power, and HVAC upgrades necessary to conduct the battery testing.
This spending item is part of a $5,000,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
Granite Enterprises Inc | $73,559 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This grant will enable Kootenai County to invest in energy efficient projects that will provide longterm economic benefits by decreasing energy use. Our energy efficiency and conservation strategy includes projects to retrofit buildings w with insulated roo... Show more
This spending item is part of a $374,400 allocation.
See details
|
Energy, Department of | 11/30/2009 |
HAYDEN, CITY OF | $57,400 |
Energy Efficiency and Conservation Block Grant Program (EECBG) THE PURPOSE OF THIS AWARD IS TO IMPLEMENT THE RECIPIENT'S ENERGY EFFICIENCY AND CONSERVATION STRATEGY (EEC&S) IN ORDER TO REDUCE FOSSIL FUEL EMISSIONS; REDUCE TOTAL ENERGY USE OF THE ELIGIBLE ENTITIES; AND IMPROVE ENERGY EFFICIENCY IN THEHE BUILDING SECTOR,... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 9/29/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $52,832 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $51,167 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
CWR ENTERPRISES, LLC | $45,750 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $44,725 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $35,396 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CITY OF DALTON GARDENS | $33,352 |
Energy Efficiency and Conservation Block Grant Program (EECBG) THE PURPOSE OF THIS AWARD IS TO IMPLEMENT THE RECIPIENT'S ENERGY EFFICIENCY AND CONSERVATION STRATEGY (EEC&S) IN ORDER TO REDUCE FOSSIL FUEL EMISSIONS; REDUCE TOTAL ENERGY USE OF THE ELIGIBLE ENTITIES; AND IMPROVE ENERGY EFFICIENCY IN THEHE BUILDING SECTOR,... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 9/29/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $31,342 |
Enhanced Geothermal Systems (EGS) Technology R&D ($1.953M). This scope of work includes four scopes of work. 1) Air-Cooled Condensers in Next-Generation Conversion Systems. The Idaho National Laboratory (INL) will identify and resolve issues that ar
This spending item is part of a $3,780,015 allocation.
See details
|
Energy, Department of | 9/08/2009 |
CEDAR MOUNTAIN SUPPLY, INC. | $28,391 |
The High-Energy Battery Test Facility equipment will include 10 primary high-energy test stations; one vibration test station; one central control room; calibration equipment; and electric power, and HVAC upgrades necessary to conduct the battery testing.
This spending item is part of a $5,000,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |