Champaign County, Ill., funds by General Services Administration
Listing $1,308,614.35 in stimulus funds from General Services Administration for Champaign
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
RELIABLE CONTRACTING GROUP, LLC | $1,118,874 | This project includes but is not limited to the following work: Implementation of Energy Conservation Measures as recommended in the Re-Commissioning/Retro-Commissioning Report for this facility. These measures include: Replacement of existing air-cool | Public Buildings Service | 12/09/2009 |
KJWW, P.C | $80,040 |
Architecture and Engineering Services
This spending item is part of a $104,951 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
BAILEY EDWARD DESIGN, INC. | $39,635 |
Bailey Edward architecture has been contracted to perform post construction award phase services including architectural and engineering construction management and inspection.
This spending item is part of a $57,923 allocation.
See details
|
Public Buildings Service | 2/11/2010 |
BAILEY EDWARD DESIGN, INC. | $24,911 |
Architecture and Engineering Services
This spending item is part of a $104,951 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
KJWW, P.C | $18,550 |
Bailey Edward architecture has been contracted to provide construction phase services for the commissioning of the Federal Building and US Courthouse in Urbana, IL.
This spending item is part of a $26,867 allocation.
See details
|
Public Buildings Service | 3/31/2010 |
KJWW, P.C | $18,288 |
Bailey Edward architecture has been contracted to perform post construction award phase services including architectural and engineering construction management and inspection.
This spending item is part of a $57,923 allocation.
See details
|
Public Buildings Service | 2/11/2010 |
BAILEY EDWARD DESIGN, INC. | $8,316 |
Bailey Edward architecture has been contracted to provide construction phase services for the commissioning of the Federal Building and US Courthouse in Urbana, IL.
This spending item is part of a $26,867 allocation.
See details
|
Public Buildings Service | 3/31/2010 |