Cook County, Ill., funds by General Services Administration
Listing $193,604,933.88 in stimulus funds from General Services Administration for Cook
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PEPPER CONSTRUCTION GROUP LLC | $37,341,701 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
BERGLUND CONSTRUCTION COMPANY | $24,217,588 | Chicago Federal Plaza Restoration: John C Klyczynski Federal Plaza (JCK), Everett M. Dirksen Federal Courthouse (EMD) | Public Buildings Service | 12/17/2009 |
OWP/P CANNON DESIGN, INC. | $12,368,188 |
The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The
This spending item is part of a $13,280,552 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
TECTA AMERICA CORP. | $10,216,165 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
CORPVET LLC | $7,000,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
M. A. MORTENSON COMPANY | $6,438,486 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
F. E. Moran Inc. | $4,600,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
FACILITIES INFORMATION XCHANGE CONSULTING, LLC | $4,008,603 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
EDWARDS ENGINEERING, INC. | $3,917,500 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Maron Electric Company | $3,523,114 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
GHAFARI ASSOCIATES, L.L.C. | $3,153,583 | The Project is the restoration of the Chicago Federal Center (CFC) Plaza. The plaza is surrounded by the Dirksen Federal Courthouse, Kluczynski Federal Building and the United States Postal Service Loop Station. The three buildings and plaza were designed | Public Buildings Service | 6/11/2009 |
HILL MECHANICAL CORP. | $3,125,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
GEO-MARINE, INC. | $2,977,228 |
Advance metering installation for 45 buildings in GSA Region V: IL0032ZZ CUSTOMHOUSE 610 S Canal St Chicago IL 60607 IL0054ZZ FEDERAL BLDG 536 Clark St Chicago IL 60605 IL0069EF USCH 750 Missouri Ave E. St. Louis IL 62201 IL0154ZZ FED BLDG & USCH 100 N.E.
This spending item is part of a $4,113,097 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
OFFICE REVOLUTION LLC | $2,635,747 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
42/40 ARCHITECTURE INC. | $2,495,818 | The American Recovery and Reinvestment Act of 2009 (ARRA) has allocated funding for the design and modernization of the 10 West Jackson Federal Building, and the adjacent federally owned buildings at 18 West Jackson and 230 South State Street. The ARRA f | Public Buildings Service | 7/15/2009 |
OZANNE CONSTRUCTION COMPANY, INC. | $2,172,510 | This award is for GSA Construction Project Accounting for ARRA funded projects in the Great Lakes Region | Public Buildings Service | 9/20/2010 |
SEBESTA BLOMBERG & ASSOCIATES, INC. | $2,002,214 |
Commissioning Agent for General Services Administration Great Lakes Region 5: will perform services necessary to verify and document compliance with the General Services Administration performance objectives throughout the various phases of design and con
This spending item is part of a $2,122,954 allocation.
See details
|
Public Buildings Service | 1/29/2010 |
F. E. Moran Inc. | $2,000,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
KELSO-BURNETT CO. | $1,974,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
TURNER CONSTRUCTION COMPANY | $1,959,048 | The work that falls under this award number pertains to the following: 1) We are installing EM Modules/Ties - 2nd Fl-27th Fl. 2) We are installing Elevator Lobby Lighting Switching Controls and lamps for downlights. 3) We are reworking lighting in privat | Public Buildings Service | 3/30/2010 |
MTS TITAN ELECTRIC LLC | $1,923,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
G. E. RIDDIFORD COMPANY | $1,863,559 |
Project is to remove and replace approximately 48,000 Square Feet of deteroriated roof system and install new cool roof system meeting Energy Star requirements.
This spending item is part of a $3,891,154 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
J S L MASONRY RESTORATION, INC | $1,708,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
R.G. Construction Services, Inc. | $1,654,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
CT MECHANICAL, LLC | $1,520,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
TREMCO INCORPORATED | $1,459,791 |
Project is to remove and replace approximately 48,000 Square Feet of deteroriated roof system and install new cool roof system meeting Energy Star requirements.
This spending item is part of a $3,891,154 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
VISTARA CONSTRUCTION SERVICES INC | $1,412,454 | The restoration project will replace the waterproofing membrane and increase the insulation of the plaza, replace the lighting systems in the below grade Post Office workroom levels with more energy efficient lighting, repair damages caused by water leaks | Public Buildings Service | 7/14/2009 |
CMW AND ASSOCIATES CORPORATION | $1,371,157 | CMW is responsible for providing labor, supervision, and transportation necessary to perform the Project Management and Support Services for Recovery Act construction projects on federal buildings within the Great Lakes region. The primary location is the | Public Buildings Service | 8/31/2010 |
HUBER, WM CABINET WORKS (INC) | $1,355,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
TECTA AMERICA CORP. | $1,349,360 | Design and Construction of a roof replacement on the administrative portions of the Federal Archives and Research Center. The contract will contain work involving, but not limited to: demolition of existing roofing; installation of sheet and tapered insu | Public Buildings Service | 8/28/2009 |
GEORGE SOLLITT CONSTRUCTION COMPANY, THE | $1,296,238 | Construction Phase Services Exterior Stabilization, Repair and Recladding Federal Archives and Records Center, 7358 S. Pulaski Rd, Chicago, IL | Public Buildings Service | 4/19/2011 |
BREAK THRU ENTERPRISES INC | $1,255,680 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
STUDIO3 DESIGN, INC. | $1,230,997 |
Owner's Construction Representative services for the Modernization of the 10W. Jackson, 18 W. Jackson, and 230 S. State Street Project, located in Chicago, IL. The contract award is for the Base Services-Design/Pre-Construction Phase, Construction Year O
This spending item is part of a $1,391,896 allocation.
See details
|
Public Buildings Service | 9/09/2009 |
HONEYWELL INTERNATIONAL INC. | $1,173,805 |
Project Scope of Work includes automating control for 634 Variable Air Volume terminal units from pneumatic to Direct Digital Control. Upgrade includes the removal of existing pneumatic devices and installing a complete auotmated control system to operate
This spending item is part of a $1,784,411 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
TROSTRUD MOSAIC & TILE CO INC | $1,171,481 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
M.E. GROUP, INC. | $1,144,389 | COMMISSIONING & EXPERT SERVICES FOR THE FIRE ALARM & MECHANICAL UPGRADE FOR THE JCK BUILDING. The purpose of this project is to provide commisioning services and to verify the building systems meet the owners project requirements. The desired outcome of | Public Buildings Service | 1/21/2010 |
Any Temperature Co., Inc. | $1,050,000 |
Project Scope of Work includes modifications to the air distribution for underfloor plenums on the lower floors, fifteen (15) secondary air handlers to include modifying existing ductwork to incorporate the installation of return fans on speed controllers
This spending item is part of a $1,713,624 allocation.
See details
|
Public Buildings Service | 3/09/2010 |
BLOCK ELECTRIC CO., INC. | $1,014,615 |
The Chicago Federal Center Loop Station Post Office located at 211 S. Clark Street, Chicago, Illinois, has been designated to turn this federal building structure into high performance green buildings and move forward towards energy independence. The ove
This spending item is part of a $1,338,595 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
EVERGREEN SUPPLY CO. | $1,000,000 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $968,720 |
The goal of the base contract work is to improve the energy efficiency of federal buildings and minimize their environmental impact through the retro-commissioning/re-commissioning process. Building systems are evaluated to verify if they are operating pe
This spending item is part of a $1,351,186 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
TECTA AMERICA CORP. | $960,000 |
Provide photovoltaic roof, associated parts and installation services. Roof remove / replace, Photovoltaic mono and multi crystalline silicon cell panels, complete balance of system. Photovoltaic on sloped roof only. Location of project is the P
This spending item is part of a $1,800,000 allocation.
See details
|
Public Buildings Service | 10/15/2009 |
MOCA SYSTEMS, INC. | $927,466 | Construction Scheduler Services for Region 5, Chicago Category #1 projects. Construction projects include: Chicago Federal Center Plaza;Kluczynski FB & Loop USPO; 230 S. State Street; 536 S. Clark Street FB; Chicago Federal Center Loop USPO Station; US Cu | Public Buildings Service | 2/27/2010 |
CONTRACT SOLUTIONS LLC | $926,791 | The purpose is to provide scheduling oversight services on GSA capital construction projects in Region 5 to ensure timely and accurate reporting of progress and to provide recommendations to improve timely execution of the works. Each month we will submi | Public Buildings Service | 2/27/2010 |
MARKET CONTRACTING SERVICES, INC. | $922,092 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
DAVID ARCHITECTURAL METALS, INC. | $852,500 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Trainor Glass Company | $825,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
CLARK CONSTRUCTION GROUP, LLC | $812,128 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
NATIONAL DECORATING SERVICE, INCORPORATED | $731,675 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Alliance Drywall & Acoustical | $720,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Sign Concepts Corporation | $715,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Alliance Drywall & Acoustical | $680,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Alliance Drywall & Acoustical | $598,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
NATIONAL DECORATING SERVICE, INCORPORATED | $574,510 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
MADISON SERVICES, INC. | $563,196 |
Project Scope of Work includes modifications to the air distribution for underfloor plenums on the lower floors, fifteen (15) secondary air handlers to include modifying existing ductwork to incorporate the installation of return fans on speed controllers
This spending item is part of a $1,713,624 allocation.
See details
|
Public Buildings Service | 3/09/2010 |
MADISON SERVICES, INC. | $548,412 |
Project Scope of Work includes automating control for 634 Variable Air Volume terminal units from pneumatic to Direct Digital Control. Upgrade includes the removal of existing pneumatic devices and installing a complete auotmated control system to operate
This spending item is part of a $1,784,411 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
Metropolitan Fire Protection, Inc. | $512,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
SCHNEIDER ELECTRIC USA, INC. | $498,463 | Advanced Metering System-Project Development and Project Management for Various Locations within Region 5, Great Lakes Region. | Public Buildings Service | 7/29/2009 |
JOHNSON CONTROLS, INC. | $489,851 |
Modify existing Supply and Return Air Handling Units to include the installation of fan speed controllers in addition to motor upgrades and fan blower components to economizer, or free cooling operation. Work also includes recommissioning air terminal uni
This spending item is part of a $671,766 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
UNITED STATES ALLIANCE FIRE PROTECTION, INC. | $467,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
R.G. Construction Services, Inc. | $446,365 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Prendimano Electrical Maintenance Co, Inc | $445,132 |
Advance metering installation for 45 buildings in GSA Region V: IL0032ZZ CUSTOMHOUSE 610 S Canal St Chicago IL 60607 IL0054ZZ FEDERAL BLDG 536 Clark St Chicago IL 60605 IL0069EF USCH 750 Missouri Ave E. St. Louis IL 62201 IL0154ZZ FED BLDG & USCH 100 N.E.
This spending item is part of a $4,113,097 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
INDUSTRIA, INC. | $441,005 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
Muska Electric Co. | $434,097 |
Advance metering installation for 45 buildings in GSA Region V: IL0032ZZ CUSTOMHOUSE 610 S Canal St Chicago IL 60607 IL0054ZZ FEDERAL BLDG 536 Clark St Chicago IL 60605 IL0069EF USCH 750 Missouri Ave E. St. Louis IL 62201 IL0154ZZ FED BLDG & USCH 100 N.E.
This spending item is part of a $4,113,097 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
GROVE MASONRY MAINTENANCE, INC. | $416,950 |
Project is to remove and replace approximately 48,000 Square Feet of deteroriated roof system and install new cool roof system meeting Energy Star requirements.
This spending item is part of a $3,891,154 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $414,212 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
FLOORING RESOURCES CORPORATION | $381,834 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Knickerbocker Roofing and Paving Co., Inc. | $373,000 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
ST LOUIS DESIGN & CONSTRUCTION, INC | $354,184 |
REPLACE ALL EXISTING LIGHTING AND INSTALL NEW LED LIGHTING, LOCATED AT 450 S FEDERAL PARKING FACILITY, CHICAGO, IL 60605. THE DESIRED OUTCOME OF THIS PROJECT IS TO MODERNIZE AND MAKE MORE EFFICIENT THE LIGHTING THROUGHOUT THIS FACILITY.
This spending item is part of a $494,174 allocation.
See details
|
Public Buildings Service | 7/28/2010 |
RAFFIN CONSTRUCTION COMPANY | $350,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Maron Electric Company | $304,375 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
BREAK THRU ENTERPRISES INC | $304,200 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
TBS SPECIALTIES DIRECT INC. | $296,970 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
EZ Blinds and Drapery, Inc. | $290,388 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
CARNOW, CONIBEAR & ASSOC., LTD. | $288,900 | The purpose of this project is to monitor the indoor air quality at 11 GSA properties throughout the planned and on-going ARRA-funded renovation projects. The sites include: USPO Loop Station, John C. Kluczynski Federal Bldg., 10 W. Jackson, Chicago, IL, | Public Buildings Service | 6/30/2010 |
CHARPIE CONSTRUCTION COMPANY, INC. | $281,480 |
The Chicago Federal Center Loop Station Post Office located at 211 S. Clark Street, Chicago, Illinois, has been designated to turn this federal building structure into high performance green buildings and move forward towards energy independence. The ove
This spending item is part of a $1,338,595 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
SCHNEIDER ELECTRIC USA, INC. | $260,725 | Advanced Metering Integration into 45 Buildings within Great Lakes Region 5 | Public Buildings Service | 3/29/2010 |
Muska Electric Co. | $256,641 |
Advance metering installation for 45 buildings in GSA Region V: IL0032ZZ CUSTOMHOUSE 610 S Canal St Chicago IL 60607 IL0054ZZ FEDERAL BLDG 536 Clark St Chicago IL 60605 IL0069EF USCH 750 Missouri Ave E. St. Louis IL 62201 IL0154ZZ FED BLDG & USCH 100 N.E.
This spending item is part of a $4,113,097 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
CARTER GROUP, INC., THE | $256,429 | Move management and related services associated with the ARRA project in the JCK Federal Building, Chicago, IL. | Public Buildings Service | 5/13/2010 |
TBS SPECIALTIES DIRECT INC. | $251,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
ROLF JENSEN & ASSOCIATES, INC. | $247,500 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
INDUSTRIA, INC. | $238,984 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
LS CONTRACTING GROUP, INC. | $230,790 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $229,473 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
TISHMAN CONSTRUCTION CORPORATION OF D.C. | $225,183 |
The goal of the base contract work is to improve the energy efficiency of federal buildings and minimize their environmental impact through the retro-commissioning/re-commissioning process. Building systems are evaluated to verify if they are operating pe
This spending item is part of a $1,351,186 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
GHAFARI ASSOCIATES, L.L.C. | $221,540 | The Project is the restoration of the Chicago Federal Center (CFC) Plaza. The plaza is surrounded by the Dirksen Federal Courthouse, Kluczynski Federal Building and the United States Postal Service Loop Station. The three buildings and plaza were designed | Public Buildings Service | 5/14/2010 |
WISS, JANNEY, ELSTNER ASSOCIATES, INC. | $211,649 |
RAY ARRA project is classified as a Building Modernization, requiring the project to achieve LEED Silver certification. The Robert A. Young (RAY) Federal Building, located in the downtown St. Louis Central Business District, was built in 1933 as a Termina
This spending item is part of a $2,719,222 allocation.
See details
|
Public Buildings Service | 6/13/2012 |
VENTURA ENTERPRISES INC. | $209,158 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
Cabworks, LLC | $205,010 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
ASCHER BROTHERS CO., INC. | $200,000 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
Faithful & Gould, Inc. | $195,340 |
The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The
This spending item is part of a $13,280,552 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
STL ARCHITECTS, INC. | $194,364 | Planning and designing for the recommissioning and retro-commissioning of the existing Metcalfe Federal Building in order to improve the energy efficiency and minimize the environmental impact of the existing building. This work includes a pre-design rep | Public Buildings Service | 7/23/2009 |
Midway Contracting Group, LLC | $193,500 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
HILL MECHANICAL CORP. | $191,763 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
AMERICAN FIRST CONTRACTING, INC. | $189,450 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
MADISON SERVICES, INC. | $181,915 |
Modify existing Supply and Return Air Handling Units to include the installation of fan speed controllers in addition to motor upgrades and fan blower components to economizer, or free cooling operation. Work also includes recommissioning air terminal uni
This spending item is part of a $671,766 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
URS GROUP, INC. | $181,171 | Provide qualified fire protection to perform design reviews for multiple stages of design. | Public Buildings Service | 2/25/2011 |
AMERICAN SYSTEMS CORPORATION | $168,801 | Cabling | General Services Administration | 10/19/2010 |
HBRA ARCHITECTS INCORPORATED | $164,735 |
Professional services for the construction phase of the Lipinski Federal Building Lobby Renovation (Chicago, IL).
This spending item is part of a $201,845 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
MOCA SYSTEMS, INC. | $161,728 | Construction Scheduler Services for GSA Region 5 Category #3 construction projects. Scheduling services are included for the following construction projects: Minneapolis US Courthouse; Dayton Federal Building & US Courthouse; and all limited scope projec | Public Buildings Service | 2/27/2010 |
BAUER LATOZA STUDIO LTD. | $157,283 |
The goal of the base contract work is to improve the energy efficiency of federal buildings and minimize their environmental impact through the retro-commissioning/re-commissioning process. Building systems are evaluated to verify if they are operating pe
This spending item is part of a $1,351,186 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
RAFFIN CONSTRUCTION COMPANY | $155,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
42/40 ARCHITECTURE INC. | $150,000 | The American Recovery and Reinvestment Act of 2009 (ARRA) has allocated funding to study the level of effectiveness of project team integration of the eleven major modernizations funded under the Act. To do this, 4240 will work with a university level re | Public Buildings Service | 9/30/2011 |
Boyd Electric Inc | $143,957 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
STUDIO A LLC | $143,526 |
The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The
This spending item is part of a $13,280,552 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
Boyd Electric Inc | $139,990 |
REPLACE ALL EXISTING LIGHTING AND INSTALL NEW LED LIGHTING, LOCATED AT 450 S FEDERAL PARKING FACILITY, CHICAGO, IL 60605. THE DESIRED OUTCOME OF THIS PROJECT IS TO MODERNIZE AND MAKE MORE EFFICIENT THE LIGHTING THROUGHOUT THIS FACILITY.
This spending item is part of a $494,174 allocation.
See details
|
Public Buildings Service | 7/28/2010 |
Wilkin Insulation Co. | $138,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
SCHNEIDER ELECTRIC USA, INC. | $135,324 | INTERCONNECTION OF THE ADVANCED METERS AT GENERAL SERVICES ADMINISTRATION REGION ONE TO SOFTWARE SYSTEM AT THE CENTRAL OFFICE. BUILDINGS INCLUCED ARE ROBERT N GIAMO FEDERAL BUILDING IN NEW HAVEN CT, THE RICHARD C LEE US COURTHOUSE IN NEW HAVEN CT, BRIAN M | Public Buildings Service | 9/23/2010 |
URS GROUP, INC. | $131,774 | Provide qualified fire protection to perform design reviews for multiple stages of design. | Public Buildings Service | 6/30/2010 |
Wilkin Insulation Co. | $130,000 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
HOLIAN INSULATION COMPANY | $129,570 |
Project is to remove and replace approximately 48,000 Square Feet of deteroriated roof system and install new cool roof system meeting Energy Star requirements.
This spending item is part of a $3,891,154 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $126,040 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
STL ARCHITECTS, INC. | $119,880 | Planning and designing for the recommissioning and retro-commissioning of the existing US Customs House Building in order to improve the energy efficiency and minimize the environmental impact of the existing building. This work includes a pre-design rep | Public Buildings Service | 7/23/2009 |
ENVIRONMENTAL DESIGN INTERNATIONAL, INC. | $116,491 |
The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The
This spending item is part of a $13,280,552 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
LA FORCE, INC. | $115,105 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Alliance Drywall & Acoustical | $106,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
Barsanti Woodwork Corporation | $101,389 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
CARRIER CORPORATION | $99,880 |
IMPLEMENT MECHANICAL, BUILDING AUTOMATION SYSTEM, RENEWABLES, AND OTHER ENERGY IMPROVEMENTS AT THE LLOYD D. GEORGE COURTHOUSE, 333 LAS VEGAS BOULAVARD SOUTH, LAS VEGAS, NEVADA. OUTCOME OF PROJECT WILL RESULT IN UPGRADED MECHANICAL EQUIPMENT REQUIRING LESS
This spending item is part of a $1,048,897 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
Kone Inc. | $97,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
GHAFARI ASSOCIATES, L.L.C. | $95,357 | The Project is divided into two phases. A lighting study and the design of the United States Postal Service Loop Station ground floor lobby lighting system. The lighting study is being prepared to serve as a basis for design recommendations for the replac | Public Buildings Service | 7/23/2009 |
MIDWEST DECORATING INC | $87,689 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
BURKE, CHRISTOPHER B ENGINEERING, LTD | $86,500 |
The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation.
See details
|
Public Buildings Service | 6/18/2009 |
CONCORD CONSULTING GROUP OF ILLINOIS, INC., THE | $83,125 |
Owner's Construction Representative services for the Modernization of the 10W. Jackson, 18 W. Jackson, and 230 S. State Street Project, located in Chicago, IL. The contract award is for the Base Services-Design/Pre-Construction Phase, Construction Year O
This spending item is part of a $1,391,896 allocation.
See details
|
Public Buildings Service | 9/09/2009 |
Mike Cachey | $80,000 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
C Cjm Engineers Ltd | $79,392 |
Project Scope of Work includes modifications to the air distribution for underfloor plenums on the lower floors, fifteen (15) secondary air handlers to include modifying existing ductwork to incorporate the installation of return fans on speed controllers
This spending item is part of a $1,713,624 allocation.
See details
|
Public Buildings Service | 3/09/2010 |
ALTUSWORKS, INC | $79,035 |
Commissioning Agent for General Services Administration Great Lakes Region 5: will perform services necessary to verify and document compliance with the General Services Administration performance objectives throughout the various phases of design and con
This spending item is part of a $2,122,954 allocation.
See details
|
Public Buildings Service | 1/29/2010 |
ENGINEERING STUDIO INC, THE | $77,774 |
Owner's Construction Representative services for the Modernization of the 10W. Jackson, 18 W. Jackson, and 230 S. State Street Project, located in Chicago, IL. The contract award is for the Base Services-Design/Pre-Construction Phase, Construction Year O
This spending item is part of a $1,391,896 allocation.
See details
|
Public Buildings Service | 9/09/2009 |
JACOBS/RYAN ASSOCIATES | $69,380 |
The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation.
See details
|
Public Buildings Service | 6/18/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $64,596 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $61,522 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
Prestige Distribution Corp | $57,393 |
The GSA has a requirement for restroom renovations and ADA upgrades. The scope of work, at the Dayton Federal building and Courthouse in Dayton Ohio, will include demolishing and renovating the Men's and Women's restroom on floors 2 through 6 with option
This spending item is part of a $1,166,930 allocation.
See details
|
Public Buildings Service | 12/16/2009 |
THORNTON TOMASETTI, INC. | $57,000 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
Wilkin Insulation Co. | $52,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
SAKO & ASSOCIATES, INC. | $50,038 |
GOALS: The purpose of the McCoy Federal Building Modernization Project is to create a state-ofG??the art working environment for Federal tenants in Jackson, minimize future vacancies, operational efficiency and economy in building systems and provide prog
This spending item is part of a $3,635,607 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
ASCHER BROTHERS CO., INC. | $42,531 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
Oosterbaan & Sons Co. | $42,500 |
The Chicago Federal Center Loop Station Post Office located at 211 S. Clark Street, Chicago, Illinois, has been designated to turn this federal building structure into high performance green buildings and move forward towards energy independence. The ove
This spending item is part of a $1,338,595 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
ENVIRONMENTAL SYSTEMS DESIGN, INC. | $40,736 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
STUDIO3 DESIGN, INC. | $40,710 |
The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The
This spending item is part of a $13,280,552 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
SKIDMORE, OWINGS & MERRILL LLP | $40,442 | The design team will review the lighting study dated December 11, 2009 by Ghafari & Associates as in relates to the EM Dirksen project. The design team will coordinate with the GSA to determine the appropriate light levels for the EMD lobby; this will inc | Public Buildings Service | 6/01/2010 |
F. E. MORAN, INC. FIRE PROTECTION | $36,589 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
MADISON SERVICES, INC. | $36,565 |
The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The
This spending item is part of a $13,280,552 allocation.
See details
|
Public Buildings Service | 7/28/2009 |
B + A Engineers, Ltd. | $36,471 |
Commissioning Agent for General Services Administration Great Lakes Region 5: will perform services necessary to verify and document compliance with the General Services Administration performance objectives throughout the various phases of design and con
This spending item is part of a $2,122,954 allocation.
See details
|
Public Buildings Service | 1/29/2010 |
TBS SPECIALTIES DIRECT INC. | $35,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
DAVID ARCHITECTURAL METALS, INC. | $32,500 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
KJWW, P.C | $32,426 |
Professional services for the construction phase of the Lipinski Federal Building Lobby Renovation (Chicago, IL).
This spending item is part of a $201,845 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
F E Moran Inc Alarm & Monitoring | $29,045 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
WISS, JANNEY, ELSTNER ASSOCIATES, INC. | $29,000 |
Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation.
See details
|
Public Buildings Service | 6/29/2009 |
FLOORING RESOURCES CORPORATION | $28,166 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
WILSON 5 SERVICE COMPANY, INC. | $27,810 |
Project Scope of Work includes automating control for 634 Variable Air Volume terminal units from pneumatic to Direct Digital Control. Upgrade includes the removal of existing pneumatic devices and installing a complete auotmated control system to operate
This spending item is part of a $1,784,411 allocation.
See details
|
Public Buildings Service | 11/25/2009 |
GHAFARI ASSOCIATES, L.L.C. | $22,551 | The GSA requires that a National Register eligibility assessment of the A.J. Celebrezze Federal Building be carried out. The building was constructed in 1967 by three firms: Outcalt, Guenther, Rode, Toguchi and Bonebreak; Shafer, Flynn & Associates; and D | Public Buildings Service | 9/29/2010 |
HEARD GENERAL CONTRACTORS | $21,284 |
Project is to remove and replace approximately 48,000 Square Feet of deteroriated roof system and install new cool roof system meeting Energy Star requirements.
This spending item is part of a $3,891,154 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $20,155 | Conservation cleaning of Sol Lewitt wall sculpture in Chicago, | Public Buildings Service | 9/23/2011 |
AC Iron, LLC | $20,000 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
BREAK THRU ENTERPRISES INC | $15,120 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
DAVID ARCHITECTURAL METALS, INC. | $15,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
ASSOCIATED ELECTRICAL CONTRACTORS, INC | $14,036 |
Project Scope of Work includes modifications to the air distribution for underfloor plenums on the lower floors, fifteen (15) secondary air handlers to include modifying existing ductwork to incorporate the installation of return fans on speed controllers
This spending item is part of a $1,713,624 allocation.
See details
|
Public Buildings Service | 3/09/2010 |
Alliance Fire Protection Inc | $13,924 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
NATIONAL DECORATING SERVICE, INCORPORATED | $13,815 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
FARRELLY BUILDING SERVICES, INC | $13,305 | Piping Modifications to accommodate the new roof at 536 S Clark Street. | Public Buildings Service | 9/30/2010 |
KEY ENGINEERING GROUP, LTD. | $12,498 | Overall purpose of this study was to comply with the National Environmental Policy Act (NEPA). NEPA study for the Chicago Federal Plaza restoration project. Project deliverables included preparation of an agenda (complete), meeting minutes and action it | Public Buildings Service | 10/06/2009 |
WISS, JANNEY, ELSTNER ASSOCIATES, INC. | $12,200 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
Bluestar Energy Solutions, LLC | $12,121 |
The award is to provide engineering and commissioning expertise to conduct re-commissioning / retro-commissioning planning, identify energy conservation measures, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and re
This spending item is part of a $291,882 allocation.
See details
|
Public Buildings Service | 8/27/2009 |
Vortex Enterprises, Inc. | $10,826 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
GHAFARI ASSOCIATES, L.L.C. | $9,041 | This lighting study is being prepared to serve as a basis for design recommendations for the replacement of the existing lighting system which will provide improved lighting control and energy efficiency. The subject of the study is the Ground Floor Lobby | Public Buildings Service | 9/17/2009 |
INDUSTRIAL DOOR COMPANY OF CHICAGO, INC. | $8,890 |
Renovation of three buildings for GSA in Chicago
This spending item is part of a $23,411,916 allocation.
See details
|
Public Buildings Service | 11/12/2009 |
Alliance Drywall & Acoustical | $8,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
AUTUMN CONSTRUCTION SERVICES, INC. | $7,000 |
Project Scope of Work includes modifications to the air distribution for underfloor plenums on the lower floors, fifteen (15) secondary air handlers to include modifying existing ductwork to incorporate the installation of return fans on speed controllers
This spending item is part of a $1,713,624 allocation.
See details
|
Public Buildings Service | 3/09/2010 |
QUAST CONSULTING AND TESTING, INC. | $6,800 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
BROCK CONSTRUCTION INC | $6,653 | Furnish and install one monetary switch on the west side of the building and wire it via a 2 conductor 16gauge plenum cable to the lighting control box (brain) in the east electrical closet. This is on the 6th, 7th, 9th, and 10th floors in Chicago, IL. | Public Buildings Service | 9/28/2011 |
UNIVERSAL ASBESTOS REMOVAL, INC | $4,700 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
WISS, JANNEY, ELSTNER ASSOCIATES, INC. | $4,237 |
The Cafeteria design was completed 2008, and ?shelved? due to lack of funding. The RAY building received funds under the American Recovery and Reinvestment Act of 2009, and the cafeteria was part of that scope. Because of the ?shelving?, there were some
This spending item is part of a $136,186 allocation.
See details
|
Public Buildings Service | 6/23/2009 |
ADT SECURITY SERVICES, INC. | $4,138 | Security device disconnect and reinstall services at the Birch Bayh U.S. Courthourse. | Public Buildings Service | 9/22/2011 |
Hadley Associates Inc | $3,875 |
The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract
This spending item is part of a $2,428,902 allocation.
See details
|
Public Buildings Service | 2/05/2010 |
FREGA ASSOCIATES LTD | $3,502 | Provided Architectural Services for Redesign of the Fall Protection Federal Building, 536 S Clark Street, Chicago IL. The Project Manager investigated the existing structural, architectural, and mechancial conditions and made modifications to the origina | Public Buildings Service | 8/06/2010 |
Alliance Drywall & Acoustical | $3,000 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
CONSTRUCTION COST SYSTEMS, INC. | $2,700 |
Professional services for the construction phase of the Lipinski Federal Building Lobby Renovation (Chicago, IL).
This spending item is part of a $201,845 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
LA FORCE, INC. | $2,395 |
GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O
This spending item is part of a $90,516,170 allocation.
See details
|
Public Buildings Service | 11/19/2009 |
ENVIRONMENTAL CONSULTING GROUP, INC. | $1,984 |
Professional services for the construction phase of the Lipinski Federal Building Lobby Renovation (Chicago, IL).
This spending item is part of a $201,845 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
FARRELLY BUILDING SERVICES, INC | $921 | Repair to Exhaust fan 8-3. Wires were crossed. Federal Building Chicago Illinois | Public Buildings Service | 6/14/2011 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $0 | Conservation cleaning treatment of Sol Lewitt wall art work at federal building in Chicago, IL. | Public Buildings Service | 10/21/2009 |