Lake County, Ill., funds by Department of Veterans Affairs
Listing $15,259,093.59 in stimulus funds from Department of Veterans Affairs for Lake
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PACRUTA, INC. | $5,484,037 | Recovery - Upgrade HVAC Bldg. #200 at the Edward Hines Jr. VA Hospital, Hines, IL | Department of Veterans Affairs | 4/21/2010 |
KROESCHELL ENGINEERING CO. | $2,898,040 |
Provide all labor, equipment, material and supervision to repair/replace steam lines in our steam distribution system at the V.A. Medical Center North Chicago. All work as per scope and specifications. Locations as per drawings and as shown during the wal
This spending item is part of a $4,014,689 allocation.
See details
|
Department of Veterans Affairs | 1/14/2010 |
BLUE YONDER, INC. | $1,367,700 | To repair and replace the windows in building 133 at the North Chicago VA Medical Center. | Department of Veterans Affairs | 10/28/2009 |
ANGELS GENERAL CONSTRUCTION, INC. | $749,900 | Contractor shall completely prepare site for construction operations, including demolition of existing street and walkway pole mounted luminaries and associated concrete pole foundations and furnish labor and materials and perform work for the installatio | Department of Veterans Affairs | 11/12/2009 |
BLUE YONDER, INC. | $643,000 | To replace the electrical sub-station at building 139 at the North Chicago VA Medical Center. | Department of Veterans Affairs | 10/28/2009 |
CPMA, INC. | $595,599 |
Provide all labor, equipment, material and supervision to repair/replace steam lines in our steam distribution system at the V.A. Medical Center North Chicago. All work as per scope and specifications. Locations as per drawings and as shown during the wal
This spending item is part of a $4,014,689 allocation.
See details
|
Department of Veterans Affairs | 1/14/2010 |
HAMMER LGC, INC. | $489,184 | Abate and Demolish Bldgs 38, 64, 119, and 130 | Department of Veterans Affairs | 3/23/2010 |
CANNON MANAGEMENT GROUP, LLC | $484,097 | Milling and placing new HMA on approx 140,000 sqft of roads. Removing approx 14,000 sq ft of sidewalks and replacing with new concrete to inlcude new ADA ramps and replacing approx 200 ln ft of new curb and gutter. Remove and replace concrete in loading | Department of Veterans Affairs | 3/18/2010 |
PACRUTA, INC. | $437,417 | Canteen Renovation | Department of Veterans Affairs | 3/23/2010 |
PACRUTA, INC. | $368,000 | Canteen Renovation | Department of Veterans Affairs | 3/23/2010 |
ENVIROPLUS, INC. | $280,000 |
Provide all labor, equipment, material and supervision to repair/replace steam lines in our steam distribution system at the V.A. Medical Center North Chicago. All work as per scope and specifications. Locations as per drawings and as shown during the wal
This spending item is part of a $4,014,689 allocation.
See details
|
Department of Veterans Affairs | 1/14/2010 |
LUSE THERMAL TECHNOLOGIES LLC | $241,050 |
Provide all labor, equipment, material and supervision to repair/replace steam lines in our steam distribution system at the V.A. Medical Center North Chicago. All work as per scope and specifications. Locations as per drawings and as shown during the wal
This spending item is part of a $4,014,689 allocation.
See details
|
Department of Veterans Affairs | 1/14/2010 |
PACRUTA BOLLER JOINT VENTURE | $209,000 | North Chicago Roads and Sidewalk Repairs | Department of Veterans Affairs | 9/28/2009 |
RBVETCO, LLC | $192,000 | Upgrade Medical Gas Piping | Department of Veterans Affairs | 3/18/2010 |
Jt Design, Inc | $146,250 |
ACM Removal and Reinstallation of floor coverings: Remove aprox. 12000 sq.ft. of ACM foor tile, 2000 sq.ft. of ACM wall tile, and 1200 sq.ft. of ACM ceiling tile. Work shall also include the installation of new VCT, Carpet, and Vinyl base. Work will be
This spending item is part of a $432,930 allocation.
See details
|
Department of Veterans Affairs | 10/16/2009 |
ENVIROPLUS, INC. | $140,346 |
ACM Removal and Reinstallation of floor coverings: Remove aprox. 12000 sq.ft. of ACM foor tile, 2000 sq.ft. of ACM wall tile, and 1200 sq.ft. of ACM ceiling tile. Work shall also include the installation of new VCT, Carpet, and Vinyl base. Work will be
This spending item is part of a $432,930 allocation.
See details
|
Department of Veterans Affairs | 10/16/2009 |
CPMA, INC. | $100,644 |
ACM Removal and Reinstallation of floor coverings: Remove aprox. 12000 sq.ft. of ACM foor tile, 2000 sq.ft. of ACM wall tile, and 1200 sq.ft. of ACM ceiling tile. Work shall also include the installation of new VCT, Carpet, and Vinyl base. Work will be
This spending item is part of a $432,930 allocation.
See details
|
Department of Veterans Affairs | 10/16/2009 |
HAMMER LGC, INC. | $66,875 | Renovate showers | Department of Veterans Affairs | 9/03/2009 |
BLUE YONDER, INC. | $64,259 | To repair and replace porch at building number 9 at the North Chicago VA Medical Center. | Department of Veterans Affairs | 10/08/2009 |
HAMMER LGC, INC. | $59,217 | Renovate and Upgrade Showers at the N. Chicago VAMC | Department of Veterans Affairs | 8/31/2009 |
KJWW, P.C | $46,185 | Replace air conditioning system at VA Hines | Department of Veterans Affairs | 11/23/2009 |
KROESCHELL ENGINEERING CO. | $45,690 |
ACM Removal and Reinstallation of floor coverings: Remove aprox. 12000 sq.ft. of ACM foor tile, 2000 sq.ft. of ACM wall tile, and 1200 sq.ft. of ACM ceiling tile. Work shall also include the installation of new VCT, Carpet, and Vinyl base. Work will be
This spending item is part of a $432,930 allocation.
See details
|
Department of Veterans Affairs | 10/16/2009 |
PACRUTA, INC. | $42,500 | VAMC North Chicago Dietetic Serving Line | Department of Veterans Affairs | 3/16/2010 |
PACRUTA, INC. | $42,500 | Dietetic Serving Line | Department of Veterans Affairs | 3/16/2010 |
Dixon Engineering Inc | $29,100 |
Bailey Edward architecture has been contracted to perform architecture and engineering services to paint and provide cathodic protection at the water tower.
This spending item is part of a $56,703 allocation.
See details
|
Department of Veterans Affairs | 1/27/2010 |
BAILEY EDWARD DESIGN, INC. | $27,603 |
Bailey Edward architecture has been contracted to perform architecture and engineering services to paint and provide cathodic protection at the water tower.
This spending item is part of a $56,703 allocation.
See details
|
Department of Veterans Affairs | 1/27/2010 |
KJWW, P.C | $8,900 | Replace tank liner | Department of Veterans Affairs | 8/10/2009 |