Allen County, Ind., funds by General Services Administration
Listing $1,356,781.44 in stimulus funds from General Services Administration for Allen
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. | $1,270,742 | Facility Management System-Including Accessories and repair parts, Computerized Systems for Surveillance, Monitoring, Controlling, Signalling and Reporting multiple functions, energy and Facility management functions and Services, Building Automation cont | Public Buildings Service | 3/31/2010 |
KJWW, P.C | $44,916 |
Bailey Edward has been contracted to perform architectural and engineering construction management and inspection services for the Energy Management System and Lighting Upgrades at the E. Ross Adair Federal Building and US Courthouse in Ft. Wayne, Indiana
This spending item is part of a $67,987 allocation.
See details
|
Public Buildings Service | 4/15/2010 |
BAILEY EDWARD DESIGN, INC. | $23,071 |
Bailey Edward has been contracted to perform architectural and engineering construction management and inspection services for the Energy Management System and Lighting Upgrades at the E. Ross Adair Federal Building and US Courthouse in Ft. Wayne, Indiana
This spending item is part of a $67,987 allocation.
See details
|
Public Buildings Service | 4/15/2010 |
KJWW, P.C | $9,686 |
Bailey Edward architecture has been contracted to perform architecture and engineering post construction contract award services for the Energy Management System Upgrade and Lighting at the E Ross Adair Federal Building and United States Courthouse in Ft.
This spending item is part of a $18,053 allocation.
See details
|
Public Buildings Service | 4/15/2010 |
BAILEY EDWARD DESIGN, INC. | $8,367 |
Bailey Edward architecture has been contracted to perform architecture and engineering post construction contract award services for the Energy Management System Upgrade and Lighting at the E Ross Adair Federal Building and United States Courthouse in Ft.
This spending item is part of a $18,053 allocation.
See details
|
Public Buildings Service | 4/15/2010 |