Marion County, Ind., funds by General Services Administration
Listing $124,117,030.57 in stimulus funds from General Services Administration for Marion
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SHIEL SEXTON COMPANY, INC. | $32,577,181 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
MESSER CONSTRUCTION CO. | $11,879,831 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Sullivan & Poore Inc | $10,218,369 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
INDIANAPOLIS ELECTRIC COMPANY INCORPORATED | $10,198,087 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
SHIEL SEXTON COMPANY, INC. | $8,608,685 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
BARTH ELECTRIC CO INC | $5,138,009 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
DEWBERRY ARCHITECTS INC. | $4,282,480 |
The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation.
See details
|
Public Buildings Service | 6/18/2009 |
TENG & ASSOCIATES, INC. | $4,101,196 | Provide architectural and engineering services for ARRA energy and water conservation measures. Work includes meetings, site visits, calculations, reports, drawings and construction estimates. Provide art conservator services for existing wall mural incl | Public Buildings Service | 5/05/2009 |
TECTA AMERICA CORP. | $3,686,000 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
EYP, INC. | $3,131,362 |
ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation.
See details
|
Public Buildings Service | 9/29/2009 |
ERMCO, INC. | $2,719,884 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
JACOBS TECHNOLOGY INC. | $2,686,958 |
Construction Management (Agency) Services for Renovation and Modernizationof the Birch Bayh Federal Building and US Courthouse in Indianapolis, IN Project will provide Construction Management (CM) Services forConstruction, Close Outand Tenant Coordination
This spending item is part of a $3,132,093 allocation.
See details
|
Public Buildings Service | 9/29/2009 |
RYAN FIREPROTECTION INC. | $1,891,295 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
C R General Inc | $1,446,953 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
FINCH CONSTRUCTORS, INC. | $1,376,843 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
GIBSON-LEWIS OF INDIANAPOLIS, LLC | $1,358,142 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
CONNOR & COMPANY, INC. | $1,261,515 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
GILBANE BUILDING COMPANY | $1,208,180 | Construction Management as Agent services during Design of Photovoltaic Roof and DoD Security Requirements/Parking/Common Area Upgrades and during construction of Photovoltaic Roof at the Major Emmett J. Bean Center, Indianapolis , IN 46249 | Public Buildings Service | 12/02/2009 |
RYAN FIREPROTECTION INC. | $1,135,421 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
INTERIOR SPECIALTIES INC | $1,090,663 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
HARMON CONSTRUCTION INCORPORATED | $993,598 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
SSI SERVICES, LLC | $981,857 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
QUANTAPOINT, INC | $787,886 |
The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation.
See details
|
Public Buildings Service | 6/18/2009 |
STAR ENVIRONMENTAL, INC. | $687,735 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Perry Acoustics Inc | $679,083 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
KURRASCH CONSULTING, LLC | $640,084 | Owners Construction Representitive.Kurrasch Consulting, LLC will act as a Consultant to GSA, performing design reviews, attending project meetings,Cost estimate reviews, Schedule reviews, Developement of submittal and testing schedules, Observe mock-ups, | Public Buildings Service | 9/16/2009 |
NORTH MECHANICAL CONTRACTING INC | $577,346 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
PAGE CONSERVATION, INC. | $567,683 | The project award is for conservation treatment of 26 of the 33 historic murals located in the Birch Bayh Federal Building and US Courthouse Indianapolis, IN. Conservation treatment commenced in mid- November 2010. Protection was provided for floors an | Public Buildings Service | 3/31/2010 |
SCHINDLER ELEVATOR CORPORATION | $549,357 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
BROOKS HAYDEN ELECTRICAL COMPANY | $520,113 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
DAVIS & ASSOCIATES, INC. | $480,977 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
Architectural Glass and Metal Co., Inc. | $460,926 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
ATC GROUP SERVICES INC | $445,135 |
Construction Management (Agency) Services for Renovation and Modernizationof the Birch Bayh Federal Building and US Courthouse in Indianapolis, IN Project will provide Construction Management (CM) Services forConstruction, Close Outand Tenant Coordination
This spending item is part of a $3,132,093 allocation.
See details
|
Public Buildings Service | 9/29/2009 |
G.L.S. Inc. | $409,261 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
SHREWSBERRY & ASSOCIATES, LLC | $409,018 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
F.D. LAWRENCE ELECTRIC COMPANY, THE | $404,953 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
BLAKLEY CORPORATION, THE | $402,804 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Bill Lawrence Company Inc | $391,646 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
SANTAROSSA MOSAIC & TILE CO., INC. | $347,009 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Broady-Campbell Inc | $292,541 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Deco Group, Inc | $222,140 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
RTM CONSULTANTS, INC. | $216,460 |
ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation.
See details
|
Public Buildings Service | 9/29/2009 |
Chance Bros. Marble & Tile, Inc. | $211,905 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
C & C SHEET METAL, LLC | $183,229 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
BSA LIFESTRUCTURES INC. | $177,386 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
THOMAS MOORE STUDIOS, INC | $144,425 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
INDIANAPOLIS ELECTRIC COMPANY INCORPORATED | $134,339 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
ABC CUTTING CONTRACTORS INC | $121,329 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
STANLEY SECURITY SOLUTIONS, INC. | $104,160 |
Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation.
See details
|
Public Buildings Service | 3/18/2010 |
Thermal Supply Fire Stop Systems, L.L.C. | $98,129 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Bty, Inc. | $92,229 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
ADT SECURITY SERVICES, INC. | $90,483 | Install security devices in the 5th floor swing space of the Birch Bayl Federal Building and U.S. Courthouse. | Public Buildings Service | 3/19/2010 |
COMMISSIONING AGENTS PUERTO RICO INTERNATIONAL | $78,730 |
Heery International is providing Construction Manager as Agent services for the Federal Bureau of Investigations (FBI) Office Consolidation Project for Construction Management Services for the Master Plan & Garage Design for a new Federal Employee Parking
This spending item is part of a $1,059,077 allocation.
See details
|
Public Buildings Service | 10/23/2009 |
Food Service Consultants Inc | $73,558 |
The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation.
See details
|
Public Buildings Service | 6/18/2009 |
General Steel Fabricating Co Inc | $70,553 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
CENTRAL INDIANA HARDWARE CO., INC. | $67,522 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
CVIJANOVIC, ADAM | $66,120 | Commission for Art in Architecture | Public Buildings Service | 6/30/2011 |
AADCO INC | $66,052 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
PATRIOT ENGINEERING AND ENVIRONMENTAL, INC. | $57,841 |
ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation.
See details
|
Public Buildings Service | 9/29/2009 |
COMMERCIAL DOOR AND HARDWARE, INC. | $57,145 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
ESSENTIAL ARCHITECTURAL SIGNS, INC | $56,519 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
FRANCE SUSTAINABLE SOLUTIONS | $53,333 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
G J BERDING SURVEYING INC | $50,100 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
SCHINDLER ELEVATOR CORPORATION | $49,794 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Chisholm Lumber & Supply Co Inc | $45,500 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
Perry Acoustics Inc | $41,379 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
SCOTT-HILLIARD-KOSENE CONSTRUCTION & DEVELOPMENT SERVICES, INC. | $40,000 |
Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation.
See details
|
Public Buildings Service | 5/05/2009 |
FINK, ROBERTS & PETRIE, INC. | $38,154 |
ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation.
See details
|
Public Buildings Service | 9/29/2009 |
Choice Quality Service LLC | $37,137 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
POTOMAC-HUDSON ENGINEERING, INC. | $37,043 | Environmanal Assessment to identify and address potential onsite and offsite environmental impacts that may be associated with the proposed High Performance Green Moderization Project for the Bean Federal Center. | Public Buildings Service | 8/16/2010 |
ADT SECURITY SERVICES, INC. | $35,378 | Relocate security equipment of the Birch Bayh Federal Building and U.S. Courthouse located in Indianapolis, Indiana. Awarded under the United States Marshals Services (USMS) contract. | Public Buildings Service | 10/27/2010 |
Concrete Connection, Inc | $34,298 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
RYAN FIREPROTECTION INC. | $32,485 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
COMMERCIAL WORKS INC. | $31,818 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
CONSTRUCTION PROCESS SOLUTIONS, LTD | $29,933 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
CIRCLE B CONSTRUCTION SYSTEMS, LLC | $26,150 |
The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation.
See details
|
Public Buildings Service | 5/12/2009 |
ADT SECURITY SERVICES, INC. | $17,474 | Provide security equipment for new United States Marshals Service (USMS) expansion space on fourth floor. | Public Buildings Service | 6/16/2011 |
ADT SECURITY SERVICES, INC. | $16,772 | Provide relocation and installation of equipment to a new area. | Public Buildings Service | 7/11/2011 |
ADT SECURITY SERVICES, INC. | $14,995 | Install entry control security device package. | Public Buildings Service | 3/15/2011 |
Blackmore and Buckner Roofing Inc | $10,177 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
BHS SERVICES, INC. | $10,000 | Incorporate ARRA clauses to perform renovations at Birch Bayh Federal Building in Indianapolis, IN. | Public Buildings Service | 2/23/2010 |
BHS SERVICES, INC. | $10,000 | Incorporate ARRA clauses to perform renovations at Minton Capehart Federal Building in Indianapolis, IN. | Public Buildings Service | 2/23/2010 |
WILSON 5 SERVICE COMPANY, INC. | $9,000 | O&M Contractor to provide Misc. Professional services for ARRA Minton-Cape-hart Federal Building Indianapolis Indiana. FA/Heating ventilation,Air conditioning /Lighting upgrades renovation Project. | Public Buildings Service | 9/23/2010 |
AUGUST MACK ENVIRONMENTAL, INC. | $8,630 |
Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
ADT SECURITY SERVICES, INC. | $8,018 | Relocation and installation of duress buttons. | Public Buildings Service | 9/02/2011 |
ADT SECURITY SERVICES, INC. | $7,744 | Install additional camera duress button and door security at Room 511 of the Birch Bayh Federal Building and U.S. Courthouse in Indianapolis, Indiana. | Public Buildings Service | 10/27/2010 |
BHS SERVICES, INC. | $5,399 | Incorporate ARRA clauses to perform renovations at Bean Federal Building in Indianapolis, IN. | Public Buildings Service | 3/16/2011 |