Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Marion County, Ind., funds by General Services Administration

Listing $124,117,030.57 in stimulus funds from General Services Administration for Marion

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SHIEL SEXTON COMPANY, INC. $32,577,181 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
MESSER CONSTRUCTION CO. $11,879,831 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Sullivan & Poore Inc $10,218,369 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
INDIANAPOLIS ELECTRIC COMPANY INCORPORATED $10,198,087 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
SHIEL SEXTON COMPANY, INC. $8,608,685 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
BARTH ELECTRIC CO INC $5,138,009 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
DEWBERRY ARCHITECTS INC. $4,282,480 The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation. See details
Public Buildings Service 6/18/2009
TENG & ASSOCIATES, INC. $4,101,196 Provide architectural and engineering services for ARRA energy and water conservation measures. Work includes meetings, site visits, calculations, reports, drawings and construction estimates. Provide art conservator services for existing wall mural incl Public Buildings Service 5/05/2009
TECTA AMERICA CORP. $3,686,000 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
EYP, INC. $3,131,362 ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation. See details
Public Buildings Service 9/29/2009
ERMCO, INC. $2,719,884 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
JACOBS TECHNOLOGY INC. $2,686,958 Construction Management (Agency) Services for Renovation and Modernizationof the Birch Bayh Federal Building and US Courthouse in Indianapolis, IN Project will provide Construction Management (CM) Services forConstruction, Close Outand Tenant Coordination
This spending item is part of a $3,132,093 allocation. See details
Public Buildings Service 9/29/2009
RYAN FIREPROTECTION INC. $1,891,295 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
C R General Inc $1,446,953 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
FINCH CONSTRUCTORS, INC. $1,376,843 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
GIBSON-LEWIS OF INDIANAPOLIS, LLC $1,358,142 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
CONNOR & COMPANY, INC. $1,261,515 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
GILBANE BUILDING COMPANY $1,208,180 Construction Management as Agent services during Design of Photovoltaic Roof and DoD Security Requirements/Parking/Common Area Upgrades and during construction of Photovoltaic Roof at the Major Emmett J. Bean Center, Indianapolis , IN 46249 Public Buildings Service 12/02/2009
RYAN FIREPROTECTION INC. $1,135,421 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
INTERIOR SPECIALTIES INC $1,090,663 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
HARMON CONSTRUCTION INCORPORATED $993,598 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
SSI SERVICES, LLC $981,857 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
QUANTAPOINT, INC $787,886 The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation. See details
Public Buildings Service 6/18/2009
STAR ENVIRONMENTAL, INC. $687,735 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Perry Acoustics Inc $679,083 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
KURRASCH CONSULTING, LLC $640,084 Owners Construction Representitive.Kurrasch Consulting, LLC will act as a Consultant to GSA, performing design reviews, attending project meetings,Cost estimate reviews, Schedule reviews, Developement of submittal and testing schedules, Observe mock-ups, Public Buildings Service 9/16/2009
NORTH MECHANICAL CONTRACTING INC $577,346 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
PAGE CONSERVATION, INC. $567,683 The project award is for conservation treatment of 26 of the 33 historic murals located in the Birch Bayh Federal Building and US Courthouse Indianapolis, IN. Conservation treatment commenced in mid- November 2010. Protection was provided for floors an Public Buildings Service 3/31/2010
SCHINDLER ELEVATOR CORPORATION $549,357 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
BROOKS HAYDEN ELECTRICAL COMPANY $520,113 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
DAVIS & ASSOCIATES, INC. $480,977 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
Architectural Glass and Metal Co., Inc. $460,926 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
ATC GROUP SERVICES INC $445,135 Construction Management (Agency) Services for Renovation and Modernizationof the Birch Bayh Federal Building and US Courthouse in Indianapolis, IN Project will provide Construction Management (CM) Services forConstruction, Close Outand Tenant Coordination
This spending item is part of a $3,132,093 allocation. See details
Public Buildings Service 9/29/2009
G.L.S. Inc. $409,261 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
SHREWSBERRY & ASSOCIATES, LLC $409,018 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
F.D. LAWRENCE ELECTRIC COMPANY, THE $404,953 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
BLAKLEY CORPORATION, THE $402,804 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
Bill Lawrence Company Inc $391,646 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
SANTAROSSA MOSAIC & TILE CO., INC. $347,009 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Broady-Campbell Inc $292,541 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Deco Group, Inc $222,140 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
RTM CONSULTANTS, INC. $216,460 ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation. See details
Public Buildings Service 9/29/2009
Chance Bros. Marble & Tile, Inc. $211,905 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
C & C SHEET METAL, LLC $183,229 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
BSA LIFESTRUCTURES INC. $177,386 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
THOMAS MOORE STUDIOS, INC $144,425 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
INDIANAPOLIS ELECTRIC COMPANY INCORPORATED $134,339 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
ABC CUTTING CONTRACTORS INC $121,329 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
STANLEY SECURITY SOLUTIONS, INC. $104,160 Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation. See details
Public Buildings Service 3/18/2010
Thermal Supply Fire Stop Systems, L.L.C. $98,129 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Bty, Inc. $92,229 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
ADT SECURITY SERVICES, INC. $90,483 Install security devices in the 5th floor swing space of the Birch Bayl Federal Building and U.S. Courthouse. Public Buildings Service 3/19/2010
COMMISSIONING AGENTS PUERTO RICO INTERNATIONAL $78,730 Heery International is providing Construction Manager as Agent services for the Federal Bureau of Investigations (FBI) Office Consolidation Project for Construction Management Services for the Master Plan & Garage Design for a new Federal Employee Parking
This spending item is part of a $1,059,077 allocation. See details
Public Buildings Service 10/23/2009
Food Service Consultants Inc $73,558 The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper
This spending item is part of a $7,913,967 allocation. See details
Public Buildings Service 6/18/2009
General Steel Fabricating Co Inc $70,553 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
CENTRAL INDIANA HARDWARE CO., INC. $67,522 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
CVIJANOVIC, ADAM $66,120 Commission for Art in Architecture Public Buildings Service 6/30/2011
AADCO INC $66,052 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
PATRIOT ENGINEERING AND ENVIRONMENTAL, INC. $57,841 ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation. See details
Public Buildings Service 9/29/2009
COMMERCIAL DOOR AND HARDWARE, INC. $57,145 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
ESSENTIAL ARCHITECTURAL SIGNS, INC $56,519 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
FRANCE SUSTAINABLE SOLUTIONS $53,333 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
G J BERDING SURVEYING INC $50,100 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
SCHINDLER ELEVATOR CORPORATION $49,794 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Chisholm Lumber & Supply Co Inc $45,500 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
Perry Acoustics Inc $41,379 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
SCOTT-HILLIARD-KOSENE CONSTRUCTION & DEVELOPMENT SERVICES, INC. $40,000 Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse.
This spending item is part of a $66,172,778 allocation. See details
Public Buildings Service 5/05/2009
FINK, ROBERTS & PETRIE, INC. $38,154 ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN.
This spending item is part of a $3,832,356 allocation. See details
Public Buildings Service 9/29/2009
Choice Quality Service LLC $37,137 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
POTOMAC-HUDSON ENGINEERING, INC. $37,043 Environmanal Assessment to identify and address potential onsite and offsite environmental impacts that may be associated with the proposed High Performance Green Moderization Project for the Bean Federal Center. Public Buildings Service 8/16/2010
ADT SECURITY SERVICES, INC. $35,378 Relocate security equipment of the Birch Bayh Federal Building and U.S. Courthouse located in Indianapolis, Indiana. Awarded under the United States Marshals Services (USMS) contract. Public Buildings Service 10/27/2010
Concrete Connection, Inc $34,298 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
RYAN FIREPROTECTION INC. $32,485 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
COMMERCIAL WORKS INC. $31,818 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
CONSTRUCTION PROCESS SOLUTIONS, LTD $29,933 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
CIRCLE B CONSTRUCTION SYSTEMS, LLC $26,150 The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In
This spending item is part of a $44,698,067 allocation. See details
Public Buildings Service 5/12/2009
ADT SECURITY SERVICES, INC. $17,474 Provide security equipment for new United States Marshals Service (USMS) expansion space on fourth floor. Public Buildings Service 6/16/2011
ADT SECURITY SERVICES, INC. $16,772 Provide relocation and installation of equipment to a new area. Public Buildings Service 7/11/2011
ADT SECURITY SERVICES, INC. $14,995 Install entry control security device package. Public Buildings Service 3/15/2011
Blackmore and Buckner Roofing Inc $10,177 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
BHS SERVICES, INC. $10,000 Incorporate ARRA clauses to perform renovations at Birch Bayh Federal Building in Indianapolis, IN. Public Buildings Service 2/23/2010
BHS SERVICES, INC. $10,000 Incorporate ARRA clauses to perform renovations at Minton Capehart Federal Building in Indianapolis, IN. Public Buildings Service 2/23/2010
WILSON 5 SERVICE COMPANY, INC. $9,000 O&M Contractor to provide Misc. Professional services for ARRA Minton-Cape-hart Federal Building Indianapolis Indiana. FA/Heating ventilation,Air conditioning /Lighting upgrades renovation Project. Public Buildings Service 9/23/2010
AUGUST MACK ENVIRONMENTAL, INC. $8,630 Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN
This spending item is part of a $24,029,232 allocation. See details
Public Buildings Service 11/13/2009
ADT SECURITY SERVICES, INC. $8,018 Relocation and installation of duress buttons. Public Buildings Service 9/02/2011
ADT SECURITY SERVICES, INC. $7,744 Install additional camera duress button and door security at Room 511 of the Birch Bayh Federal Building and U.S. Courthouse in Indianapolis, Indiana. Public Buildings Service 10/27/2010
BHS SERVICES, INC. $5,399 Incorporate ARRA clauses to perform renovations at Bean Federal Building in Indianapolis, IN. Public Buildings Service 3/16/2011