St. Joseph County, Ind., funds by General Services Administration
Listing $2,751,322.00 in stimulus funds from General Services Administration for St. Joseph
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
WHITE, EDWARD J INC | $2,187,651 |
The main objective of the project is to provide a controlled high quality indoor environment that is acceptable to the occupants using the space while increasing the energy efficiency of the building. For this project the issues that will be addressed in
This spending item is part of a $2,554,109 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
GRAYCOR CONSTRUCTION COMPANY INC. | $237,679 |
The main objective of the project is to provide a controlled high quality indoor environment that is acceptable to the occupants using the space while increasing the energy efficiency of the building. For this project the issues that will be addressed in
This spending item is part of a $2,554,109 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
GHAFARI ASSOCIATES, L.L.C. | $195,213 | The work is the preparation of drawings and specification for the in place abandonment of the existing steam perimeter system heating and piping system and the installation of new variable air volume (VAV) units. The variable air volume units will include | Public Buildings Service | 3/31/2010 |
Koontz-Wagner Holdings LLC | $128,780 |
The main objective of the project is to provide a controlled high quality indoor environment that is acceptable to the occupants using the space while increasing the energy efficiency of the building. For this project the issues that will be addressed in
This spending item is part of a $2,554,109 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
CONSERVATION OF SCULPTURE AND OBJECTS STUDIO INC | $2,000 | Project completed. Repairs of holes in marble wall in South Bend Federal Courthouse guard station. | Public Buildings Service | 9/13/2011 |