Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Black Hawk County, Iowa, funds by Transportation, Department of

Listing $10,626,132.72 in stimulus funds from Transportation, Department of for Black Hawk

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
WATERLOO, CITY OF $3,590,000 Airport Improvement Program Airport Development - Rehabilitate Runway 18-36 (Phase 2). The award funds rehabilitation of the southern portion of Runway 18-36 at the Waterloo Regional Airport, Waterloo, Iowa. The rehabilitation activities consists of removing the top 4 inches of th Federal Aviation Administration 5/28/2009
METROPOLITAN TRANSIT AUTHORITY OF BLACK HAWK CO $1,642,414 Federal Transit_Formula Grants Investment in public transportation: Funding is provided for transit capital improvements for transit agencies in Iowa urbanized areas with population between 50,000 and 200,000
This spending item is part of a $10,689,659 allocation. See details
Federal Transit Administration 6/10/2009
WATERLOO, CITY OF $1,517,000 Highway Planning and Construction This project will provide an improved driving surface by applying a hot-mix asphalt overlay on four sections of roadway within the City of Waterloo totalling 1.93 miles: Broadway Street from Donald Street to Burton Avenue Broadway Street from Park Road t Federal Highway Administration 3/26/2009
TRANSPORTATION, IOWA DEPT OF $778,935 Highway Planning and Construction This project will improve the driving surface and extend the life of the pavement by milling the existing surface and then applying a hot mix asphalt overlay on approximately 2.8 miles of County Route V49 from the City of Gilbertville to Dubuque Road in B Federal Highway Administration 4/15/2009
City of Raymond $700,000 Highway Planning and Construction This project will improve the driving surface by milling the existing surface and then applying a hot-mix asphalt overlay on approximately 1.1 miles of County Route D-22/ Dubuque Road from the west to the east city limits of the City of Raymond.
This spending item is part of a $750,000 allocation. See details
Federal Highway Administration 5/11/2009
CEDAR FALLS, CITY OF (INC) $700,000 Highway Planning and Construction This project consists of replacing the pavement of multiple roadways in Cedar Falls Iowa: State Street from East 2nd Street to East 4th Street East 2nd Street from Main Street to State Street and East 4th Street from State Street to East Dead End Each Federal Highway Administration 8/17/2009
IOWA NORTHLAND REGIONAL COUNCIL OF GOVERNMENTS $517,746 Formula Grants for Other Than Urbanized Areas Supprt of public transportation: Funding is provided for transit capital improvements in non-urbanized areas throughout Iowa
This spending item is part of a $15,156,406 allocation. See details
Federal Transit Administration 3/05/2009
WATERLOO, CITY OF $484,867 Highway Planning and Construction This project provides for construction of a bicycle and pedestrian trail on the south bank of the Cedar River from West 6th Street to West 18th Street in the city of Waterloo in Blackhawk County. This Trail serves as an alternative mode of transportation Federal Highway Administration 11/17/2009
METROPOLITAN TRANSIT AUTHORITY OF BLACK HAWK CO $343,732 Federal Transit_Formula Grants Investment in public transportation: Funding is provided for transit capital improvements for transit agencies in Iowa urbanized areas with population between 50,000 and 200,000
This spending item is part of a $10,689,659 allocation. See details
Federal Transit Administration 6/10/2009
CEDAR FALLS, CITY OF (INC) $207,500 Highway Planning and Construction This two phase Trail widening and resurfacing project is located along the North and South sides of the Cedar River in the city of Cedar Falls in Blackhawk County. Phase I North Riverside Trail runs along the North side of the Cedar River and along Pa Federal Highway Administration 8/18/2009
WATERLOO, CITY OF $93,939 Airport Improvement Program Airport Development - Improve Terminal Building (Passenger Boarding Bridge - Ground Power Unit). The award funds the procurement and installation of a 400 Hz Ground Power Unit (GPU) to be mounted on the existing aircraft boarding bridge at the Waterloo R Federal Aviation Administration 7/13/2009
City of Raymond $50,000 Highway Planning and Construction This project will improve the driving surface by milling the existing surface and then applying a hot-mix asphalt overlay on approximately 1.1 miles of County Route D-22/ Dubuque Road from the west to the east city limits of the City of Raymond.
This spending item is part of a $750,000 allocation. See details
Federal Highway Administration 5/11/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction This project provides for construction of a bicycle and pedestrian trail on the south bank of the Cedar River from West 6th Street to West 18th Street in the city of Waterloo in Blackhawk County. This Trail serves as an alternative mode of transportation
This spending item is part of a $484,867 allocation. See details
Federal Highway Administration 11/17/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction This project will provide an improved driving surface by applying a hot-mix asphalt overlay on four sections of roadway within the City of Waterloo totalling 1.93 miles: Broadway Street from Donald Street to Burton Avenue Broadway Street from Park Road t
This spending item is part of a $1,517,000 allocation. See details
Federal Highway Administration 3/26/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction This project will improve the driving surface by milling the existing surface and then applying a hot-mix asphalt overlay on approximately 1.1 miles of County Route D-22/ Dubuque Road from the west to the east city limits of the City of Raymond.
This spending item is part of a $750,000 allocation. See details
Federal Highway Administration 5/11/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction This two phase Trail widening and resurfacing project is located along the North and South sides of the Cedar River in the city of Cedar Falls in Blackhawk County. Phase I North Riverside Trail runs along the North side of the Cedar River and along Pa
This spending item is part of a $207,500 allocation. See details
Federal Highway Administration 8/18/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction This project consists of replacing the pavement of multiple roadways in Cedar Falls Iowa: State Street from East 2nd Street to East 4th Street East 2nd Street from Main Street to State Street and East 4th Street from State Street to East Dead End Each
This spending item is part of a $700,000 allocation. See details
Federal Highway Administration 8/17/2009