Riley County, Kan., funds by Army, Department of
Listing $1,871,068.44 in stimulus funds from Army, Department of for Riley
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CBS MANHATTAN LLC | $598,850 |
RECOVERY FUNDS; Student Dormitory (200 Room) at Goodfellow AFB, San Angelo, TX; Multi-story with brick veneer and prefinished standing seam metal roof system. The design includes 200 modules (two students per room) with a shared shower/toilet room, laundr
This spending item is part of a $23,743,643 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/24/2009 |
TRINIUM, INC. | $465,721 |
The general scope of work includes, but is not limited to: The renovation of Building 216 into a new Judicial Center with Courtroom, required JAG offices, and support spaces. This will include: - Complete building survey and verification of existing build
This spending item is part of a $9,441,593 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/12/2010 |
AYARS & AYARS, INCORPORATED | $233,885 | As part of construction on Tuttle Creek Dam Project provide one (1) full time Engineering Technician and one (1) full time QAR to the Resident Engineer (RE) and Project Engineer (PE). | U.S. Army Corps of Engineers, except civil program financing | 10/09/2009 |
Reid Plumbing, Heating & A/C, Inc | $193,323 |
The general scope of work includes, but is not limited to: The renovation of Building 216 into a new Judicial Center with Courtroom, required JAG offices, and support spaces. This will include: - Complete building survey and verification of existing build
This spending item is part of a $9,441,593 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/12/2010 |
DESIGNER CONSTRUCTION, INC. | $179,252 |
The general scope of work includes, but is not limited to: The renovation of Building 216 into a new Judicial Center with Courtroom, required JAG offices, and support spaces. This will include: - Complete building survey and verification of existing build
This spending item is part of a $9,441,593 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/12/2010 |
LARSON CONSTRUCTION, INC. | $77,515 |
As part of construction on the GIMFE Repair Replace Failed Water Well Project, the project consists of the digging and casing of one well point producing approximately 1,000 gallons of fresh water per minute. The casing and well pump will be enclosed in
This spending item is part of a $1,020,671 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 11/04/2009 |
BUILT-SO-WELL | $50,064 |
The general scope of work includes, but is not limited to: The renovation of Building 216 into a new Judicial Center with Courtroom, required JAG offices, and support spaces. This will include: - Complete building survey and verification of existing build
This spending item is part of a $9,441,593 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 2/12/2010 |
BPW Masonry Inc | $36,100 |
As part of construction on the GIMFE Repair Replace Failed Water Well Project, the project consists of the digging and casing of one well point producing approximately 1,000 gallons of fresh water per minute. The casing and well pump will be enclosed in
This spending item is part of a $1,020,671 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 11/04/2009 |
CENTRAL MECHANICAL CONSTRUCTION CO., INC. | $26,200 |
As part of construction on the GIMFE Repair Replace Failed Water Well Project, the project consists of the digging and casing of one well point producing approximately 1,000 gallons of fresh water per minute. The casing and well pump will be enclosed in
This spending item is part of a $1,020,671 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 11/04/2009 |
SUPERIOR ROOFING, M & M, INC | $10,160 |
As part of construction on the GIMFE Repair Replace Failed Water Well Project, the project consists of the digging and casing of one well point producing approximately 1,000 gallons of fresh water per minute. The casing and well pump will be enclosed in
This spending item is part of a $1,020,671 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 11/04/2009 |