Montgomery County, Md., funds by Commerce, Department of
Listing $163,613,541.48 in stimulus funds from Commerce, Department of for Montgomery
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JOHN C. GRIMBERG CO., INC. | $15,787,222 |
CONSTRUCT NEW NATIONAL STRUCTURAL FIRE RESISTANCE LABORATORY / BUILDING 205 EXPANSION, AT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. GAITHERSBURG, MD.
This spending item is part of a $24,684,000 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
J. & L. MAVILIA INCORPORATED | $12,297,695 | Repair / Refurbishment of Air Handling Units at the National Institute of Standards and Technology | National Institute of Standards and Technology | 8/09/2010 |
Jack Morton Worldwide Inc. | $10,995,036 |
The 2010 Census Road Tour is a special event that brings Census activities in the field to the local and national level.It is envisioned that the 2010 Road Tour will be a rolling public relations tour consisting of thirteen (13) vehicles, made in the USA,
This spending item is part of a $14,850,129 allocation.
See details
|
Bureau of the Census | 9/24/2009 |
SEI GROUP, INC. | $8,330,395 | The National Institute of Standards and Technology (NIST) Center for Neutron Research uses helium as part of its processes to cool neutrons, enhancing opportunities for their study. This is a Design-Build task to design, procure and install a helium reco | National Institute of Standards and Technology | 9/23/2010 |
Jack Morton Worldwide Inc. | $7,291,290 |
Partnership Support Program
This spending item is part of a $8,328,100 allocation.
See details
|
Bureau of the Census | 9/18/2009 |
GRIMBERG/AMATEA JV | $7,267,778 |
CONSTRUCT NEW NATIONAL STRUCTURAL FIRE RESISTANCE LABORATORY / BUILDING 205 EXPANSION, AT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. GAITHERSBURG, MD.
This spending item is part of a $24,684,000 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
MILESTONE CONSTRUCTION SERVICES, INC. | $6,262,900 | Building 318 is new construction of an Emergency Services facility located on the NIST campus in Gaithersburg, MD. | National Institute of Standards and Technology | 7/21/2010 |
L&M CONSTRUCTION, INC. | $6,012,497 | Sitewide Fume Hood Replacement at The National Institute of Standards and Technology | National Institute of Standards and Technology | 8/18/2010 |
JOHN C. GRIMBERG CO., INC. | $5,766,064 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
MILESTONE CONSTRUCTION SERVICES, INC. | $5,722,892 | Construction of an addition to an existing warehouse located at building 301 Logistics at the NIST Campus in Gaithersburg, Maryland. | National Institute of Standards and Technology | 7/26/2010 |
G2, INC. | $4,792,241 | Analysis of Vulnerabilities, Development of Configurations, Development and maintenance of SCAP Content, the Development of Protocols and Specifications, and Maintenance of National Vulnerability Database Portal. | National Institute of Standards and Technology | 1/01/2010 |
SEI GROUP, INC. | $3,915,491 |
Construction Services for the helium recovery and reliquefaction system, at the NIST Gaithersburg, MD Campus.
This spending item is part of a $8,330,395 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
WORLD WIDE TECHNOLOGY, INC. | $3,450,626 |
Contract will provide CISCO brand name only hardware and components per the line items in the contractand to be delivered to the Department of Commerce/National Institute of Standards and Technology, Gaithersburg, Maryland and Boulder, Colorado sites. The
This spending item is part of a $3,482,214 allocation.
See details
|
National Institute of Standards and Technology | 9/22/2009 |
JACOBS TECHNOLOGY INC. | $2,803,116 | Construction Management of National Institute of Standards and Technology (NIST) Enhanced Construction Program of 2009. This Program is a Call order to plan, schedule, coordinate, and assure effective performance design and construction services for seven | National Institute of Standards and Technology | 9/21/2009 |
JOHN E. KELLY & SONS ELECTRICAL CONSTRUCTION, INC. | $2,620,000 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
OAK MANAGEMENT, INC. | $2,604,700 |
The objective of this task order is for the Contractor to provide program/project management, acquisition management, technical, contractual, financial and administrative services for the FSV6 Fisheries Survey Vesel acquisition program
This spending item is part of a $3,595,000 allocation.
See details
|
National Oceanic and Atmospheric Administration | 6/10/2010 |
YOUR RECRUITING COMPANY, INC. | $2,434,158 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $2,689,546 allocation.
See details
|
National Institute of Standards and Technology | 9/10/2009 |
DMS HEALTH TECHNOLOGIES, INC. | $2,403,360 | Renovation of PET/CT Suite. Installation and sale of PET/CT to NIST | National Institute of Standards and Technology | 4/14/2010 |
ENTERPRISE INFORMATION SOLUTIONS, INC. | $1,896,700 | on site cartographic services | National Oceanic and Atmospheric Administration | 7/30/2009 |
I.M. SYSTEMS GROUP, INC. | $1,885,546 | Environmental Support Services for the Office of Conservation Restoration Center, Silver Spriing, Md. | National Oceanic and Atmospheric Administration | 6/18/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $1,881,542 | Awarded contract shall conduct following 7 tasks: Task 1 - Software Requirements Document: The Government will provide the contractor with current procedural documents for existing software applications. The contractor shall review the documents and speak | National Oceanic and Atmospheric Administration | 9/14/2009 |
MACARTHUR & BAKER INTERNATIONAL, INC | $1,639,792 | MacArthur & Baker International, Inc. was contracted to help NIST Risk Management and Audit Team performed the following activities: Develop a NIST ARRA program-related risk management framework that effectively minimizes the risk of fraud, waste, and abu | National Institute of Standards and Technology | 8/14/2009 |
SYSTALEX CORPORATION | $1,606,706 | NOAA FINANCE OFFICE IT SUPPORT SERVICES | National Oceanic and Atmospheric Administration | 8/03/2010 |
Contracting Engineering Consultants, Inc. | $1,469,000 |
CONSTRUCT NEW NATIONAL STRUCTURAL FIRE RESISTANCE LABORATORY / BUILDING 205 EXPANSION, AT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. GAITHERSBURG, MD.
This spending item is part of a $24,684,000 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
I.M. SYSTEMS GROUP, INC. | $1,437,911 | Providing technical and professional support services in support of the 50 NOAA NMFS American Recovery and Reinvestment Act (ARRA) projects. The ARRA projects will restore wetlands, salt marsh, oyster and coral reefs, as well as remove fish passage barrie | National Oceanic and Atmospheric Administration | 7/15/2009 |
THERRIEN WADDELL, INC. | $1,405,608 |
Construction of a Net Zero Energy Test Facility
This spending item is part of a $2,590,110 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
MEMC ELECTRONIC MATERIALS, INC | $1,398,531 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
LEGATUS6 LLC | $1,349,158 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
L&M CONSTRUCTION, INC. | $1,285,235 | Installation of 50 Network Closets at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/21/2010 |
DELOITTE CONSULTING LLP | $1,276,736 | The purpose of this award is to acquire project management, facility implementation expertise and support services for the Climate Computing and Modeling Program for the National Oceanic and Atmospheric Administration (NOAA). | National Oceanic and Atmospheric Administration | 5/27/2010 |
MICROTECH COMPUTERS, INC. | $1,266,607 | A turn-key solution for upgrade of multiple linux clusters at NIST using latest Xeon processors technology and fast infiniband interconnect. | National Institute of Standards and Technology | 9/23/2010 |
YOUR RECRUITING COMPANY, INC. | $1,255,452 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $1,399,959 allocation.
See details
|
National Institute of Standards and Technology | 9/21/2010 |
S&T SERVICES, LLC | $1,248,529 | Provide Grant Administration Guidance and Support to Program Officers, Recipients, and Others as needed specifically for the Broadband Technology Opportunity Program of the National Telecommunications and Information Administration in Silver Spring, MD | National Oceanic and Atmospheric Administration | 12/09/2009 |
BISCAYNE CONTRACTORS, INC. | $1,090,824 |
Renovation to the NIST Robotics lab.
This spending item is part of a $2,236,124 allocation.
See details
|
National Institute of Standards and Technology | 7/12/2010 |
UNIVERSAL BUSINESS SOLUTIONS LLC | $1,058,229 | Replacement of Light Fixtures and Installation of Occupancy Sensors | National Institute of Standards and Technology | 8/09/2010 |
NIKA TECHNOLOGIES, INC. | $956,350 | AE services to design the high-efficiency pumping system and site infrastructure projects - building 235 NCNR expansion at the NIST Gaithersburg Md campus. | National Institute of Standards and Technology | 9/16/2009 |
S&T SERVICES, LLC | $918,401 | Provide Grant Administration Guidance and Support to Program Officers, Recipients, and Others as needed specifically for the Broadband Technology Opportunity Program of the National Telecommunications and Information Administration in Silver Spring, MD | National Oceanic and Atmospheric Administration | 9/20/2010 |
WESTAT, INC. | $880,618 | Two research stands comprise this evaluation: An Institutional study and an Associate study. The Institutional study will assess the benefits that accrue to NIST organizationally as a result of offering and operating RAP; for example, attracting high qual | National Institute of Standards and Technology | 3/12/2010 |
XL ASSOCIATES, INC. | $802,560 | The contractor shall provide 5 Grants Specialist Support personnel. One of the five will be considered as lead. NIST requires support in all aspects of the discretionary grants and agreements process, including but not limited to pre-award, award, adminis | National Institute of Standards and Technology | 1/11/2010 |
BOOZ ALLEN HAMILTON INC. | $784,153 |
Booz Allen shall provide Project Management, Outreach Method and Material, and Program and Project Support for NIST's Health IT Portfolio.
This spending item is part of a $949,781 allocation.
See details
|
National Institute of Standards and Technology | 6/15/2010 |
JOHN E. KELLY & SONS ELECTRICAL CONSTRUCTION, INC. | $674,610 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
RED RIVER COMPUTER CO., INC. | $670,568 | CISCO Hardware and Software Maintenance to the NIST Gaithersburg, MD. | National Institute of Standards and Technology | 9/01/2010 |
WORLD WIDE TECHNOLOGY, INC. | $658,358 | Cisco SMARtTnet Hardware and Software Maintenance Services 8x5 for NIST- owned Cisco devices | National Institute of Standards and Technology | 7/30/2009 |
COLEMAN TECHNOLOGIES, INC. | $647,869 | Cisco SMARTnet Hardware and Software Maintenance services, 8 hours per day, 5 days per week for NIST-owned Cisco devices located at the Department of Commerce/National Institute of Standards and Technology, Gaithersburg, Maryland. | National Institute of Standards and Technology | 9/22/2009 |
PROTEKPARK, INC. | $608,207 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
COLIMORE THOEMKE ARCHITECTS, INC. | $590,679 |
A/E design services for the National Structural Fire Resistance Laboratory Addition to Building 205. On the NIST Gaithersburg Campus
This spending item is part of a $1,353,502 allocation.
See details
|
National Institute of Standards and Technology | 7/31/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $586,466 | Data Configuration, Data Loading, Data Management, Data Ingestion, and Data Verification; Data Ingestion, Verification, and Product Generation; Data Processing, Analysis and Assessment | National Oceanic and Atmospheric Administration | 6/16/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $586,466 | Water Level Processing and Tidal Zoning Support to include: Data configuration, Data loading, Data Management, Data Ingestion, and Data Verification and Product Generation. | National Oceanic and Atmospheric Administration | 6/16/2009 |
S&T SERVICES, LLC | $552,360 | Contract Specialist and Acquisition Support Services for Silver Spring, MD | National Oceanic and Atmospheric Administration | 9/10/2009 |
LOCUST LANE FARMS, INC. | $535,058 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
EXETER GOVERNMENT SERVICES, LLC | $502,644 |
Provision of labor, materials and equipment necessary to develop a platform independent, self-contained, standalone HIPAA Security Rule toolkit application with an electronic user manual.
This spending item is part of a $718,644 allocation.
See details
|
National Institute of Standards and Technology | 1/31/2011 |
HYPERTEK INC | $494,940 |
The award is to assist NIST sustain the accelerated development of the hundreds of compatible standards that will be required to build a secure, interoperable smart electric power grid. EnerNex is required to establish and administer a Smart Grid Interope
This spending item is part of a $9,999,969 allocation.
See details
|
National Institute of Standards and Technology | 8/19/2009 |
WHALEN, ROBERT CO INC | $487,000 |
Renovation to the NIST Robotics lab.
This spending item is part of a $2,236,124 allocation.
See details
|
National Institute of Standards and Technology | 7/12/2010 |
SYSTALEX CORPORATION | $480,032 | NOAA FINANCIAL SYSTEMS DIVISION SUPPORT | National Oceanic and Atmospheric Administration | 7/31/2009 |
XL ASSOCIATES, INC. | $443,000 | The contractor shall provide 2 Grants Specialist Support personnel. NIST requires support in all aspects of the discretionary grants and agreements process, including but not limited to pre-award, award, administration and closeout. Duties include, but n | National Institute of Standards and Technology | 5/27/2010 |
JACOBS TECHNOLOGY INC. | $435,420 | Jacobs provides CM services as the owner's agent to support the Department of Commerce's National Institute of Standards and Technology (NIST) ARRA Construction Grants Program. These ARRA funded grants have already been awarded to public and private educa | National Institute of Standards and Technology | 3/04/2010 |
L&M CONSTRUCTION, INC. | $412,265 | Building 222, 223 & 225 - IDIQ Lab Fit Ups - Task 1 | National Institute of Standards and Technology | 7/15/2010 |
BOOZ ALLEN HAMILTON INC. | $399,976 | Booz Allen will assist NIST in the development of the HHS Health IT Certification Program. Support includes developing a test method framework, a certification program process document, and related project planning and tracking tools. | National Institute of Standards and Technology | 1/21/2010 |
Jack Morton Worldwide Inc. | $392,207 |
Program Management and Travel - This Task Order covers labor and travel services from DraftFCB and their partner agencies that provide support for all the deliverables required by the scopes of work (i.e., technical proposals) for Task Orders 21-24. Draft
This spending item is part of a $7,781,380 allocation.
See details
|
Bureau of the Census | 8/18/2009 |
CLIFTON GUNDERSON LLP | $388,545 | Provide risk management and auditing support services for ARRA project activities | National Oceanic and Atmospheric Administration | 4/19/2010 |
CAPITOL POWER INC | $382,523 |
Provide, deliver, rig into place, start-up, optimize and perform project closeout for six UPS as follows: 0001 Bldg 222 Room B251 100kVA UPS 0002 Bldg 222 Room B215 80kVA UPS 0003 Bldg 225 Room A368/B367 80kVA UPS 0004 Bldg 223 Room B340-B342 80kVA UPS 00
This spending item is part of a $402,163 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2009 |
S&T SERVICES, LLC | $379,919 | Non-Personal service requirement for acquisition support services to support NOAA's acquisition and financial assistance activities associated with the American Recovery and Reinvestment Act | National Oceanic and Atmospheric Administration | 3/18/2010 |
I.M. SYSTEMS GROUP, INC. | $375,199 | Grants on Line e-review module for the National Oceanic Atmospheric Administration (NOAA) | National Oceanic and Atmospheric Administration | 9/14/2010 |
MERCOM, INCORPORATED | $364,000 | The objective of thie project if for Mercom to provide labor, materials, and IT products to support the NIST network infrastucture. Mercom installs and provides logistics managment of the nely purchased materials, installs UPS devices, installs all of th | National Institute of Standards and Technology | 9/18/2009 |
S&T SERVICES, LLC | $349,906 | Training Services for Recovery Act reporting to NOAA AGO offices nationwide | National Oceanic and Atmospheric Administration | 9/03/2009 |
WILSON COMPANY, INC., ENGINEERS & ARCHITECTS | $340,401 | Shoreline mapping. | National Oceanic and Atmospheric Administration | 7/08/2009 |
METRIX ENTERPRISE SOLUTIONS INC. | $298,974 | Health IT Query Retrieve Test Tool Migration | National Institute of Standards and Technology | 9/30/2010 |
METRIX ENTERPRISE SOLUTIONS INC. | $298,974 | Query Retrieve Test Tool | National Institute of Standards and Technology | 9/29/2010 |
DATA SOLUTIONS & TECHNOLOGY (DST), INC. | $285,986 | Provide scientific support to develop and improve the accuracy of the Vertical Datuum transformation tool (VDatuum) and related integrated ocean and coastal mapping efforts for the National Geodetic Survey of National Oceanic and Atmospheric Administratio | National Oceanic and Atmospheric Administration | 8/18/2009 |
L&M CONSTRUCTION, INC. | $278,075 | Building 215, Lab A105 - Lab Renovations at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/20/2010 |
L&M CONSTRUCTION, INC. | $267,815 | Building 224; Rooms A330-A332 - Installation of a Photovoltaic Facility at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/21/2010 |
COLIMORE ARCHITECTS, INC. | $260,446 |
A/E design services for the Consolidated Emergency Services Facility Building 318. On the NIST Gaithersburg Campus
This spending item is part of a $557,754 allocation.
See details
|
National Institute of Standards and Technology | 9/18/2009 |
NIKA TECHNOLOGIES, INC. | $260,246 | Post construction award services for high - efficiency pumping system and site infrastructure projects - building 235 NCNR Expansion at the NIST Gaithersburg Md campus. Modification added to this delivery order. | National Institute of Standards and Technology | 9/16/2009 |
GRIMBERG/AMATEA JV | $254,703 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $254,018 | Provide support to the NOAA Acquisition and Grants Office ARRA Program Management Division in the areas of program and project database management to comply with all oversight, tracking and reporting requirements of the ARRA as well as any analytical acti | National Oceanic and Atmospheric Administration | 7/22/2009 |
K DUNCAN & COMPANY, LLC | $249,920 | Technical expertise and consultation on specified areas of ARRA | National Institute of Standards and Technology | 9/23/2010 |
Dynatemp, Inc. | $236,000 |
Construction of a Net Zero Energy Test Facility
This spending item is part of a $2,590,110 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
GLOBAL ENGINEERING SOLUTIONS, INC. | $230,236 | NIST has an existing solar array on the NIST campus. The scope of this project is to either expand its operation or install independent systems elsewhere on campus, or both. NIST will have the aid of a researcher, subject matter expert, to help with the | National Institute of Standards and Technology | 9/22/2009 |
NIKA TECHNOLOGIES, INC. | $229,914 | Technical Engineering services for construction management. | National Institute of Standards and Technology | 9/01/2010 |
Day Holdings, Inc. | $227,240 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
ADM Concrete Construction, Inc. | $225,643 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $222,000 | Monitored Barrow staff employees move-in to Barrow Housing. Prepared article celebrating construction of the new staff housing which posed numerous challenges, including the need to build on 25-foot piles driven 20 feet into the frozen tundra. Describe | National Oceanic and Atmospheric Administration | 12/23/2009 |
S&T SERVICES, LLC | $199,742 | Acquisition Support Services to cover the entire range of acquisition activities from acquisition planning to contract close out | National Oceanic and Atmospheric Administration | 8/18/2009 |
RCS, LLC | $198,020 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
L&M CONSTRUCTION, INC. | $195,126 | Building 302 & 215 - Installation of Milling Machine and Lathes at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/21/2010 |
ROBERT'S WELDING, LLC | $192,000 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
AUTOMATED PRECISION INC. | $181,193 |
Nikon Metrology has been contracted to provide to NIST an iSpace system with peripherals, including an MCA II articulating arm, portable K-600 optical CMM, MMD200 handheld scanner, and API 6DOF laser tracker.
This spending item is part of a $1,397,647 allocation.
See details
|
National Institute of Standards and Technology | 9/22/2010 |
COLIMORE ARCHITECTS, INC. | $180,918 |
A/E design services for the Logistics Facility on the NIST Gaithersburg Campus
This spending item is part of a $460,737 allocation.
See details
|
National Institute of Standards and Technology | 9/19/2009 |
MCHENRY, INC., CLYDE | $178,603 |
Replacement of windows in Buildings 202,205,230,231,237, 301,302,304 and 309 at NIST Gaithersburg, MD
This spending item is part of a $547,542 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2010 |
ADVANCED COMPUTER CONCEPTS, INC. | $175,029 | Sun IT sales and services | National Oceanic and Atmospheric Administration | 9/08/2010 |
KPMG L.L.P. | $170,091 | Additional audit services required for the Contractor to perform relating to ARRA, which were not in the original scope of work under the contract. | Office of the Secretary | 9/23/2009 |
SCHNABEL FOUNDATION COMPANY INC | $160,000 |
CONSTRUCT NEW NATIONAL STRUCTURAL FIRE RESISTANCE LABORATORY / BUILDING 205 EXPANSION, AT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. GAITHERSBURG, MD.
This spending item is part of a $24,684,000 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
TKC INTEGRATION SERVICES, LLC | $159,607 | Oracle licenses for NOAA Finance Office | National Oceanic and Atmospheric Administration | 9/03/2010 |
DAKOTA CONSULTING INCORPORATED | $151,204 | The Health IT Transactional Testing project of the Software and Systems Division (SSD) of the National Institute of Standards and Technology (NIST) has a number of activities that require the development of software that will be used to generate test case | National Institute of Standards and Technology | 4/20/2012 |
AUTUMN CONTRACTING, INC. | $140,000 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
BUSY DITCH, INC. | $137,000 |
Renovation to the NIST Robotics lab.
This spending item is part of a $2,236,124 allocation.
See details
|
National Institute of Standards and Technology | 7/12/2010 |
ALEXANDER, SALINA C | $135,500 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $2,689,546 allocation.
See details
|
National Institute of Standards and Technology | 9/10/2009 |
L&M CONSTRUCTION, INC. | $135,315 | Building 216, Lab D101 - Lab Renovations at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/21/2010 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $125,017 |
A/E design services for the Consolidated Emergency Services Facility Building 318. On the NIST Gaithersburg Campus
This spending item is part of a $557,754 allocation.
See details
|
National Institute of Standards and Technology | 9/18/2009 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $124,740 |
A/E design services for the National Structural Fire Resistance Laboratory Addition to Building 205. On the NIST Gaithersburg Campus
This spending item is part of a $1,353,502 allocation.
See details
|
National Institute of Standards and Technology | 7/31/2009 |
KT CONSULTING, INC. | $122,750 | HEALTH IT PROGRAMMING | National Institute of Standards and Technology | 1/12/2011 |
KT CONSULTING, INC. | $122,750 | Health IT patient matching test tool | National Institute of Standards and Technology | 1/12/2011 |
KT CONSULTING, INC. | $122,750 | HEALTH IT PROGRAMMING | National Institute of Standards and Technology | 1/12/2011 |
NIKA TECHNOLOGIES, INC. | $119,914 | Technical Engineering services for construction management. | National Institute of Standards and Technology | 1/08/2010 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $119,795 |
A/E design services for the Logistics Facility on the NIST Gaithersburg Campus
This spending item is part of a $460,737 allocation.
See details
|
National Institute of Standards and Technology | 9/19/2009 |
KT CONSULTING, INC. | $119,600 | HEALTH IT PROGRAMMING | National Institute of Standards and Technology | 1/12/2011 |
EARTH RESOURCES TECHNOLOGY, INC. | $116,104 | Provide Management and Administrative Support Services | National Oceanic and Atmospheric Administration | 7/09/2009 |
Camco Construction Services Inc | $112,600 |
Replacement of windows in Buildings 202,205,230,231,237, 301,302,304 and 309 at NIST Gaithersburg, MD
This spending item is part of a $547,542 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2010 |
L&M CONSTRUCTION, INC. | $110,140 | Building 223, Room A352 - Installation of the XPS Imaging System at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/20/2010 |
Mallon Construction Inc | $105,350 |
INFRAESTRUCTURE UPGRADES TO SUPPORT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY(NIST) CENTER FOR NEUTRON RESEARCH(NCNR), LOCATED AT NIST, GAITHERSBURG, MARYLAND CAMPUS.
This spending item is part of a $9,531,000 allocation.
See details
|
National Institute of Standards and Technology | 7/30/2010 |
Bethesda Bungalows | $105,000 |
Construction of a Net Zero Energy Test Facility
This spending item is part of a $2,590,110 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
Soul Customs | $104,087 |
Install solar panel arrays at the National Institute of Standards and Technology to produce renewable energy.
This spending item is part of a $4,867,671 allocation.
See details
|
National Institute of Standards and Technology | 9/13/2010 |
PREFERRED SYSTEMS SOLUTIONS, INC. | $104,083 | PROVIDE GRANTS ONLINE HELP DESK AND SYSTEM SUPPORT SERVICES | National Oceanic and Atmospheric Administration | 8/24/2010 |
CFR ENGINEERING CONSULTANTS, INC | $102,453 | Replacement of T12 lighting fixtures (with magnetic ballasts) with T8 fixtures in laboratory space. | National Institute of Standards and Technology | 9/08/2009 |
OAK MANAGEMENT, INC. | $100,000 | The objective of this task order is for the Contractor to provide personnel for provide program/project management, earned value management and schedule analysis services for the FSV6 Fisheries Survey Vesel acquisition program. | National Oceanic and Atmospheric Administration | 9/16/2010 |
COLIMORE ARCHITECTS, INC. | $98,818 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $283,460 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2009 |
COMPUTER NETWORK ARCHITECTS, INC. | $98,728 | The objective of this contract is to develop a test data set that can be used within the NIST Health IT Testing Infrastructure to determine conformance to the Health Level Seven version 3 clinical care document (CCD) de?nition. The Contractor shall provid | National Institute of Standards and Technology | 9/14/2010 |
COMPUTER NETWORK ARCHITECTS, INC. | $98,728 | The objective of this contract is to develop a test data set that can be used within the NIST Health IT Testing Infrastructure to determine conformance to the Health Level Seven version 3 clinical care document (CCD) de?nition. The Contractor shall provid | National Institute of Standards and Technology | 8/23/2010 |
COLIMORE ARCHITECTS, INC. | $98,414 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $165,203 allocation.
See details
|
National Institute of Standards and Technology | 9/19/2009 |
EQUORUM CORPORATION | $96,858 | Electronic Document Management System-Provide NOAA's Office of Marine and Aviation Operations - Platform Acquisition Division with 20 concurrent user license for eQuorum ImageSite software. Also includes software installation, customization, training and | National Oceanic and Atmospheric Administration | 9/08/2010 |
L&M CONSTRUCTION, INC. | $95,380 | Building 216, Lab G113 - Lab Renovations at The National Institute of Standards and Technology in Gaithersburg, Maryland | National Institute of Standards and Technology | 9/21/2010 |
COLIMORE ARCHITECTS, INC. | $95,189 |
A/E design services for the Robotics Facility Building 207. On the NIST Gaithersburg Campus
This spending item is part of a $233,565 allocation.
See details
|
National Institute of Standards and Technology | 9/18/2009 |
Glass Man Ta | $90,139 |
Replacement of windows in Buildings 202,205,230,231,237, 301,302,304 and 309 at NIST Gaithersburg, MD
This spending item is part of a $547,542 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2010 |
INTELLIGENT AUTOMATION, INC | $90,000 | This is an SBIR Technology Transfer award. The overall purpose of the award is to develop a functional specification and architecture for the Policy Machine concepts that have been developed by NIST, for the purpose of commercializing the Policy Machine c | National Institute of Standards and Technology | 6/21/2009 |
DAVIS-PAIGE MANAGEMENT SYSTEMS LLC | $85,000 | Acquisition Support Services | National Oceanic and Atmospheric Administration | 4/09/2010 |
COLIMORE ARCHITECTS, INC. | $82,555 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $154,323 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2009 |
LYNKER TECHNOLOGIES | $81,320 | RECOVERY American Recovery & Reinvestment Act Procurement. As an independent contractor, and not as an agent of the Government, the vendor shall perform Georgraphic Information System, Web Consulting & Electronic Navigational Chart services in support o | National Oceanic and Atmospheric Administration | 9/01/2009 |
INTELLIGENT AUTOMATION, INC | $80,000 |
Our society has become increasingly dependent on the reliability and proper functioning of a vast number of interconnected information systems. To improve the security of these systems, it is necessary to measure the amount of security provided by differe
This spending item is part of a $90,000 allocation.
See details
|
National Institute of Standards and Technology | 6/21/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $77,392 | Support National Oceanic Atmospheric Administration (NOAA) Acquisition and Grants Office Recovery Act Program Management Office | National Oceanic and Atmospheric Administration | 8/19/2010 |
GLOBAL ENGINEERING SOLUTIONS, INC. | $75,252 | GES to provide post construction award services (PCAS) for the installation of solar panels on the NIST, Gaithersburg, MD campus. | National Institute of Standards and Technology | 8/16/2010 |
CTR MANAGEMENT GROUP LLC | $75,143 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $1,399,959 allocation.
See details
|
National Institute of Standards and Technology | 9/21/2010 |
D.G. PROCUREMENT MANAGEMENT REVIEW SERVICES INC. | $69,364 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $1,399,959 allocation.
See details
|
National Institute of Standards and Technology | 9/21/2010 |
OMNITEC SOLUTIONS, INC. | $69,206 | NIST Smart Grid public web maintanence. | National Institute of Standards and Technology | 7/14/2010 |
Acker and Sons, Inc | $65,350 |
Construction of a Net Zero Energy Test Facility
This spending item is part of a $2,590,110 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
CFR ENGINEERING CONSULTANTS, INC | $64,616 | Provide labor and materials, quipment and supervision A/E services to design the electrical infrastructure for BLDGS 222,223,and 225 at the NIST, Gaithersburg, MD. Campus | National Institute of Standards and Technology | 9/22/2009 |
S&T SERVICES, LLC | $60,944 | ARRA Acquisition and Grant oversight and reporting support services | National Oceanic and Atmospheric Administration | 9/21/2010 |
INTELLIGENT AUTOMATION, INC | $60,000 |
A simulation platform is proposed to develop multi-posed family models for micro-Doppler sensing. The multi-posed models adopt recently created human model development (virtual family model), re-size and posture adjustment for CAD model based human subjec
This spending item is part of a $90,000 allocation.
See details
|
National Institute of Standards and Technology | 6/15/2009 |
DREAMNET ENTERPRISES LLC | $58,928 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $2,689,546 allocation.
See details
|
National Institute of Standards and Technology | 9/10/2009 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $52,429 |
A/E design services for the Robotics Facility Building 207. On the NIST Gaithersburg Campus
This spending item is part of a $233,565 allocation.
See details
|
National Institute of Standards and Technology | 9/18/2009 |
NATIONAL CERTIFIED TESTING LABORATORIES INC | $50,000 |
Replacement of windows in Buildings 202,205,230,231,237, 301,302,304 and 309 at NIST Gaithersburg, MD
This spending item is part of a $547,542 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2010 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $46,737 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $283,460 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2009 |
BRUDIS & ASSOCIATES INC | $44,882 | Post construction services for window replacement construction project | National Institute of Standards and Technology | 9/22/2010 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $40,594 |
The Net Zero Energy Residential Test Facility (NZERTF) will be used to demonstrate the viability of the Net Zero Energy concept for a residential structure that is similar in size and aesthetics to surrounding homes in the Gaithersburg, Md. area. The NZER
This spending item is part of a $117,799 allocation.
See details
|
National Institute of Standards and Technology | 11/20/2009 |
COLIMORE ARCHITECTS, INC. | $38,241 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $68,872 allocation.
See details
|
National Institute of Standards and Technology | 9/20/2009 |
D.G. PROCUREMENT MANAGEMENT REVIEW SERVICES INC. | $36,960 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $2,689,546 allocation.
See details
|
National Institute of Standards and Technology | 9/10/2009 |
JACOBS TECHNOLOGY INC. | $33,235 | Provide two independent construction cost estimates for the NETZERO residential construction home currently being designed by another contractor.Estimates are to be provided by Jacobs and one independent firm for 95% and 100% documents. ARRA COST ESTIMATE | National Institute of Standards and Technology | 2/19/2010 |
PROVIDEO MANAGEMENT INCORPORATED | $31,588 |
Contract will provide CISCO brand name only hardware and components per the line items in the contractand to be delivered to the Department of Commerce/National Institute of Standards and Technology, Gaithersburg, Maryland and Boulder, Colorado sites. The
This spending item is part of a $3,482,214 allocation.
See details
|
National Institute of Standards and Technology | 9/22/2009 |
SUN MANAGEMENT, INC. | $29,413 | Custom Computer Programming Services | National Institute of Standards and Technology | 9/14/2009 |
LONG FENCE COMPANY, INC. | $27,000 |
Construction of a Net Zero Energy Test Facility
This spending item is part of a $2,590,110 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2010 |
CFR ENGINEERING CONSULTANTS, INC | $26,647 | A/E services to design an organic photovoltaic characerization facility in Bldg 224, Rms A330 and A998 | National Institute of Standards and Technology | 5/05/2010 |
DAKOTA CONSULTING INCORPORATED | $26,057 | The objective of this effort is for Contractor to work with the HL7 Messaging Work Bench (MWB) tool and use the 'NCPDP SCRIPT Implementation Guide: Version 10.6' to accomplish the following tasks: Task 1: Update the existing NIST NEWRX Messaging Workbench | National Institute of Standards and Technology | 5/15/2012 |
CFR ENGINEERING CONSULTANTS, INC | $25,051 | install Imaging XPS and supporting equipment in Building 223, Rooms A352. This AE scope is to get the space ready for the tool. | National Institute of Standards and Technology | 1/13/2010 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $24,530 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $165,203 allocation.
See details
|
National Institute of Standards and Technology | 9/19/2009 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $24,418 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $154,323 allocation.
See details
|
National Institute of Standards and Technology | 9/17/2009 |
CTR MANAGEMENT GROUP LLC | $24,000 |
The Contractor shall provide all necessary personnel to perform the services required by individual call orders issued under this BPA within the period of performance of those orders. The contractor will provide acquisition management support to assist NI
This spending item is part of a $2,689,546 allocation.
See details
|
National Institute of Standards and Technology | 9/10/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $20,400 | Program Management Support for the Facilities Management & Stimulus Support Subtask 4.18. | National Oceanic and Atmospheric Administration | 12/23/2009 |
A & A TRANSFER, INC. | $19,640 |
Provide, deliver, rig into place, start-up, optimize and perform project closeout for six UPS as follows: 0001 Bldg 222 Room B251 100kVA UPS 0002 Bldg 222 Room B215 80kVA UPS 0003 Bldg 225 Room A368/B367 80kVA UPS 0004 Bldg 223 Room B340-B342 80kVA UPS 00
This spending item is part of a $402,163 allocation.
See details
|
National Institute of Standards and Technology | 9/23/2009 |
JACOBS TECHNOLOGY INC. | $15,711 | Provide administrative duties to complete the NEPA and NCPC documentation for seven (7) ARRA projects. These projects are:1) NetZero Residential Test Facility2) Solar Panels3) Fume Hoods4) Liquid Helium Recovery5) Energy Efficient Lighting6) Air Handling | National Institute of Standards and Technology | 2/23/2010 |
RED RIVER COMPUTER CO., INC. | $15,678 | Dell Latitude E6400 | National Oceanic and Atmospheric Administration | 9/16/2009 |
HALSEY, MCCORMACK & HELMER, INC. | $13,700 | Post construction award services for the helium recovery and reliquefaction construction project. | National Institute of Standards and Technology | 9/23/2010 |
CFR ENGINEERING CONSULTANTS, INC | $13,392 | Design the installation of milling machines in Bldg 221 and 304 located on the NIST campus | National Institute of Standards and Technology | 3/04/2010 |
KEAST & HOOD CO | $11,350 |
The Net Zero Energy Residential Test Facility (NZERTF) will be used to demonstrate the viability of the Net Zero Energy concept for a residential structure that is similar in size and aesthetics to surrounding homes in the Gaithersburg, Md. area. The NZER
This spending item is part of a $16,272 allocation.
See details
|
National Institute of Standards and Technology | 11/24/2009 |
CFR ENGINEERING CONSULTANTS, INC | $9,796 | A/E services to design for the lathe installation in Bldg 304, Rm 155 anmd Bldg 215, Rm C011 locaed on the NIST campus | National Institute of Standards and Technology | 3/12/2010 |
CFR ENGINEERING CONSULTANTS, INC | $9,770 | Design for the installation of a 5-axis miling machine in Bldg 304, Rm 155. | National Institute of Standards and Technology | 3/12/2010 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $9,211 |
Post construction award services. Including construction administration services for the duration of the construction.
This spending item is part of a $68,872 allocation.
See details
|
National Institute of Standards and Technology | 9/20/2009 |
CFR ENGINEERING CONSULTANTS, INC | $9,003 | PCAS for the construction of an electrical infrastructure for Blds 222,223,and 225 on the NIST, Gaithersburg MD campus | National Institute of Standards and Technology | 9/22/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $5,976 | Policy and Analysis Support | National Oceanic and Atmospheric Administration | 7/23/2009 |
CFR ENGINEERING CONSULTANTS, INC | $5,357 | PCAS construction of various lighting replacements at NIST Gaithersburg, MD Campus | National Institute of Standards and Technology | 9/23/2009 |
A. MORTON THOMAS AND ASSOCIATES, INC. | $4,922 |
The Net Zero Energy Residential Test Facility (NZERTF) will be used to demonstrate the viability of the Net Zero Energy concept for a residential structure that is similar in size and aesthetics to surrounding homes in the Gaithersburg, Md. area. The NZER
This spending item is part of a $16,272 allocation.
See details
|
National Institute of Standards and Technology | 11/24/2009 |
SCHARF ASSOCIATES INC. | $3,595 |
To replace NIST Gaithersburg single story facilities with double pane, argon-filled low-e windows. Retrofit walls with insulating material and seal external wall penetrations.
This spending item is part of a $281,610 allocation.
See details
|
National Institute of Standards and Technology | 9/22/2009 |