Montgomery County, Md., funds by Energy, Department of
Listing $192,739,260.40 in stimulus funds from Energy, Department of for Montgomery
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ENERGY ENTERPRISE SOLUTIONS, LLC | $18,323,976 |
The National Platform for Weatherization Training (NPWT) will take advantage of information technology (IT) tools for delivering training and providing performance-based testing that have been used successfully by the Department of Defense and innovative
This spending item is part of a $19,659,068 allocation.
See details
|
Energy, Department of | 12/15/2009 |
APPSENTIAL, LLC | $13,670,171 | Appsential LLC, was expected to provide and support IT improvements in performance, quality, timeliness, and efficiency of services provided by the DOE iManage Program and individual iManage systems. Appsential LLC, was expected to provide IT consulting a | Energy, Department of | 8/26/2009 |
SILICON GRAPHICS FEDERAL, INC. | $12,980,000 |
Industrial Carbon Capture and Storage Applications
This spending item is part of a $44,000,000 allocation.
See details
|
Energy, Department of | 9/10/2010 |
ENERGY SOLUTIONS PERFORMANCE STRATEGIES, INC. | $12,663,436 |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
AREVA FEDERAL SERVICES LLC | $11,014,683 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MONTGOMERY, COUNTY OF | $7,633,900 | Energy Efficiency and Conservation Block Grant Program (EECBG) RECOVERY ACT: COUNTY OF MONTGOMERY, MD ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT | Energy, Department of | 11/09/2009 |
SENTECH, INC. | $6,319,242 | 48C Tax Credit Peer Reviews & Admin Support | Energy, Department of | 11/02/2009 |
MONTGOMERY, COUNTY OF | $5,229,944 |
Weatherization Assistance for Low-Income Persons The American Recovery and Reinvestment Act of 2009, Public Law 111-5, appropriates funding for the Department of Energy to issue/award formula-based grants under the Weatherization Assistance Program. The purpose of the program is to increase the enerergy ... Show more
This spending item is part of a $64,003,045 allocation.
See details
|
Energy, Department of | 6/18/2009 |
DATA TREE, INC. OF VIRGINIA | $4,795,327 | The purpose of this contract is to develop the Performance and Accountability for Grants in Energy (PAGE) module for the Weatherization Assistance Program (WAP). This solution will provide DOE grantees a web-based tool for gathering and submitting their p | Energy, Department of | 7/14/2009 |
ASPEN GROUP, INC., THE | $4,570,229 |
Support to the offices of the Loan Guarantee Program and the Chief Financial Officer.
This spending item is part of a $13,178,423 allocation.
See details
|
Energy, Department of | 5/15/2009 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $4,350,740 |
ARRA funds awarded to provide DOE with ARRA reporting capability through the iPortal, and to upgrade the procurement STRIPES system, based on PRISM, to support creation and tracking of ARRA related procurement documents, and provide training to STRIPES us
This spending item is part of a $6,151,648 allocation.
See details
|
Energy, Department of | 7/24/2009 |
NATIONAL REGULATORY RESEARCH INSTITUTE | $4,266,326 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis The objective of this project is to address Eastern Interconnection Topic B efforts to provide for cooperation among states on electric resource planning and priorities. As part of this project, the Recipient will facililitate dialogue and collaboration am... Show more
This spending item is part of a $14,000,000 allocation.
See details
|
Energy, Department of | 7/01/2010 |
Maryland Clean Energy Center | $3,440,000 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
AREVA FEDERAL SERVICES LLC | $3,409,116 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SENTECH, INC. | $3,223,568 | EE Conservation Block Grant Program | Energy, Department of | 9/17/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $3,211,244 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $4,831,109 allocation.
See details
|
Energy, Department of | 5/15/2009 |
GEOGLOBAL U.S. GABBS LLC | $2,820,211 | Renewable Energy Research and Development Perform geomechanical surveys during surface exploration (Phase 1), to target sites for two stages of deep exploration drilling (Phase 2), and to perform extended well tests (Phase 3). An airborne Light Detection And Ranging (LiDAR) survey will be perform | Energy, Department of | 1/29/2010 |
AREVA FEDERAL SERVICES LLC | $2,712,910 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
WASHINGTON STATE UNIVERSITY | $2,610,507 |
The purpose of the DOE Recovery Act Clearinghouse is to help increase the availability of information about DOE?s American Recovery and Reinvestment Act of 2009 (ARRA) activities; and to inform DOE about what it learns from its interaction with the public
This spending item is part of a $3,950,000 allocation.
See details
|
Energy, Department of | 6/20/2009 |
SIMONSON MANAGEMENT SERVICES | $2,533,000 |
Provide the US DOE professional services required to support the objectives of the Weatherization Assistance Program
This spending item is part of a $3,668,000 allocation.
See details
|
Energy, Department of | 9/24/2009 |
DATA TREE, INC. OF VIRGINIA | $2,000,000 | The purpose of this contract is to develop the Performance and Accountability for Grants in Energy (PAGE) module for the State Energy Program (SEP). This solution will provide DOE grantees a web-based tool for gathering and submitting their performance a | Energy, Department of | 7/14/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $1,961,911 | The Information Services (IS) Team of the Golden Field Office (GO) provides information systems support (automation and web development) to the Department of Energy?s Golden Field Office federal and contractor personnel. The IS team also provides support | Energy, Department of | 6/16/2010 |
GLOBAL TECH INC. | $1,875,000 | Project Management support, including but not limited to, providing the following support for overarching services: develop and maintain a Work Breakdown Structure/Project Plan encompassing all tasks using PMBOK best practices; provide logistics support | Energy, Department of | 4/09/2009 |
D & R INTERNATIONAL, LTD | $1,819,985 |
EE Appliance Rebate Programs: This award provides funds for technical assistance to States and Territories so that they can launch market-transforming appliance rebate programs for ENERGY STAR qualified products. Funds will be used to assist in customiz
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
AREVA FEDERAL SERVICES LLC | $1,777,820 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MONTGOMERY HOUSING PARTNERSHIP, INC. | $1,750,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The Energy Efficiency and Conservation Block Grant Retrofit Ramp-up (EECBG) Program, authorized in Title V, Subtitle E of the Energy Independence and Security Act (EISA) and signed into law on December 19, 2007, is modeled after the Commumunity Development ... Show more
This spending item is part of a $20,000,000 allocation.
See details
|
Energy, Department of | 6/03/2010 |
PROJECT ENHANCEMENT CORPORATION | $1,739,535 |
Establish, implement, track and record projects funding by the American Recovery and Reinvestment Act of 2009 (ARRA) process. The ultimate goal of the final products of this work scope is to successfully implement ARRA responsibilities and also to reduce
This spending item is part of a $3,078,535 allocation.
See details
|
Energy, Department of | 5/27/2010 |
1 SOURCE CONSULTING, INC. | $1,725,076 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
DATA TREE, INC. OF VIRGINIA | $1,626,432 | The purpose of this contract is to develop the Performance and Accountability for Grants in Energy (PAGE) module for the Energy Efficiency Block Grant Program. This solution provides DOE grantees a web-based tool for gathering and submitting their perfor | Energy, Department of | 9/10/2009 |
WESTAT, INC. | $1,605,246 | SAIC will develop household and energy supplier control and frame files. 1) Implement quality control measures prior to, during and after data collection to update the information. 2) Track all changes to the initial Household-level control file using | Office the of the Energy Information Administration | 8/23/2010 |
SENTECH, INC. | $1,600,300 | Weatherization Program Research and logistics support | Energy, Department of | 2/01/2010 |
SENTECH INC | $1,536,000 | 48C Tax CreditPeer Reviews & Admin Support | Energy, Department of | 11/02/2009 |
E-MANAGEMENT CONSULTANTS, INC. | $1,508,821 | ARRA IT Program Support | Assistant Secretary for Environmental Management | 9/10/2009 |
ACADIA OPTRONICS, LLC | $1,499,960 | Office of Science Financial Assistance Program In recent years, network bandwidth requirements have scaled multiple folds, pushing the need for the development of data exchange mechanisms at 100 Gb/s and beyond. High performance computing, large-scale storage, and collaborative scientific research arare... Show more | Office of Science | 2/23/2010 |
PROJECT ENHANCEMENT CORPORATION | $1,489,008 |
Provide support to the DOE-EM ARRA Team in defining, establishing, implementing, and tracking the projects funded by the Recovery Act.
This spending item is part of a $2,286,664 allocation.
See details
|
Energy, Department of | 6/24/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $1,343,808 |
Develop, beta-test, deploy, and provide training and support for the initial users of the Web-based tracking system for Federal energy and water efficiency measures, incorporating foundational data as provided. Activities under this sub-task include, but
This spending item is part of a $1,372,500 allocation.
See details
|
Energy, Department of | 8/24/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $1,339,493 |
The purpose of the DOE Recovery Act Clearinghouse is to help increase the availability of information about DOE?s American Recovery and Reinvestment Act of 2009 (ARRA) activities; and to inform DOE about what it learns from its interaction with the public
This spending item is part of a $3,950,000 allocation.
See details
|
Energy, Department of | 6/20/2009 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $1,287,451 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
ASPEN GROUP, INC., THE | $1,267,416 |
Support to the offices of the Loan Guarantee Program and the Chief Financial Officer.
This spending item is part of a $3,964,988 allocation.
See details
|
Energy, Department of | 5/15/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $1,195,949 |
The contractor will assist the Weatherization and Intergovernmental Program to develop and provide customer oriented technology deployment services. The primary area of emphasis is on web-based and call-center support that benefits Recovery Act program p
This spending item is part of a $5,488,576 allocation.
See details
|
Energy, Department of | 10/27/2009 |
APPSENTIAL, LLC | $1,178,198 | Appsential LLC, was expected to provide and support IT improvements in performance, quality, timeliness, and efficiency of services provided by the DOE iManage Program and individual iManage systems. Appsential LLC, was expected to provide IT consulting a | Energy, Department of | 7/24/2009 |
SENTECH, INC. | $1,100,000 | Energy, Water & Emissions Reporting & Tracking System | Energy, Department of | 8/21/2009 |
DATA TREE, INC. OF VIRGINIA | $1,100,000 | The purpose of this contract is to provide operations and maintenance support for the Performance and Accountability for Grants in Energy (PAGE) site for the Weatherization Assistance (WAP), State Energy (SEP), Energy Efficiency and Conservation Block Gra | Energy, Department of | 8/05/2011 |
Maryland Clean Energy Center | $1,000,000 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
D & R INTERNATIONAL, LTD | $948,205 |
Building Technologies Program: Solid State Lighting. This award provides funding for solid-state lighting outreach to large retail partners for an 18-month program. The key components of the outreach include cooperative marketing support, expansion of
This spending item is part of a $1,200,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $940,543 |
The mission of the Weatherization and Intergovernmental Program (WIP) is to accelerate the deployment of energy efficiency, renewable energy, and oil displacement technologies and practices by a wide range of stakeholders. These include States, U.S. Terr
This spending item is part of a $990,000 allocation.
See details
|
Energy, Department of | 8/26/2009 |
AREVA FEDERAL SERVICES LLC | $900,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
D & R INTERNATIONAL, LTD | $899,945 |
EERE Recovery Act Bridge Program Direction (Management and Oversight): This award provides funds for technical assistance to the EERE Recovery Act Energy Star Appliance Rebate Program and Energy Star Program and support for the continued development and
This spending item is part of a $1,000,000 allocation.
See details
|
Energy, Department of | 12/29/2010 |
Oracle Usa, Inc. | $825,748 |
Oracle Software Support Renewal
This spending item is part of a $1,306,708 allocation.
See details
|
Energy, Department of | 2/26/2010 |
D & R INTERNATIONAL, LTD | $750,000 |
Provide the US DOE professional services required to support the objectives of the Weatherization Assistance Program
This spending item is part of a $3,668,000 allocation.
See details
|
Energy, Department of | 9/24/2009 |
ROCKVILLE, CITY OF | $683,300 | Energy Efficiency and Conservation Block Grant Program (EECBG) The overall purpose of Rockville's energy efficiency conservation block grant programs focus on improving the energy efficiency of City owned buildings and facilities by using EECBG funds as well as other City funding. The EECBG grant tatargets energy effi... Show more | Energy, Department of | 11/13/2009 |
BCS, INCORPORATED | $658,607 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $719,596 allocation.
See details
|
Energy, Department of | 11/12/2009 |
E-MANAGEMENT CONSULTANTS, INC. | $627,000 | ARRA IT program support | Assistant Secretary for Environmental Management | 8/22/2011 |
AREVA FEDERAL SERVICES LLC | $624,925 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BCS, INCORPORATED | $623,755 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
TECHNOLOGIES & DEVICES INTERNATIONAL | $600,000 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
SYSTEMATIC MANAGEMENT SERVICES, INC. | $598,778 |
SMS will provide the necessary resources and technical capability to provide management support to the DOE Office of Electricity Delivery and Energy Reliability (OE) in conducting the 2009 Smart Grid Investment Grant Program FOA application merit/peer rev
This spending item is part of a $1,459,750 allocation.
See details
|
Energy, Department of | 5/21/2009 |
GAITHERSBURG, CITY OF | $578,000 | Energy Efficiency and Conservation Block Grant Program (EECBG) Phase I contract executed in Oct-Dec 11 quarter. City received notice of $5,000+ in Pepco rebates The City finalized its long-term Strategic Plan, and executed a contract with Honeywell International Inc. on April 6, 2011. | Energy, Department of | 9/08/2009 |
SCHEER VENTURES L.L.C. | $550,000 |
Navigant Consulting, Inc. (NCI) and its team will support the Department of Energy (DOE) in measuring the impacts that result from the implementation of projects associated with its Smart Grid Investment Grant (SGIG) program. Specific tasks include: devel
This spending item is part of a $12,900,000 allocation.
See details
|
Energy, Department of | 9/17/2010 |
SENTECH, INC. | $523,534 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
PLANET TECHNOLOGIES, INC | $504,853 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $4,831,109 allocation.
See details
|
Energy, Department of | 5/15/2009 |
SENTECH INC | $499,948 | FEMP ARRA Support | Energy, Department of | 9/24/2009 |
DLT SOLUTIONS, LLC | $480,960 |
Oracle Software Support Renewal
This spending item is part of a $1,306,708 allocation.
See details
|
Energy, Department of | 2/26/2010 |
TROWBRIDGE & TROWBRIDGE, LLC | $448,384 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
SENTECH, INC. | $430,000 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
SENTECH, INC. | $425,000 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Managing distribution system resources for improved service quality and reliability, transmission congestion relief, and grid support functions. Amendment 001 involves the awarding of funds from the American Recovery and d Reinvestment Act of 2009 (Recovery... Show more
This spending item is part of a $5,548,585 allocation.
See details
|
Energy, Department of | 7/17/2009 |
MONTGOMERY HOUSING PARTNERSHIP, INC. | $422,353 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The Energy Efficiency and Conservation Block Grant Retrofit Ramp-up (EECBG) Program, authorized in Title V, Subtitle E of the Energy Independence and Security Act (EISA) and signed into law on December 19, 2007, is modeled after the Commumunity Development ... Show more
This spending item is part of a $20,000,000 allocation.
See details
|
Energy, Department of | 6/03/2010 |
HEWLETT-PACKARD COMPANY | $400,002 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
PRINCETON ENERGY RESOURCES INTERNATIONAL LLC | $392,520 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Renewable Energy Business Certificate Program for Rural Electric Power Sector
This spending item is part of a $750,000 allocation.
See details
|
Energy, Department of | 7/30/2010 |
PLANET TECHNOLOGIES, INC | $387,950 |
Contractor shall provide the personnel and all other resources required to complete case studies and ancillary support which assesses OE's impact on the nation's electric infrastructure resulting from the implemenetation of the Recovery Act. Case Study 1
This spending item is part of a $16,686,514 allocation.
See details
|
Energy, Department of | 9/30/2010 |
PLANET TECHNOLOGIES, INC | $387,950 |
Contractor shall provide the personnel and all other resources required to complete case studies and ancillary support which assesses OE's impact on the nation's electric infrastructure resulting from the implementation of the Recovery Act. Case Study 1:
This spending item is part of a $880,403 allocation.
See details
|
Energy, Department of | 9/30/2010 |
CLIENT NETWORK SERVICES, INC. | $387,187 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $4,831,109 allocation.
See details
|
Energy, Department of | 5/15/2009 |
TECHNOLOGY AND MANAGEMENT SERVICES, INC. | $376,146 |
Provide Office of the Assistant Secretary and the office of the Deputy Assistant Secretary for Technology Development the means to support the R&D mission and vision of the Energy Efficiency and Renewable Energy with technical, engineering, analytical, an
This spending item is part of a $2,237,586 allocation.
See details
|
Energy, Department of | 8/27/2009 |
POTOMAC-HUDSON ENGINEERING, INC. | $353,877 | Support DOE in the preparation of 8 environmental assessments to access the potential for impacts to the environment as a result of DOE's participation in a coop agreement with BASF. | Energy, Department of | 9/29/2009 |
ELYSIAN ENERGY, LLC | $338,502 |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to assist eligible entities in creating and implementing strategies to: ?reduce fossil fuel emissions in a manner that is environmentally sustainable and, to the maximum extent practicable, maximizes b benefits for local... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 12/07/2009 |
M SQUARED STRATEGIES, INC. | $333,770 | M2 staff will assist in enhancing and transforming the iManage iPortal and IDW Dashboard/Reports to serve as the Departmental source for data integration, reporting, and internal ARRA management. They will support reporting to the Agency?s external Recov | Energy, Department of | 7/24/2009 |
PLANET TECHNOLOGIES, INC | $326,428 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
ADP CONSULTANTS, INC. | $302,877 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Recovery Act: Prince George's County, MD Energy Efficiency and Conservation Block Grant.
This spending item is part of a $6,629,200 allocation.
See details
|
Golden Field Office | 9/14/2009 |
PROJECT ENHANCEMENT CORPORATION | $300,000 | Establish, implement, track and record projects funding by the American Recovery and Reinvestment Act of 2009 (ARRA) process. The ultimate goal of the final products of this work scope is to successfully implement ARRA responsibilities and also to reduce | Energy, Department of | 5/27/2010 |
SIMONSON MANAGEMENT SERVICES | $300,000 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
NORTHEAST MARYLAND WASTE DISPOSAL AUTHORITY | $280,800 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
ACTIONET, INC. | $271,000 | Issued $271,000 on June 11, 2012 | Energy, Department of | 6/11/2012 |
PROJECT PERFORMANCE CORPORATION | $269,755 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
1 SOURCE CONSULTING, INC. | $252,817 |
work covers OE?s ARRA-specific needs that are matched with ITSS services including:--Office-Level ARRA Activity Support, Smart Grid Technical Support, to include the Smart Grid Investment Grants Programs, Smart Grid and Energy Storage Demonstration and ot
This spending item is part of a $704,251 allocation.
See details
|
Energy, Department of | 4/22/2010 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $250,000 | nothing to report yet | Energy, Department of | 9/16/2010 |
TROWBRIDGE & TROWBRIDGE, LLC | $246,356 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $4,831,109 allocation.
See details
|
Energy, Department of | 5/15/2009 |
D & R INTERNATIONAL, LTD | $237,497 |
EE Appliance Rebate Programs: This award provides funds for technical assistance to States and Territories so that they can launch market-transforming appliance rebate programs for ENERGY STAR qualified products. Funds will be used to assist in customiz
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $210,044 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $719,596 allocation.
See details
|
Energy, Department of | 11/12/2009 |
DATA SOLUTIONS & TECHNOLOGY (DST), INC. | $208,666 | Administrative Support Services | Energy, Department of | 8/28/2009 |
SENTECH, INC. | $207,080 |
Energy Eff & Renew Enrgy Info Tech Asst MEA plans on using these Save Energy Now funds to deliver aspects of the federal SEN program to Maryland industries, including ITP training and software tools. The funds will expand beyond the existing Industrial Technology Program resources to address op
This spending item is part of a $350,000 allocation.
See details
|
Energy, Department of | 11/23/2009 |
SYSTEMATIC MANAGEMENT SERVICES, INC. | $204,554 |
SMS, Inc will provide the necessary resources and technical capability to provide management support to the DOE Office of Electricity Delivery and Energy Reliability (OE) in conducting the 2009 Workforce Training FOA application merit/peer reviews in acc
This spending item is part of a $454,554 allocation.
See details
|
Energy, Department of | 10/19/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $200,170 |
work covers OE?s ARRA-specific needs that are matched with ITSS services including:--Office-Level ARRA Activity Support, Smart Grid Technical Support, to include the Smart Grid Investment Grants Programs, Smart Grid and Energy Storage Demonstration and ot
This spending item is part of a $704,251 allocation.
See details
|
Energy, Department of | 4/22/2010 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $198,104 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, | $183,493 | To provide a Nuclear Services Engineer to assist DOE SR Assistant Manager for Nuclear Materials Stabilization Project Engineering Division (NMED) in performing safety analysis and reviewing of support functions. This is due to the acceleration of the dec | Energy, Department of | 9/30/2009 |
POTOMAC-HUDSON ENGINEERING, INC. | $170,616 | Professional Services to assist DOE/FE in NEPA 216 Reviews | Energy, Department of | 9/15/2009 |
POTOMAC-HUDSON ENGINEERING, INC. | $170,000 | Professional Services to assist DOE/FE in NEPA 216 Reviews | Energy, Department of | 3/18/2010 |
PROJECT PERFORMANCE CORPORATION | $167,175 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $719,596 allocation.
See details
|
Energy, Department of | 11/12/2009 |
SENTECH, INC. | $161,627 |
Provide Office of the Assistant Secretary and the office of the Deputy Assistant Secretary for Technology Development the means to support the R&D mission and vision of the Energy Efficiency and Renewable Energy with technical, engineering, analytical, an
This spending item is part of a $2,237,586 allocation.
See details
|
Energy, Department of | 8/27/2009 |
VICCS, INC. (VERTEX INFORMATION AND COMPUTER CONSULTING SERVICES, INC.) | $150,552 |
ARRA funds awarded to provide DOE with ARRA reporting capability through the iPortal, and to upgrade the procurement STRIPES system, based on PRISM, to support creation and tracking of ARRA related procurement documents, and provide training to STRIPES us
This spending item is part of a $6,151,648 allocation.
See details
|
Energy, Department of | 7/24/2009 |
SENTECH, INC. | $150,000 | 48C Tax Credit Peer Reviews & Admin Support | Energy, Department of | 11/02/2009 |
SIMONSON MANAGEMENT SERVICES | $150,000 |
The purpose of this task is to provide the Department of Energy (DOE) with technical assistance for the implementation of the DOE Weatherization Assistance Program (WAP) and to assist the WAP grantees in the ramp up and implementation of their Weatherizat
This spending item is part of a $3,300,000 allocation.
See details
|
Energy, Department of | 8/31/2010 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $140,432 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $2,162,044 allocation.
See details
|
Energy, Department of | 8/21/2009 |
USEC INC. | $138,191 |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
FEDITC LLC | $126,172 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $4,831,109 allocation.
See details
|
Energy, Department of | 5/15/2009 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $124,386 |
Industrial Carbon Capture and Storage Applications
This spending item is part of a $44,000,000 allocation.
See details
|
Energy, Department of | 9/10/2010 |
PROJECT ENHANCEMENT CORPORATION | $124,292 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
APPSENTIAL, LLC | $123,710 | NNSA EPAT implementation | Energy, Department of | 8/13/2010 |
1 SOURCE CONSULTING, INC. | $118,182 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $719,596 allocation.
See details
|
Energy, Department of | 11/12/2009 |
Critical Systems, LLC | $110,733 |
Award Title: Integrated Assessment Research. Award Purpose: Contribute to significant advances for the Integrated Assessment Research Program (IARP) whose goals are to improve understanding of and to develop leading national decision support tools regardi
This spending item is part of a $4,860,000 allocation.
See details
|
Office of Science | 8/12/2009 |
PRICEWATERHOUSECOOPERS LLP | $101,596 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $3,771,938 allocation.
See details
|
Energy, Department of | 5/29/2009 |
SENTECH, INC. | $100,000 | Enhance & Accelerate FEMP Service Functions to the federal government | Energy, Department of | 9/24/2009 |
CPV PINEY REACH RENEWABLE ENERGY COMPANY, LLC | $100,000 |
State Energy Program The Maryland Energy Administration (MEA) has developed a four-pronged approach to promote affordable, reliable and clean energy using monies from the federal American Recovery and Reinvestment Act and Maryland's state Strategic Energy Investment Fund (SEI
This spending item is part of a $51,746,000 allocation.
See details
|
Energy, Department of | 1/26/2010 |
D & R INTERNATIONAL, LTD | $99,999 |
Building Technologies Program: Solid State Lighting. This award provides funding for solid-state lighting outreach to large retail partners for an 18-month program. The key components of the outreach include cooperative marketing support, expansion of
This spending item is part of a $1,200,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
USEC INC. | $95,488 |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
NATIONAL REGULATORY RESEARCH INSTITUTE | $95,000 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Under this award, NARUC will G?? Assist State PUCG??s in securing limited term, highly specialized, subject matter experts for issues relating to regulatory proceedings. G?? Develop an education program to promote high q quality and effective regulatory de... Show more
This spending item is part of a $4,000,000 allocation.
See details
|
Energy, Department of | 2/18/2010 |
TAKOMA PARK, CITY OF | $93,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) MEA is using our EECBG funding to enable sub-grants to Maryland counties, cities, and towns that are not receiving EECBG grants directly from DOE. The sub-grants will be used to enable energy efficiency and renewable energy technology onon facilities owned... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 2/26/2010 |
USEC INC. | $92,654 |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
ENERGY SOLUTIONS PERFORMANCE STRATEGIES, INC. | $82,268 |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
JUPITER CORPORATION | $81,311 |
Conduct Recovery Act External Independent Review for the Savanah River Site (SRS) for the deactivation and decommissioning of the P and R reactors as requested by the DOE Office of Engineering and Construction Management.
This spending item is part of a $100,000 allocation.
See details
|
Energy, Department of | 9/21/2009 |
NEXIGHT GROUP | $80,000 |
Contractor shall provide the personnel and all other resources required to complete case studies and ancillary support which assesses OE's impact on the nation's electric infrastructure resulting from the implemenetation of the Recovery Act. Case Study 1
This spending item is part of a $16,686,514 allocation.
See details
|
Energy, Department of | 9/30/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $75,751 |
SEP/EECBG/WAP ARRA 2009-2012 Integration Projects: This award provides funding of $11,310,000 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 20877 entitled 'Recovery Act Technical and Communications Support
This spending item is part of a $11,310,000 allocation.
See details
|
Energy, Department of | 4/20/2010 |
TROWBRIDGE & TROWBRIDGE, LLC | $70,545 |
work covers OE?s ARRA-specific needs that are matched with ITSS services including:--Office-Level ARRA Activity Support, Smart Grid Technical Support, to include the Smart Grid Investment Grants Programs, Smart Grid and Energy Storage Demonstration and ot
This spending item is part of a $704,251 allocation.
See details
|
Energy, Department of | 4/22/2010 |
APPSENTIAL, LLC | $70,000 | Appsential LLC, was expected to provide and support IT improvements in performance, quality, timeliness, and efficiency of services provided by the DOE iManage Program and individual iManage systems. Appsential LLC, was expected to provide IT consulting a | Energy, Department of | 8/26/2009 |
NATIONAL REGULATORY RESEARCH INSTITUTE | $63,000 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Under this award, NARUC will G?? Assist State PUCG??s in securing limited term, highly specialized, subject matter experts for issues relating to regulatory proceedings. G?? Develop an education program to promote high q quality and effective regulatory de... Show more
This spending item is part of a $4,000,000 allocation.
See details
|
Energy, Department of | 2/18/2010 |
LEGIN GROUP, INC. | $60,799 | The work performed was to enhance commercialization studies under Recovery Act Phase II SBIR/STTR applications. | Office of Science | 9/17/2010 |
BCS, INCORPORATED | $55,012 |
work covers OE?s ARRA-specific needs that are matched with ITSS services including:--Office-Level ARRA Activity Support, Smart Grid Technical Support, to include the Smart Grid Investment Grants Programs, Smart Grid and Energy Storage Demonstration and ot
This spending item is part of a $704,251 allocation.
See details
|
Energy, Department of | 4/22/2010 |
LOCKHEED MARTIN SERVICES, INC. | $54,112 |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
USEC INC. | $53,192 |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
SENTECH, INC. | $41,781 |
Energy Efficient Appliance Rebate Program (EEARP) Maryland is working with the state's utility companies to administer the program. This allows the state to take advantage of the infrastructure already in place for the utilities' appliance rebate programs. SEEARP funding will allow for $300 rebateses for... Show more
This spending item is part of a $5,405,000 allocation.
See details
|
Energy, Department of | 12/10/2009 |
AREVA FEDERAL SERVICES LLC | $41,360 |
Renewable Energy Research and Development AREVA will assess and evaluate existing strategies for managing electricity generated by wind in control-room operations and make recommendations that guide the development of business processes and decisions support tools that support the effective use o
This spending item is part of a $278,610 allocation.
See details
|
Energy, Department of | 11/25/2009 |
APPSENTIAL, LLC | $40,560 | Appsential LLC, was expected to provide and support IT improvements in performance, quality, timeliness, and efficiency of services provided by the DOE iManage Program and individual iManage systems. Appsential LLC, was expected to provide IT consulting a | Energy, Department of | 8/26/2009 |
SYSTEM ONE, INC. | $40,000 |
SMS will provide the necessary resources and technical capability to provide management support to the DOE Office of Electricity Delivery and Energy Reliability (OE) in conducting the 2009 Smart Grid Investment Grant Program FOA application merit/peer rev
This spending item is part of a $1,459,750 allocation.
See details
|
Energy, Department of | 5/21/2009 |
ECONOMETRICA, INC | $39,857 |
Assistance with the DOE's ENERGY STAR Program verification testing of manufacturer claimed ratings for appliances eligible for the State Energy Efficiency Appliance Rebate Program.
This spending item is part of a $9,713,023 allocation.
See details
|
Energy, Department of | 12/22/2009 |
APPSENTIAL, LLC | $37,000 | To provide EE with BI dashboards and reports related to Recovery Funding | Energy, Department of | 8/13/2010 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $35,000 | The service provider shall provide a COTS software tool, such as Handysoft Bizflow, Serena Dimensions, Serena Teamtrack, or similar, to track and manage audits through the audit lifecycle. The software tool should integrate and interface with other appli | Energy, Department of | 7/09/2010 |
SENTECH, INC. | $32,255 |
SAIC will provide support for model development applicable to the electricity, renewable and demand side submodules of the National Energy Modeling System, the new National Energy Model (NEM), and other widely used energy models to accommodate the represe
This spending item is part of a $862,296 allocation.
See details
|
Office the of the Energy Information Administration | 9/20/2010 |
The Town of Poolesville | $32,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) MEA is using our EECBG funding to enable sub-grants to Maryland counties, cities, and towns that are not receiving EECBG grants directly from DOE. The sub-grants will be used to enable energy efficiency and renewable energy technology onon facilities owned... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 2/26/2010 |
HILTON HOTEL ROCKVILLE | $31,754 |
ORIGINAL AWARD AMOUNT WAS $2,731,106. AFTER DEOLIBGATION OF $776,438.09 (DOE-EE FUNDS FOR IRA 48C-contract mod 296), NEW AWARD AMOUNT IS $1,954,667.91.
This spending item is part of a $1,954,668 allocation.
See details
|
Energy, Department of | 10/29/2009 |
ENERGY AND ENVIRONMENTAL EFFICIENCY MANAGEMENT INC | $29,377 |
Industrial Assessment Centers and Plant Best Practices: This award provides funding to complete new and enhanced Save Energy Now (SEN) assessments and funds to complete technical assistance activities to support SEN assessments.
This spending item is part of a $1,408,356 allocation.
See details
|
Energy, Department of | 9/30/2009 |
D & R INTERNATIONAL, LTD | $25,000 |
The purpose of this task is to provide the Department of Energy (DOE) with technical assistance for the implementation of the DOE Weatherization Assistance Program (WAP) and to assist the WAP grantees in the ramp up and implementation of their Weatherizat
This spending item is part of a $3,300,000 allocation.
See details
|
Energy, Department of | 8/31/2010 |
NATIONAL REGULATORY RESEARCH INSTITUTE | $22,000 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Under this award, NARUC will G?? Assist State PUCG??s in securing limited term, highly specialized, subject matter experts for issues relating to regulatory proceedings. G?? Develop an education program to promote high q quality and effective regulatory de... Show more
This spending item is part of a $4,000,000 allocation.
See details
|
Energy, Department of | 2/18/2010 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $20,717 |
ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr
This spending item is part of a $24,387 allocation.
See details
|
Energy, Department of | 8/21/2009 |
SENTECH INC | $16,429 | Merit Review Services | Golden Field Office | 8/25/2009 |
SENTECH INC | $16,429 | Merit Review Services | Golden Field Office | 8/25/2009 |
SENTECH INC | $16,429 | Merit Review Services | Golden Field Office | 8/25/2009 |
SENTECH INC | $16,429 | Merit review services | Golden Field Office | 8/25/2009 |
SENTECH INC | $15,554 | TAS Recovery Merit Review Services | Golden Field Office | 8/17/2009 |
SENTECH INC | $15,554 | Merit Review Services | Golden Field Office | 8/25/2009 |
TROWBRIDGE & TROWBRIDGE, LLC | $14,707 |
Develop, beta-test, deploy, and provide training and support for the initial users of the Web-based tracking system for Federal energy and water efficiency measures, incorporating foundational data as provided. Activities under this sub-task include, but
This spending item is part of a $1,372,500 allocation.
See details
|
Energy, Department of | 8/24/2009 |
SENTECH INC | $12,542 | Investigation of intermediate ethanol blends, optimization of E-95 engines and development of transportation infrastructure | Golden Field Office | 9/25/2009 |
POTOMAC-HUDSON ENGINEERING, INC. | $11,905 | Support DOE in the preparation of 8 environmental assessments to access the potential for impacts to the environment as a result of DOE's participation in a coop agreement with BASF. | Energy, Department of | 9/08/2010 |
SENTECH INC | $11,085 | Investigation of intermediate ethanol blends, optimization of E-95 engines and development of transportation infrastructure | Golden Field Office | 9/25/2009 |
SENTECH INC | $10,986 | Investigation of intermediate ethanol blends, optimization of E-95 engines and development of transportation infrastructure | Golden Field Office | 9/25/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $4,311 | ARRA IT Operations support services to include Sharepoint Sortware implementation, expanded IT support infrastructure, Citrix remote acess, Desktop Collaboration Support Tool Capabilities, Development and maintenance of Reviewer Web Site Provide and to pr | Energy, Department of | 8/21/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $1,124 | 17 telephone instruments which are a critical requirement within the Office of Procurement and Assistance Management to conduct daily business-related ARRA duties | Energy, Department of | 9/14/2009 |
ENERGY ENTERPRISE SOLUTIONS, LLC | $0 |
Work covers OE's ARRA-specific needs that are matched with ITSS services including: --Office-Level ARRA Activity Support --Smart Grid Technical Support, to include the Smart Grid Investment Grants Program, Smart Grid and Energy Storage Demonstration, an
This spending item is part of a $719,596 allocation.
See details
|
Energy, Department of | 11/12/2009 |
PROJECT ENHANCEMENT CORPORATION | $0 |
Establish, implement, track and record projects funding by the American Recovery and Reinvestment Act of 2009 (ARRA) process. The ultimate goal of the final products of this work scope is to successfully implement ARRA responsibilities and also to reduce
This spending item is part of a $310,835 allocation.
See details
|
Energy, Department of | 5/27/2010 |
PROJECT ENHANCEMENT CORPORATION | $0 |
Establish, implement, track and record projects funding by the American Recovery and Reinvestment Act of 2009 (ARRA) process. The ultimate goal of the final products of this work scope is to successfully implement ARRA responsibilities and also to reduce
This spending item is part of a $43,434 allocation.
See details
|
Energy, Department of | 5/27/2010 |
PRICEWATERHOUSECOOPERS LLP | $0 |
work covers OE?s ARRA-specific needs that are matched with ITSS services including:--Office-Level ARRA Activity Support, Smart Grid Technical Support, to include the Smart Grid Investment Grants Programs, Smart Grid and Energy Storage Demonstration and ot
This spending item is part of a $704,251 allocation.
See details
|
Energy, Department of | 4/22/2010 |
PROJECT PERFORMANCE CORPORATION | $0 |
work covers OE?s ARRA-specific needs that are matched with ITSS services including:--Office-Level ARRA Activity Support, Smart Grid Technical Support, to include the Smart Grid Investment Grants Programs, Smart Grid and Energy Storage Demonstration and ot
This spending item is part of a $704,251 allocation.
See details
|
Energy, Department of | 4/22/2010 |