Prince George's County, Md., funds by General Services Administration

Listing $5,270,444.46 in stimulus funds from General Services Administration for Prince George's

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
DAE SUNG CORPORATION $1,220,405 Add Variable Frequency Drive to 2 1000 ton chillers at The New Carrollton Federal Building at 5000 Ellin Road, New Carrollton Maryland. Using the American Reinvestment and Recovery Act funds. Public Buildings Service 9/16/2010
PRESIDIO NETWORKED SOLUTIONS, INC. $858,448 The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation. See details
Public Buildings Service 11/13/2009
DAE SUNG CORPORATION $746,628 Provide parking lot and gate area lighting upgrades at The Suitland Federal Building in Suitland Maryland using the ARRA Funds. Public Buildings Service 7/09/2010
DESBUILD INCORPORATED $684,276 Replace the single, multi celled cooling tower with three (3) factory fabricated stainless steel tower at 200 Department of Labor, Constitution Avenue, Washington DC . Each tower will be 4800GPM and continue to serve the three (3) 1600 ton chillers.
This spending item is part of a $3,037,876 allocation. See details
Public Buildings Service 9/28/2010
CAS SEVERN, INC. $661,877 Recipient will provide subject matter and engineering support to IHS, Office of Information Technology (OIT) to assist in developing a set of implementation methods and instructions to perform an upgrade of the RPMS servers to the latest release of InterS General Services Administration 12/22/2009
Gales Warning Charters, Inc. $247,400 Replace the single, multi celled cooling tower with three (3) factory fabricated stainless steel tower at 200 Department of Labor, Constitution Avenue, Washington DC . Each tower will be 4800GPM and continue to serve the three (3) 1600 ton chillers.
This spending item is part of a $3,037,876 allocation. See details
Public Buildings Service 9/28/2010
CTS SERVICES LLC $168,640 The award requries the Lessor (Vertex Non-Profit Holdings, Inc.) to lease to the Government approximately 54,157 rentable square feet of office space, IT/Computing space and related support space within the I-79 Technology Park Research Center located at
This spending item is part of a $22,320,817 allocation. See details
Public Buildings Service 8/31/2010
STRICKLAND FIRE PROTECTION, INC. $105,071 Replace the single, multi celled cooling tower with three (3) factory fabricated stainless steel tower at 200 Department of Labor, Constitution Avenue, Washington DC . Each tower will be 4800GPM and continue to serve the three (3) 1600 ton chillers.
This spending item is part of a $3,037,876 allocation. See details
Public Buildings Service 9/28/2010
APPLIED FIRE PROTECTION ENGINEERING, INC. $95,658 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
APPLIED FIRE PROTECTION ENGINEERING, INC. $88,000 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
VE CSIE JV $58,189 The purpose of this project is A/E design services for the replacement of the facility boiler plant with the goal of increasing energy efficiency of the system that serves the CMS complex. The result of the project is the development of plans and specif Public Buildings Service 8/11/2009
AMA ANALYTICAL SERVICES, INC. $56,707 Provide additional and unanticipated asbestos and lead abatement sampling, monitoring and testing services for Phase 2 of the Systems replacement project for the Department of Commerce-Herbert C. Hoover Building in Washington, DC. *******This project has
This spending item is part of a $671,859 allocation. See details
Public Buildings Service 1/26/2011
DJB CONTRACTING, INCORPORATED $54,128 Replace the single, multi celled cooling tower with three (3) factory fabricated stainless steel tower at 200 Department of Labor, Constitution Avenue, Washington DC . Each tower will be 4800GPM and continue to serve the three (3) 1600 ton chillers.
This spending item is part of a $3,037,876 allocation. See details
Public Buildings Service 9/28/2010
APPLIED FIRE PROTECTION ENGINEERING, INC. $47,900 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
AMA ANALYTICAL SERVICES, INC. $45,500 THE PURPOSE OF THIS ACQUISITION IS TO OBTAIN INDUSTRIAL HYGIENE MONITORING SERVICES FOR DEPARTMENT OF THE INTERIOR MODERNIZATION, 1849 C STREET, S.W., WASHINGTON, DC, USA.
This spending item is part of a $782,980 allocation. See details
Public Buildings Service 3/30/2010
VE CSIE JV $40,459 The purpose of this project is to study the boiler plant that serves the CMS complex, determine necessary replacement, upgrades, or repairs to increase the energy efficiency of the system, and to identify any other opportunities to improve the system. The Public Buildings Service 4/30/2009
LERCH BATES INC. $34,620 The purpose of the award is to advance the design and documentation of Phase 1C to provide a modern state of the art office environment for the Department of State headquarters. The northern section of the Department of State headquarters building is div
This spending item is part of a $3,831,151 allocation. See details
Public Buildings Service 7/14/2009
APPLIED FIRE PROTECTION ENGINEERING, INC. $18,500 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
VE CSIE JV $10,549 The purpose of this project is A/E support during the Pre-bidding phase for the CMS Energy Project. Public Buildings Service 10/30/2009
PARK TOWER METRO VIEW MANAGEMENT, L.P. $7,771 BUILDING TUNE UP Public Buildings Service 1/04/2010
COMFORT CONTROL, INC. $7,282 Preparation of a Study Report and multiple designs for the repairs of mechanical systems within the U.S. Tax Court located in Washington, D.C. in order to address occupant temperature complaints. Includes: (1) 'High Performance Green Building Limited Sco
This spending item is part of a $402,536 allocation. See details
Public Buildings Service 11/03/2009
CREATIVE SIGN SERVICE, INC. $6,512 (22) 8'h x 12'w x 1/8' bronze etched plaques with raised copy/border, black background, satin finish, and 16 point Garamond font. All copies to be centered horizontally. Copy for plaques provided by client. Plaques to be mounted with tape and silicone. Public Buildings Service 9/30/2011
UNITED STATES BULLET PROOFING, INC. $3,125 Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation. See details
Public Buildings Service 6/28/2010
SOUTHERN INSULATION, INC. $2,800 Chevron Energy Solutions is providing design-build construction services for the direct benefit and use of the United States Government through a procurement contract subject to the Federal Acquisition Regulation. The agreement is not a grant, cooperative
This spending item is part of a $12,194,385 allocation. See details
Public Buildings Service 3/15/2010