Barnstable County, Mass., funds by Transportation, Department of
Listing $22,705,612.47 in stimulus funds from Transportation, Department of for Barnstable
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CAPE COD REGIONAL TRANSIT AUTH | $6,353,225 | Federal Transit_Formula Grants Invest in public transportation by purchasing and deploying mobility management technology and strategies, purchasing and deploying an expanded fleet of energy efficient paratransit vehicles, development of innovative real-time customer information system | Federal Transit Administration | 5/27/2009 |
WOODS HOLE, MARTHA'S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY | $3,500,000 |
Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $3,283,638 | Highway Planning and Construction BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6A Perform resurfacing and related work on the state-owned sections of Route 6A, from milemarker 8.12 to milemarker 16.56, a distance of approximately 8.5 miles. Also included in the project is the re | Federal Highway Administration | 3/20/2009 |
LAWRENCE-LYNCH CORP. | $2,389,164 |
Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $1,756,160 | Highway Planning and Construction BOURNE- COLD PLANING AND RESURFACING ON ROUTE 6 (SCENIC HIGHWAY) Resurface Route 6 (Scenic Highway) from the intersection with Nightingale Pond Road to just east of the intersection with Bourndale Road. | Federal Highway Administration | 3/12/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $1,618,456 | Highway Planning and Construction DENNIS- RESURFACING & RELATED WORK ON ROUTE 6A Mill and resurface Route 6A from the Yarmouth Town Line to the Brewster Town Line, a distance of approximately 4.3 miles. | Federal Highway Administration | 5/12/2009 |
LAWRENCE-LYNCH CORP. | $1,083,097 |
Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
WOODS HOLE, MARTHA'S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY | $1,050,000 |
Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
CAPE COD REGIONAL TRANSIT AUTH | $635,322 | Federal Transit_Formula Grants Procurement and installation of an MBTA-compatible Electronic Fare System (EFS) on the Authority's Fixed Route Vehicles. The objective of this project is to provide interoperability and complete integration of the MBTA Charlie Card with a similar electron | Federal Transit Administration | 4/09/2010 |
WOODS HOLE, MARTHA'S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY | $450,000 |
Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
MARKINGS, INCORPORATED | $110,427 |
Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
BAXTER NYE ENGINEERING & SURVE | $76,020 |
The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation.
See details
|
Federal Aviation Administration | 3/29/2010 |
MARKINGS, INCORPORATED | $65,706 |
Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
Black & Boucher, LLC | $59,091 |
Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
Aguila Construction Company Inc | $52,577 |
Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
M O N Landscaping Inc | $41,400 |
Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
HORSLEY WITTEN GROUP, INC. | $33,270 |
The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation.
See details
|
Federal Aviation Administration | 3/29/2010 |
Aguila Construction Company Inc | $32,083 |
Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
M O N Landscaping Inc | $28,719 |
Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
Northeast Traffic Control Services Inc. | $27,455 |
Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $20,000 |
Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
Northeast Traffic Control Services Inc. | $17,879 |
Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
Garrity Asphalt Reclaiming, Inc. | $17,725 |
Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation.
See details
|
Federal Highway Administration | 7/01/2009 |
BARNSTABLE, TOWN OF | $4,200 |
The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation.
See details
|
Federal Aviation Administration | 3/29/2010 |