Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Barnstable County, Mass., funds by Transportation, Department of

Listing $22,705,612.47 in stimulus funds from Transportation, Department of for Barnstable

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CAPE COD REGIONAL TRANSIT AUTH $6,353,225 Federal Transit_Formula Grants Invest in public transportation by purchasing and deploying mobility management technology and strategies, purchasing and deploying an expanded fleet of energy efficient paratransit vehicles, development of innovative real-time customer information system Federal Transit Administration 5/27/2009
WOODS HOLE, MARTHA'S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY $3,500,000 Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation. See details
Federal Highway Administration 7/01/2009
MASSACHUSETTS, COMMONWEALTH OF $3,283,638 Highway Planning and Construction BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6A Perform resurfacing and related work on the state-owned sections of Route 6A, from milemarker 8.12 to milemarker 16.56, a distance of approximately 8.5 miles. Also included in the project is the re Federal Highway Administration 3/20/2009
LAWRENCE-LYNCH CORP. $2,389,164 Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation. See details
Federal Highway Administration 7/01/2009
MASSACHUSETTS, COMMONWEALTH OF $1,756,160 Highway Planning and Construction BOURNE- COLD PLANING AND RESURFACING ON ROUTE 6 (SCENIC HIGHWAY) Resurface Route 6 (Scenic Highway) from the intersection with Nightingale Pond Road to just east of the intersection with Bourndale Road. Federal Highway Administration 3/12/2009
MASSACHUSETTS, COMMONWEALTH OF $1,618,456 Highway Planning and Construction DENNIS- RESURFACING & RELATED WORK ON ROUTE 6A Mill and resurface Route 6A from the Yarmouth Town Line to the Brewster Town Line, a distance of approximately 4.3 miles. Federal Highway Administration 5/12/2009
LAWRENCE-LYNCH CORP. $1,083,097 Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation. See details
Federal Highway Administration 6/24/2009
WOODS HOLE, MARTHA'S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY $1,050,000 Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation. See details
Federal Highway Administration 7/01/2009
CAPE COD REGIONAL TRANSIT AUTH $635,322 Federal Transit_Formula Grants Procurement and installation of an MBTA-compatible Electronic Fare System (EFS) on the Authority's Fixed Route Vehicles. The objective of this project is to provide interoperability and complete integration of the MBTA Charlie Card with a similar electron Federal Transit Administration 4/09/2010
WOODS HOLE, MARTHA'S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY $450,000 Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation. See details
Federal Highway Administration 7/01/2009
MARKINGS, INCORPORATED $110,427 Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation. See details
Federal Highway Administration 7/01/2009
BAXTER NYE ENGINEERING & SURVE $76,020 The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation. See details
Federal Aviation Administration 3/29/2010
MARKINGS, INCORPORATED $65,706 Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation. See details
Federal Highway Administration 6/24/2009
Black & Boucher, LLC $59,091 Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation. See details
Federal Highway Administration 6/24/2009
Aguila Construction Company Inc $52,577 Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation. See details
Federal Highway Administration 6/24/2009
M O N Landscaping Inc $41,400 Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation. See details
Federal Highway Administration 6/24/2009
HORSLEY WITTEN GROUP, INC. $33,270 The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation. See details
Federal Aviation Administration 3/29/2010
Aguila Construction Company Inc $32,083 Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation. See details
Federal Highway Administration 7/01/2009
M O N Landscaping Inc $28,719 Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation. See details
Federal Highway Administration 7/01/2009
Northeast Traffic Control Services Inc. $27,455 Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation. See details
Federal Highway Administration 7/01/2009
MASSACHUSETTS, COMMONWEALTH OF $20,000 Highway Planning and Construction OAK BLUFFS TERMINAL, HYANNIS TERMINAL & WOODS HOLE CENTER DOLPHINS - FERRY BOAT RECONSTRUCTION/IMPROVEMENTS
This spending item is part of a $5,020,000 allocation. See details
Federal Highway Administration 7/01/2009
Northeast Traffic Control Services Inc. $17,879 Resufacing, drainage installation and general repairs to Rotue 6A in Dennis, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $1,319,749 allocation. See details
Federal Highway Administration 6/24/2009
Garrity Asphalt Reclaiming, Inc. $17,725 Resufacing, drainage installation and general repairs to Rotue 6A in Barnstable, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adj
This spending item is part of a $2,605,573 allocation. See details
Federal Highway Administration 7/01/2009
BARNSTABLE, TOWN OF $4,200 The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation. See details
Federal Aviation Administration 3/29/2010