Middlesex County, Mass., funds by Department of Veterans Affairs

Listing $16,382,489.64 in stimulus funds from Department of Veterans Affairs for Middlesex

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
LEGION CONSTRUCTION, INC. $6,805,100 Advanced Utility Metering System - VISN 1, TAS 36 0158. Work for the project will include but is not limited to general construction, alternations, mechanical work, fire protection work, utility systems, and necessary removal of existing structures and co Department of Veterans Affairs 5/18/2010
B.L. MECHANICAL, INC. $5,145,500 Advanced Utility Metering System - VISN 1, TAS 36 0158. Work for the project will include but is not limited to general construction, alternations, mechanical work, fire protection work, utility systems, and necessary removal of existing structures and co
This spending item is part of a $6,805,100 allocation. See details
Department of Veterans Affairs 5/18/2010
LEGION CONSTRUCTION, INC. $1,659,600 Advanced Utility Metering System - VISN 1, TAS 36 0158. Work for the project will include but is not limited to general construction, alternations, mechanical work, fire protection work, utility systems, and necessary removal of existing structures and co
This spending item is part of a $6,805,100 allocation. See details
Department of Veterans Affairs 5/18/2010
MONUMENT CONSTRUCTION, LLC $1,557,000 Correct Electrical Deficiencies, Bedford, MA Department of Veterans Affairs 4/30/2010
HUB ELECTRIC INC $269,848 Phase 1 - Project #650-07-107 - Replace Electrical Wiring, Modification #0002, dated 09/23/10 to decrease the estimate quantity of conduit required for new branch circuits per conduit tracking sheet and contrator's draft final invoice.
This spending item is part of a $875,266 allocation. See details
Department of Veterans Affairs 7/31/2009
VETERANS DEVELOPMENT CORPORATION, INC. $261,777 FURNISH LABOR, MATERIAL AND SUPERVISION TO UPGRADE HVAC SYSTEM IN ANIMAL RESEARCH FACILITY, BLDG 17
This spending item is part of a $298,974 allocation. See details
Department of Veterans Affairs 9/14/2009
Noyes Sheet Metal Inc $165,584 FURNISH LABOR, MATERIAL, TRANSPORTATION, EQUIPMENT, DISPOSAL AND SUPERVISION TO REPLACE AIR HANDLING UNIT EQUIPMENT (PHASE 2) AT BUILDING 1 MECHANICAL TOWER, WEST ROXBURY VAMC
This spending item is part of a $1,284,779 allocation. See details
Department of Veterans Affairs 3/29/2010
AMERICAN ENERGY MANAGEMENT CORPORATION $113,638 Provide all labor, materials, equipment, transportation, supervision and disposal necessary for the Chiller Upgrade at Jamaica Plain VAMC, MA.
This spending item is part of a $889,500 allocation. See details
Department of Veterans Affairs 6/30/2010
AMERICAN ENERGY MANAGEMENT CORPORATION $82,753 Provide all necessary supervision, labor, materials, transportation, disposal to replace the steam piping (Phase II) at the Jamaica Plain VAMC, MA.
This spending item is part of a $1,299,450 allocation. See details
Department of Veterans Affairs 6/17/2010
2020 Engineering, LLC $64,396 Turn-Key Solar Photovoltaic (PV) System at the New Mexico VA Health Care System located in Albuquerque, NM (NOTE: Original contract award $14,979,935.00 plus $5,316,891.76 Mod 0001 less removal of New Mexico Gross Receipts Tax $1,256,401.76 plus repair of
This spending item is part of a $19,401,536 allocation. See details
Department of Veterans Affairs 5/05/2010
Golden Leaf Landscape $59,000 Fisher House Additional Parking
This spending item is part of a $179,769 allocation. See details
Department of Veterans Affairs 3/30/2010
AMERICAN ENERGY MANAGEMENT CORPORATION $48,125 Provide all necessary supervision, labor, materials & equipment to modify the boiler Jamaica Plain VAMC, MA.
This spending item is part of a $4,258,000 allocation. See details
Department of Veterans Affairs 6/17/2010
MONUMENT CONSTRUCTION, LLC $31,158 Patient Lifts, Bedford, MA Department of Veterans Affairs 9/23/2010
Golden Leaf Landscape $23,000 Replace concrete slab, repair foundation wall at OH doors, damaged brick and missing mortar at the rop course, repair foundation wall @ OH doors missing mortar top course of brick/under stell facing of dock, repair wall around all loading odck doors, repa
This spending item is part of a $328,207 allocation. See details
Department of Veterans Affairs 7/08/2009
Bennett Cad Systems Inc $20,630 Furnish all labor, materials, transportation, equipment, disposal and supervision to renovate the Specialty Clinic at the Brockton VAMC Facility
This spending item is part of a $3,468,000 allocation. See details
Department of Veterans Affairs 9/20/2010
Bennett Cad Systems Inc $18,020 Provide all necessary supervision, labor, materials & equipment to modify the boiler Jamaica Plain VAMC, MA.
This spending item is part of a $4,258,000 allocation. See details
Department of Veterans Affairs 6/17/2010
Astro Welding & Fabricating, Inc. $11,403 FURNISH LABOR, MATERIAL, TRANSPORTATION, EQUIPMENT, DISPOSAL AND SUPERVISION TO REPLACE AIR HANDLING UNIT EQUIPMENT (PHASE 2) AT BUILDING 1 MECHANICAL TOWER, WEST ROXBURY VAMC
This spending item is part of a $1,284,779 allocation. See details
Department of Veterans Affairs 3/29/2010
Astro Welding & Fabricating, Inc. $8,665 Provide all labor, materials, equipment, transportation, supervision and disposal necessary for the Chiller Upgrade at Jamaica Plain VAMC, MA.
This spending item is part of a $889,500 allocation. See details
Department of Veterans Affairs 6/30/2010
MABBETT & ASSOCIATES, INC. $6,875 This project is a Design-Build project of a renewably fueled cogeneration combined heat and power system for the Canandaigua VA Medical Center in Canandaigua, NY. The new renewably fueled cogeneration system will provide the Canandaigua VAMC with two (2)
This spending item is part of a $15,465,214 allocation. See details
Department of Veterans Affairs 6/29/2010
AMERICAN ENERGY MANAGEMENT CORPORATION $6,593 Provide all necessary supervision, labor, materials, transportation, disposal to replace the steam piping (Phase II) at the Jamaica Plain VAMC, MA.
This spending item is part of a $556,527 allocation. See details
Department of Veterans Affairs 7/14/2010
Bennett Cad Systems Inc $6,490 Provide all labor, materials, equipment, transportation, supervision and disposal necessary for the Chiller Upgrade at Jamaica Plain VAMC, MA.
This spending item is part of a $889,500 allocation. See details
Department of Veterans Affairs 6/30/2010
Bennett Cad Systems Inc $4,830 Provide all necessary supervision, labor, materials, transportation, disposal to replace the steam piping (Phase II) at the Jamaica Plain VAMC, MA.
This spending item is part of a $556,527 allocation. See details
Department of Veterans Affairs 7/14/2010
Bennett Cad Systems Inc $4,205 FURNISH LABOR, MATERIAL, TRANSPORTATION, EQUIPMENT, DISPOSAL AND SUPERVISION TO REPLACE AIR HANDLING UNIT EQUIPMENT (PHASE 2) AT BUILDING 1 MECHANICAL TOWER, WEST ROXBURY VAMC
This spending item is part of a $1,284,779 allocation. See details
Department of Veterans Affairs 3/29/2010
Astro Welding & Fabricating, Inc. $4,200 Furnish all labor, materials, transportation, equipment, disposal and supervision to renovate the Specialty Clinic at the Brockton VAMC Facility
This spending item is part of a $3,468,000 allocation. See details
Department of Veterans Affairs 9/20/2010
Bennett Cad Systems Inc $4,100 Provide all necessary supervision, labor, materials, transportation, disposal to replace the steam piping (Phase II) at the Jamaica Plain VAMC, MA.