Norfolk County, Mass., funds by General Services Administration
Listing $780,267.28 in stimulus funds from General Services Administration for Norfolk
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ALARES LLC | $404,047 |
The purpose of the contract is to install electric, gas and water meters to monitor usage at nine federal buildings for the GSA.
This spending item is part of a $464,177 allocation.
See details
|
Public Buildings Service | 8/30/2010 |
Specialty Flooring Systems Inc | $241,735 |
The project will repair/replace Heating, Ventilating, and Air Conditioning systems, improve energy efficiency and provide exterior structural improvements including the replacement of windows. A new secure elevator will be added to improve Court safety.
This spending item is part of a $40,387,487 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
PRISM CONSULTING, INC. | $104,955 | Lighting upgrade project consisting of three proposals for upgrade of 864 fixtures. The lighting upgrade project was implemented at the GSA?s courthouse facility at Worcester, MA. The project was 100% installed and signed off by the facility manager in D | Public Buildings Service | 3/23/2010 |
R J Enterprises Inc | $22,000 |
The project will repair/replace Heating, Ventilating, and Air Conditioning systems, improve energy efficiency and provide exterior structural improvements including the replacement of windows. A new secure elevator will be added to improve Court safety.
This spending item is part of a $40,387,487 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
GEOSYNTEC CONSULTANTS INC | $5,010 | Design review of design document for photovoltaic ground array project. Task 1 is the design review of construction documents for storm water management compliance with energey and independence security act. Task 2 stormwater pollution prevention plan rev | Public Buildings Service | 11/18/2010 |
ATC GROUP SERVICES INC | $2,520 |
Window replacement - Fa+?ade Thermal Performance Improvement for the John F Kennedy Federal Building in Boston, Massachusetts. The work to be performed under the Contract includes updating the existing window and curtain wall replacement documents for co
This spending item is part of a $1,170,849 allocation.
See details
|
Public Buildings Service | 12/01/2009 |