Plymouth County, Mass., funds by Transportation, Department of
Listing $12,434,626.55 in stimulus funds from Transportation, Department of for Plymouth
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BROCKTON AREA TRANSIT AUTHORITY | $3,853,088 | Federal Transit_Formula Grants Investment in public transportaton, including three hybrid buses, two 35' transit coaches, one 30' cut-away coach, prevenative maintenance, operating assistance, capital parts, AVL & GPS for paratransit services, cameras for fixed route buses and repairs | Federal Transit Administration | 4/29/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $2,842,051 | Highway Planning and Construction BRIDGEWATER- MIDDLEBORO- RESURFACING & RELATED WORK ON ROUTES 18 & 28, Resurface Route 18/28 from Bridgewater Center to the Middleborough Rotary (intersection of Route 44) and make drainage improvements. | Federal Highway Administration | 3/12/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $2,811,883 | Highway Planning and Construction BROCKTON - RECONSTRUCTION OF ROUTE 27, PLEASANT STREET AT WEST STREET AND WESTGATE MALL Reconstruct Route 27, Pleasant Street, West Street and Westgate Mall Road. Work includes minor widening, geometric improvements, new traffic signals and interconn | Federal Highway Administration | 6/18/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $1,026,713 | Highway Planning and Construction Bridgewater - The purpose of this project is to reconstruct North Street from Pleasant Street to Village Gate Drive. The project will involve full depth reconstruction of North Street with approximately a four foot widening. A new sidewalk will be constru | Federal Highway Administration | 12/01/2009 |
MASSACHUSETTS, COMMONWEALTH OF | $603,016 | Highway Planning and Construction Wareham - The purpose of this project is to rehabilitate the existing pavement surface on Routes 6 & 28 in Wareham from just east of Mogan Way easterly to the Wareham/Bourne Town Line. | Federal Highway Administration | 12/01/2009 |
LAWRENCE-LYNCH CORP. | $505,515 |
Resurfacing, drainage installation and general repairs to Route 28, Wareham, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $507,630 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |
Plymouth & Brockton Street Railway Co Inc | $391,451 |
Formula Grants for Other Than Urbanized Areas This grant application requests $1,565,804.00 of Section 5311 Transit Capital Assistance Nonurbanized Apportionments - American Recovery and Reinvestment Act of 2009 (ARRA) funds for a program of projects for three public rural transit providers and two r r... Show more
This spending item is part of a $1,565,804 allocation.
See details
|
Federal Transit Administration | 10/01/2009 |
BROCKTON AREA TRANSIT AUTHORITY | $387,500 | Federal Transit_Formula Grants Investment in public transportation and keeping the system in a state of good repair by replacing outdated vehicle with new more energy efficient vehicle. Grant will fund oversight of production and spare parts. | Federal Transit Administration | 4/09/2010 |
Pk Associates Inc | $11,295 |
The purpose for this award is for the Barnstable Municipal Airport to site, obtain permits, design, construct, and equip a replacement Airport Traffic Control Tower (ATCT) at Barnstable Municipal Airport which meets the requirements of: G?? FAA Order 6480
This spending item is part of a $3,637,786 allocation.
See details
|
Federal Aviation Administration | 3/29/2010 |
Truax Corp | $2,115 |
Resurfacing, drainage installation and general repairs to Route 28, Wareham, MA. This specifically includes clearing and grubbing areas to facilitate construction, replacement of crushed stone for drainage revetment and/or water works foundations; adjustm
This spending item is part of a $507,630 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |