Suffolk County, Mass., funds by General Services Administration
Listing $54,198,564.68 in stimulus funds from General Services Administration for Suffolk
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PHYSICAL SECURITY, LLC | $23,120,592 |
The project consists of the exterior removal of existing punched windows and curtainwall on two twenty- four floor high rise tower and one four floor low rise tower. All work consists of removing the windows from the exterior during night time hours and
This spending item is part of a $29,398,788 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
WILLIAMS BUILDING COMPANY, INC. | $7,753,023 | Renovations to the tenth and eleventh floors, Phase A, B, C, D, including demolition and disposal mechanical VAV units, ductwork, partitons, lighting, all finishes, workstations. | Public Buildings Service | 6/29/2010 |
ALUTIIQ MANUFACTURING CONTRACTORS, LLC | $5,905,309 |
The project consists of the exterior removal of existing punched windows and curtainwall on two twenty- four floor high rise tower and one four floor low rise tower. All work consists of removing the windows from the exterior during night time hours and
This spending item is part of a $29,398,788 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
CCB, INC. | $2,532,865 | Furnish and install a new variable refrigerant flow system on the 9th and 10th floors of the Moakley Courthouse. | Public Buildings Service | 7/02/2010 |
APSI CONSTRUCTION MANAGEMENT | $1,666,843 | Provide Construction Management as Agent (CMa)services for the John F Kennedy Window Replacement Project in Boston, MA | Public Buildings Service | 3/25/2010 |
Burt Hill Inc. | $1,531,800 |
Architect/Engineer Services, Repair and Alterations, IRS Service Center, Andover, MA.
This spending item is part of a $5,076,360 allocation.
See details
|
Public Buildings Service | 6/02/2009 |
CONSTRUCTION & TELECOMMUNICATION SERVICES, INC. | $1,343,950 | Replacing two antiquated boilers in the Tip Oneil federal building in Boston with four new state of the art high efficient boilers. Currently, this project has been completed in full. | Public Buildings Service | 3/26/2010 |
SMITHGROUP, INC. | $1,065,572 |
Window replacement - Fa+?ade Thermal Performance Improvement for the John F Kennedy Federal Building in Boston, Massachusetts. The work to be performed under the Contract includes updating the existing window and curtain wall replacement documents for co
This spending item is part of a $1,170,849 allocation.
See details
|
Public Buildings Service | 12/01/2009 |
KGCI INC | $765,444 | Advanced Metering Eight federal buildings MA,NH,VT & ME. | Public Buildings Service | 3/30/2010 |
NSTAR ELECTRIC COMPANY | $726,773 | A design-build contract for the Energy Conservation Measures identified in the report based on the Retro-Commissioning Study. Energy Conservation Measures include: replace Building automation system, lighting power conditioning, lighting occupancy sensor | Public Buildings Service | 3/25/2010 |
CCI GROUP, LLC | $604,699 |
The purpose of the award was to eliminate problematic roof leaks at the areas around the small basin roofs at the McCormick Federal Building, Boston, MA.
This spending item is part of a $3,452,661 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
NSTAR ELECTRIC COMPANY | $565,614 | The project close out documents have been turned over to GSA for review/approval. The team will have project close out walk thru 7-8-11. This project will stay open because of the maintanance warranty contract. | Public Buildings Service | 3/24/2010 |
JACOBS TECHNOLOGY INC. | $502,760 | Provide a Senior Project Manager for one calendar year to support ARRA Limited Scope projects in GSA's New England Region (1). Provide management oversight, guidance and assistance to the GSA Regional Recovery Executive, Service Center Manager and Branch | Public Buildings Service | 11/09/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $483,726 | Phase III Construction Support Services for the Tip O'Neill Federal Building located in Boston, MA. | Public Buildings Service | 9/28/2010 |
TRICORE, INC. | $411,428 |
Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit
This spending item is part of a $1,293,609 allocation.
See details
|
Public Buildings Service | 3/10/2010 |
APEX CORP. | $388,129 |
Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit
This spending item is part of a $1,293,609 allocation.
See details
|
Public Buildings Service | 3/10/2010 |
TOWER GLASS COMPANY, INC. | $372,887 |
The project consists of the exterior removal of existing punched windows and curtainwall on two twenty- four floor high rise tower and one four floor low rise tower. All work consists of removing the windows from the exterior during night time hours and
This spending item is part of a $29,398,788 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
LYNNWELL ASSOCIATES, INC | $274,340 |
Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit
This spending item is part of a $1,293,609 allocation.
See details
|
Public Buildings Service | 3/10/2010 |
JACOBS PROJECT MANAGEMENT CO. | $252,024 | Commissioning Services (Cx) for the Modernization of the M.C. Smith Federal Building in Bangor, ME. Cx for GSA MC Smith Federal Building Cx for GSA MC Smith Federal Building | Public Buildings Service | 8/26/2010 |
H2O APPLIED TECHNOLOGIES LLC | $234,564 |
Installation of energy savings measure in 21 General Services Administration Region 7 owned and operated buildings. This project involves the installation, repair and/or replacement on major HVAC equipment, domestic water fixtures, irrigation systems, bui
This spending item is part of a $24,965,059 allocation.
See details
|
Public Buildings Service | 8/30/2010 |
Daedalus Projects, Inc | $220,029 |
Architect/Engineer Services, Repair and Alterations, IRS Service Center, Andover, MA.
This spending item is part of a $5,076,360 allocation.
See details
|
Public Buildings Service | 6/02/2009 |
BBIX, LLC | $208,970 |
Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to the evaluation of approximately 20,000 square feet of existing courtroom, office, open space and supp
This spending item is part of a $231,970 allocation.
See details
|
Public Buildings Service | 9/22/2009 |
XTEC, INCORPORATED | $207,448 |
Thomas P. O'Neill Federal Building Infrastructure and XNode to next generation upgrade in July 2012.
This spending item is part of a $390,035 allocation.
See details
|
General Services Administration | 11/08/2010 |
CONSTRUCTION & TELECOMMUNICATION SERVICES, INC. | $185,079 | Project consisted of demolition of approximately 20,000 sq feet of office space. Demo included, rugs, VCT, acoustical ceiling, electrical, gypsum wall board, metal stud framing, doors and hardware, HVAC and plumbing. Repairs associated with contract inclu | Public Buildings Service | 1/20/2010 |
METRIC ELECTRIC INC | $182,587 |
Thomas P. O'Neill Federal Building Infrastructure and XNode to next generation upgrade in July 2012.
This spending item is part of a $390,035 allocation.
See details
|
General Services Administration | 11/08/2010 |
BBIX, LLC | $156,171 | VRF Design John J. Moakley Federal Courthouse Boston, MA. | Public Buildings Service | 2/01/2010 |
CCB, INC. | $155,484 |
11th Floor renovation at the TP O'Neil Federal Building.
This spending item is part of a $278,251 allocation.
See details
|
Public Buildings Service | 9/10/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $150,000 | To provide escort services for the Moakley Construction Project in Boston, MA | Public Buildings Service | 9/28/2010 |
NITSCH ENGINEERING, INC. | $146,760 |
Architect/Engineer Services, Repair and Alterations, IRS Service Center, Andover, MA.
This spending item is part of a $5,076,360 allocation.
See details
|
Public Buildings Service | 6/02/2009 |
BBIX, LLC | $144,598 |
The scope of work is focused on building systems affecting energy use and indoor environment, including shell infiltration and heat loss for the Moakley Federal Courthouse loacted in Boston, MA.
This spending item is part of a $160,196 allocation.
See details
|
Public Buildings Service | 8/18/2009 |
GWYNN SYSTEMS, INC. | $138,200 |
Location: John J. Moakley Courthouse Boston, MA Project consists of installing carbon dioxide sensors for each courtroom; providing low flow fixtures for lavatories, water closets and sinks; installing enthalpy control sensors to control the outsid
This spending item is part of a $363,440 allocation.
See details
|
Public Buildings Service | 3/12/2010 |
TRICORE, INC. | $135,878 |
Location: John J. Moakley Courthouse Boston, MA Project consists of installing carbon dioxide sensors for each courtroom; providing low flow fixtures for lavatories, water closets and sinks; installing enthalpy control sensors to control the outsid
This spending item is part of a $363,440 allocation.
See details
|
Public Buildings Service | 3/12/2010 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $121,713 | Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building and design plan for protection, removal and conservation treatment. | Public Buildings Service | 9/30/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $100,000 | Escort Service for Energy Conservation Project in Boston, MA. | Public Buildings Service | 5/25/2010 |
JACOBS PROJECT MANAGEMENT CO. | $97,920 |
This award is for Construction Manager as Agent (CMa) services for the renovation of the Margaret Chase Smith Federal Building in Bangor, Maine. The CMa is responsible to ensure that the General Services Administration's (GSA) interests as the owner are
This spending item is part of a $3,188,760 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
R. G. VANDERWEIL ENGINEERS, LLP | $96,512 |
The purpose of this modification is to: 1) ADD funding for Architect/Engineering Design Services on Phase 2 of the Mary E. Switzer Building Modernization Project in Washington, DC. 2) INCORPORATE the attached mandated American Recovery and Reinvestment
This spending item is part of a $2,525,000 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $93,700 | Demolition of existing fan coil piping for the 10th floor fan coil units. Provide labor and materials necessary to repipe water feeds units within SSA renovation space work being done in Boston, MA. | Public Buildings Service | 3/18/2010 |
CAPITAL CARPET & FLOORING SPECIALISTS, INC. | $91,046 |
Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit
This spending item is part of a $1,293,609 allocation.
See details
|
Public Buildings Service | 3/10/2010 |
LYNNWELL ASSOCIATES, INC | $89,362 |
Location: John J. Moakley Courthouse Boston, MA Project consists of installing carbon dioxide sensors for each courtroom; providing low flow fixtures for lavatories, water closets and sinks; installing enthalpy control sensors to control the outsid
This spending item is part of a $363,440 allocation.
See details
|
Public Buildings Service | 3/12/2010 |
JACOBS TECHNOLOGY INC. | $79,920 | Provide Intergrated Planning Sessions with GSA staff managing the 17 High-Efficiency Limited Scope Projects in the New England Region (1). Identify key objectives, critical scheduling requirements, opportunities and constraints posed by the Region's 17 Li | Public Buildings Service | 10/26/2009 |
RICHARD D. KIMBALL CO. | $79,224 | RDK Engineers will provide commissioning agent services for the Thomas P. O'Neill Federal Building 10th and 11th Floor Renovation project. Services will include typical building systems commissioning. | Public Buildings Service | 9/21/2010 |
BROOKS RANGE CONTRACT SERVICES, INC. | $75,000 | Provide access to mechanical rooms, sub-contractor for fire alarm and sprinkler drain downs, minor repairs/alterations to systems and equipment. John F. Kennedy Federal Building Boston MA. | Public Buildings Service | 8/27/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $75,000 | To provide escorts for the Tip O'Neill Federal Building Project Support for the 9, 10, and 11 floors. For the mechanical rooms, system shut downs and sprinkler drain downs.Escorts for Fire Alarm Technician services associated with GSA contruction work and | Public Buildings Service | 5/27/2010 |
American Acoustical Contractors Corp. | $73,000 |
Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit
This spending item is part of a $1,293,609 allocation.
See details
|
Public Buildings Service | 3/10/2010 |
BBIX, LLC | $71,731 | This project involves providing Construction Inspection Services and contract administration of the Moakley FCH VRF project. | Public Buildings Service | 5/17/2010 |
BBIX, LLC | $59,989 | Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to the evaluation of approximately 20,000 square feet of existing courtroom, office, open space and supp | Public Buildings Service | 6/23/2009 |
Unity Construction Inc | $55,666 |
Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit
This spending item is part of a $1,293,609 allocation.
See details
|
Public Buildings Service | 3/10/2010 |
MILL CITY ENVIRONMENTAL CORPORATION | $41,939 | This was a negotiated price award for work to be done at the Williams Building located at 408 Atlantic Ave in Boston, MA 02110. | Public Buildings Service | 9/20/2010 |
BBIX, LLC | $40,926 | Renovations to the first floor of the St. Albans Federal Building for tenant fit out for DOS and DS. | Public Buildings Service | 10/09/2009 |
PAGE CONSERVATION, INC. | $37,725 | Conservation Treatment of the Robert Motherwell artwork entitled: New England Elegy(FA897) located in the JFK Federal Building in Boston, MA. The conservation work was originally to be performed in conjunction with installation of new windows. GSA has | Public Buildings Service | 11/09/2010 |
MID ATLANTIC CASU | $36,589 | Award was incorrectly intended to reimburse for administrative assistant services using ARRA funding. As confirmed by Cynthia Carroll, GSA Regional CFO, no ARRA funding was used and the correcting contract modification was signed on 10/5/11. | Public Buildings Service | 9/02/2011 |
Capobianco & Associates Inc | $33,085 |
This award is for Construction Manager as Agent (CMa) services for the construction of the United States Land Port of Entry (LPOE) in Van Buren, Maine. The award is for the design stage and construction phase services. During the design phase the CMa pe
This spending item is part of a $2,905,611 allocation.
See details
|
Public Buildings Service | 1/26/2010 |
Sladen Feinstein Integrated Lighting Inc | $32,313 |
Architect/Engineer Services, Repair and Alterations, IRS Service Center, Andover, MA.
This spending item is part of a $5,076,360 allocation.
See details
|
Public Buildings Service | 6/02/2009 |
WILLIAM LOWE & SONS CORP. | $24,375 | Provided the labor, trucks, equipment and materials necessary to remove excess from various areas on the 10th & 11th floors at the Tip O'Neill Building in Boston using American Recovery Reinvestment Act funds. | Public Buildings Service | 6/23/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $22,000 | Tip O'Neill Phase II Project for Construction Support Services to Install plywood over existing raised floor, demolition and installation of new carpet tile, electrical and Telephone Data and clean up for 1 PC temporary relocation to the first floor room | Public Buildings Service | 1/11/2011 |
EMCOR GOVERNMENT SERVICES, INC. | $19,962 | Provide support for an energy study for BBIX for the Retro-Commissioning study. EMCOR will provide personnel, building automation system and boiler technician and air balancer | Public Buildings Service | 3/24/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $15,760 | Installing piping for three (3) new fan coil units. Contractor will drain down column to column In 3 locations on the 10th Floor of the building Install 3 connection tees and isolation ball valves at each tee. Pipe, hang, insulate and fire stop supply an | Public Buildings Service | 3/29/2012 |
BBIX, LLC | $15,097 |
The scope of work is focused on building systems affecting energy use and indoor environment, including shell infiltration and heat loss for 4 federal courthouses and buildings specifically Rudman and Cleveland FCH in Concord, NH; Burlington FB in Burling
This spending item is part of a $140,958 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $15,000 | Provide Escort service and site support for Boiler Project | Public Buildings Service | 9/15/2010 |
SECURITY CONSTRUCTION SERVICES, INC. | $10,000 | Provide support for ARRA projects at the Williams Coast Guard Building for escort and utility shut downs | Public Buildings Service | 3/04/2011 |
EMCOR GOVERNMENT SERVICES, INC. | $10,000 | Installation of two dedicated circuits for the 1PC copier and 1PC shredder | Public Buildings Service | 1/31/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $10,000 | Providing Technical Support for Fire Alarm Testing in the Tip O'Neil Federal Courthouse Building. | Public Buildings Service | 4/09/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $10,000 | Phase I O'Neill FB - miscellaneous work associated with the GSA move from the 9th to the 11th Floor. | Public Buildings Service | 12/14/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $9,000 | This is a Solar Thermo project for the Thomas P. O'Neill Federal Building located in Boston, MA to provided techincal Operations and Maintenance Support. | Public Buildings Service | 9/20/2010 |
BBIX, LLC | $6,614 |
Energy Conservation Measures at Gignoux CH, Portland ME and Burlington CH / Federal Building, Burlington, VT. In accordance with Design Criteria for MEP services Performance Specifications dated December 18, 2010.
This spending item is part of a $40,622 allocation.
See details
|
Public Buildings Service | 1/25/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $5,000 | Provided Technical Support and escort services for Boiler Repairs in Tip O'Neil Federal Courthouse Building | Public Buildings Service | 5/25/2010 |
PAGE CONSERVATION, INC. | $4,520 | This project was awarded to assess, remove, conserve and reinstall the Robert Motherwell mural at the John F. Kennedy Federal building in Boston Massachuesetts. This GSA Task Order is now for assessment only. The assessment has been performed and the t | Public Buildings Service | 8/24/2010 |
LAND ACQUISITIONS, INC. | $2,370 | Planning Meeting for Vanburen LPOE project | Public Buildings Service | 2/22/2010 |
EMCOR GOVERNMENT SERVICES, INC. | $2,336 | Install replacement glass in damaged window on the 9th floor. Services require use of Fish window services to remove seal on the exterior of the building prior to removal In the Tip O'Neil Building in Boston, MA. | Public Buildings Service | 9/10/2010 |
BBIX, LLC | $624 | Fire Protection Engineering Services Regarding the Garage Lighting at the J. Moakley Courthouse Boston, MA | Public Buildings Service | 6/30/2010 |
BBIX, LLC | $0 |
Renovation of GSA's PBS Headquarters for Region I on the 10th and 11th floors at the Thomas P. O'Neill Building.
This spending item is part of a $843,238 allocation.
See details
|
Public Buildings Service | 10/13/2009 |