Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Genesee County, Mich., funds by Transportation, Department of

Listing $19,933,911.84 in stimulus funds from Transportation, Department of for Genesee

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MASS TRANSPORTATION AUTHORITY INC $7,985,140 Federal Transit_Formula Grants Invest in public transportation by installing intelligent transportation system software and equipment, performing preventive maintenance, and purchasing and installing signage and security equipment. Federal Transit Administration 2/16/2010
MASS TRANSPORTATION AUTHORITY INC $7,985,000 Federal Transit_Formula Grants Invest in public transportation by purchasing a new two-way mobile radio system, installing intelligent transportation system software and equipment, performing preventive maintenance, and purchasing and installing signage and security equipment. Federal Transit Administration 6/25/2009
MASS TRANSPORTATION AUTHORITY INC $2,200,000 Capital Assistance Program for Reducing Energy Consumption and Greenhouse Gas Emissions Invest in public transportation through purchase of ultra-light zero emissions buses Federal Transit Administration 3/22/2010
BMS CAT, INC. $600,000 Contractor shall furnish personnel, equipment, supplies and supervision required for the emergency restoration of fire damage at the Flint Airport Federal Aviation Administration 4/15/2010
County of Genesee $241,361 Highway Planning and Construction Pavement removal, concrete pavement, concrete pavement repair, guardrail replacement, hot mix asphalt approach
This spending item is part of a $1,536,295 allocation. See details
Federal Highway Administration 5/11/2009
WALTER, WILLIAM E INC $221,398 ATCT Remediation Work Federal Aviation Administration 6/09/2010
County of Genesee $176,419 Highway Planning and Construction Pavement removal, concrete pavement. concrete pavement repairs, cold mill hot mix asphalt & resurface & earthwork
This spending item is part of a $1,356,637 allocation. See details
Federal Highway Administration 5/14/2009
BURTON, CITY OF $94,286 Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $725,856 allocation. See details
Federal Highway Administration 12/22/2009
County of Genesee $93,279 Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, rubblizing, base crushing and shaping, drainage and guardrail
This spending item is part of a $624,753 allocation. See details
Federal Highway Administration 6/23/2009
County of Genesee $88,519 Highway Planning and Construction Cold milling and hot mix asphalt resurfacing, bridge deck overlay, concrete bridge approach, guardrail and earth work
This spending item is part of a $607,703 allocation. See details
Federal Highway Administration 12/22/2009
FLINT, CITY OF $85,100 Highway Planning and Construction Hot mix asphalt pavement, concrete curb and gutter, water main and sanitary, signal work and guardrail
This spending item is part of a $2,315,955 allocation. See details
Federal Highway Administration 8/18/2009
BMS CAT, INC. $59,797 Contractor shall furnish personnel, equipment, supplies and supervision required for the emergency restoration of fire damage at the Flint Airport Federal Aviation Administration 4/15/2010
MASS TRANSPORTATION AUTHORITY INC $50,590 Formula Grants for Other Than Urbanized Areas This grant provides funds for operating assistance, replacement vehicles which have reached their useful life and have no other source of funding, equipment purchases, facility improvement/greening projects identified by energy audits funded in the ARRA P... Show more
This spending item is part of a $12,443,615 allocation. See details
Federal Transit Administration 3/03/2010
SWARTZ CREEK, CITY OF $32,505 Highway Planning and Construction Cold mill hot mix asphalt and resurface, pavement repairs and earth work
This spending item is part of a $251,248 allocation. See details
Federal Highway Administration 7/02/2009
FLINT, CITY OF $20,518 Highway Planning and Construction Hot mix asphalt pavement, concrete curb and gutter, water main and sanitary, signal work and guardrail
This spending item is part of a $2,315,955 allocation. See details
Federal Highway Administration 8/18/2009