Ingham County, Mich., funds by Transportation, Department of
Listing $1,069,309,854.33 in stimulus funds from Transportation, Department of for Ingham
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $196,503,208 | High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants Development of work plan, preliminary engineering, final design, track rehabilitation and train control/signal work on the high speed rail corridor between Kalamazoo and Dearborn, Michigan. | Federal Railroad Administration | 10/07/2011 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $56,150,066 | Highway Planning and Construction Hot mix asphalt and concrete reconstruction and widening and structure rehabilitation | Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $46,802,075 | Highway Planning and Construction Interchange reconstruction, roadway widening, replacement of 4 bridges, construction of screening walls, retaining | Federal Highway Administration | 4/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $44,809,061 | Highway Planning and Construction I-96 Pavement Reconstruction | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $31,470,300 | Highway Planning and Construction Design/Build reconstruction of I-94 | Federal Highway Administration | 10/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $30,000,000 | Highway Planning and Construction I-94/I-69 Black River Bridge Replacement | Federal Highway Administration | 12/22/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $28,687,610 | Highway Planning and Construction Road reconstruction and structure replacement | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $19,523,521 | Highway Planning and Construction Design Build reconstruction of 4 bridge structures on I-475 from the south interchange to I-69 including Hill Road and Bristol Road over I-475 and I-475 over MAP | Federal Highway Administration | 9/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $19,479,645 | Highway Planning and Construction Unbonded concrete overlay | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $19,217,012 | Highway Planning and Construction Road reconstruction and interchange ramps, drainage, culverts, guardrail and permanent signing | Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $15,825,490 | Highway Planning and Construction Concrete reconstruction, widening, drainage and safety improvements, deck and bridge replacements | Federal Highway Administration | 9/03/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $14,711,195 | Highway Planning and Construction Hot mix asphalt cold milling and two course overlay | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $13,617,172 | Highway Planning and Construction Hot mix asphalt reconstruction, widening, storm sewer, water main, drainage and bridge replacement. | Federal Highway Administration | 1/28/2003 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $13,260,674 | Highway Planning and Construction Cold milling concrete, hot mix asphalt resurfacing, shoulder reconstruction, water main, storm sewer, signing | Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $11,857,013 | Highway Planning and Construction Deck replacement, deck patch, joint replacement, steel repairs, pin and hangers, painting, substructure repairs | Federal Highway Administration | 5/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $11,372,044 | Highway Planning and Construction Patch and Overlay | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $10,705,177 | Highway Planning and Construction Hot mix asphalt multiple course overlay, joint repairs, bridge clearance corrections, super corrections, safety | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $10,593,585 | Highway Planning and Construction Concrete barrier, slope protection and landscaping | Federal Highway Administration | 10/27/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $7,849,833 | Highway Planning and Construction Concrete reconstruction, cross over reconstruction, concrete curb and gutter, drainage, traffic signal upgrade, signing | Federal Highway Administration | 11/05/2009 |
CAPITAL AREA TRANSPORTATION AUTHORITY | $7,133,486 | Federal Transit_Formula Grants Invest in public transportation by purchasing new 40ft hybrid bus, new small buses, renovate and expand the bus storage facility, purchase adjacent property for bus storage facility expansion, rehabilitate large buses, make improvements to a boarding cent | Federal Transit Administration | 7/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $7,000,000 | Highway Planning and Construction Upgrade existing system - ITS Infrastructure Device Replacement and Integration | Federal Highway Administration | 5/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $6,401,262 | Highway Planning and Construction Structure Replacement | Federal Highway Administration | 8/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $6,229,867 | Highway Planning and Construction Hot mix asphalt cold milling and multiple course resurfacing drainage and guardrail improvements | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $6,196,433 | Highway Planning and Construction Cold milling hot mix asphalt and resurfacing, concrete pavement repair, guardrail replacement, sidewalk ramps | Federal Highway Administration | 8/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $5,789,129 | Highway Planning and Construction Hot mix asphalt reconstruction, sewer separation, water main curb & gutter, drainage, safety and signal improvements | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $5,706,881 | Highway Planning and Construction Concrete pavement repair and hot mix asphalt overlay | Federal Highway Administration | 5/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $5,027,105 | Highway Planning and Construction Freeway reconstruction | Federal Highway Administration | 9/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,980,019 | Highway Planning and Construction Hot mix asphalt cold milling and two course overlay and joint repairs | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,655,955 | Highway Planning and Construction Reconstruction of I-275 Trail - Design Build | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,600,000 | Highway Planning and Construction Bridge replacement and widening. | Federal Highway Administration | 9/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,561,260 | Highway Planning and Construction Hot mix asphalt mill and overlay, ADA sidewalk ramps, structure adjustments, curb repair, and signal removal. | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,404,955 |
Highway Planning and Construction Resurface Road
This spending item is part of a $5,103,729 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,293,286 | Highway Planning and Construction Soundwalls construction and earth beam construction | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,278,653 | Highway Planning and Construction Bituminous overlay on M-3 Sunnyview to Cass | Federal Highway Administration | 7/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $4,099,773 | Highway Planning and Construction HMA crush & shape | Federal Highway Administration | 1/28/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,967,886 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $4,562,400 allocation.
See details
|
Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,850,080 | Highway Planning and Construction 52.76 miles of shoulder widening where existing paved shoulders are less than 8 feet in width. | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,682,329 | Highway Planning and Construction hot mix asphalt cold milling and resurfacing including detail 7 and 8 joint repairs | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,657,579 | Highway Planning and Construction Deck replacement, deck patch, joint replacement, steel repairs, pin and hangers, painting, substructure repairs | Federal Highway Administration | 5/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,476,958 | Highway Planning and Construction Hot mix asphalt cold milling and single course overlay | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,433,921 | Highway Planning and Construction Intersection reconstruction including construction of a roundabout, roadway reconstruction, traffic signal upgrades | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,429,692 |
Highway Planning and Construction Cold milling hot mix asphalt pavement and resurfacing
This spending item is part of a $3,942,896 allocation.
See details
|
Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,396,705 | Highway Planning and Construction Intersection reconstruction | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,374,881 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, centerline corrugations, pavement markings, sidewalk ramp retrofit. | Federal Highway Administration | 9/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,332,348 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, hot mix asphalt, resurfacing, ramp extensions, bridge approaches, guardrail | Federal Highway Administration | 7/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,307,032 | Highway Planning and Construction Installation of cable median barrier and guardrail upgrades | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,267,100 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, joint and crack repairs and bridge railing upgrades | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,259,505 | Highway Planning and Construction HMA Coldmill and Resurface | Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,228,966 |
Highway Planning and Construction Widen from 2 to 5 lanes
This spending item is part of a $3,867,492 allocation.
See details
|
Federal Highway Administration | 9/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,161,887 | Highway Planning and Construction Mill and resurface | Federal Highway Administration | 8/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,118,815 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $3,060,406 | Highway Planning and Construction Bridge replacement and culvert replacement. | Federal Highway Administration | 9/03/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,909,719 | Highway Planning and Construction Hot mix asphalt cold milling and overlay, ADA sidewalk ramps structures adjustment, and curb repair | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,863,042 | Highway Planning and Construction Concrete pavement repair, curb and gutter repair | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,806,400 | High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants City of Ann Arbor will complete the PE and the required environmental documentation and approvals to support final design of and construction of the proposed Ann Arbor rail station. | Federal Railroad Administration | 8/29/2011 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,774,492 | Highway Planning and Construction Superstructure replacement with widening, approach work, and maintaining traffics | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,679,688 | Highway Planning and Construction Structure replacement | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,613,681 | Highway Planning and Construction Bridge widening, substructure repair and deck replacement. | Federal Highway Administration | 9/03/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,606,740 | Highway Planning and Construction Install Dynamic Message Signs | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,593,900 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, pavement repairs, trench and reconstruct shoulders, lane upgrades, | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,576,015 | Highway Planning and Construction Hot mix asphalt overlay, shoulder trenching, hot mix asphalt shoulder construction, and bridge deck repairs | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,541,341 | Highway Planning and Construction Cold milling, pavement joint and crack repair, two course resurface and permanent pavement markings | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,518,599 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/24/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,503,081 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing and pavement reconstruction, traffic signal modifications, water | Federal Highway Administration | 6/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,496,218 |
Highway Planning and Construction Cold milling hot mix asphalt pavement and hot mix asphalt resurfacing
This spending item is part of a $2,870,051 allocation.
See details
|
Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,489,776 | Highway Planning and Construction Structure replacement | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,479,771 | Highway Planning and Construction Cold Milling, single course HMA resurface, and permanent pavement markings | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,460,346 |
Highway Planning and Construction Reconstruction of Croswell Avenue to M-37
This spending item is part of a $2,787,544 allocation.
See details
|
Federal Highway Administration | 9/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,449,807 | Highway Planning and Construction Hot mix asphalt resurface, concrete patching, drainage structure adjust, pavement markings, traffic signals upgrade | Federal Highway Administration | 8/03/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,406,903 | Highway Planning and Construction Cold mill/HMA resurface with joint repair | Federal Highway Administration | 6/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,331,959 | Highway Planning and Construction Bridge Replacement. | Federal Highway Administration | 12/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,308,760 | Highway Planning and Construction Mill and HMA overlay | Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,210,337 |
Highway Planning and Construction Hot mix asphalt pavement, concrete curb and gutter, water main and sanitary, signal work and guardrail
This spending item is part of a $2,315,955 allocation.
See details
|
Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,178,443 |
Highway Planning and Construction Resurface road
This spending item is part of a $2,504,684 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,093,831 | Highway Planning and Construction Pavement repairs, cold milling and resurfacing, shoulder reconstruction and pavement markings | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,089,235 | Highway Planning and Construction Cold milling hot mix asphalt and concrete pavement, hot mix asphalt pavement, concrete pavement repairs | Federal Highway Administration | 6/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,040,722 | Highway Planning and Construction Renovate rest area, upgrade parking area, utilities and site work | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,023,440 | Highway Planning and Construction Hot mix asphalt coldmilling, pavement repairs, overlay, signal upgrades, sidewalks and ADA ramps | Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $2,022,629 | Highway Planning and Construction Construction of a non-motorized bridge including hot mix asphalt paving, retaining walls, and approach work | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,964,000 | Highway Planning and Construction Hot mix asphalt surfacing including aggregate base, storm sewer, concrete pavement, concrete curb and gutter, | Federal Highway Administration | 2/02/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,951,169 |
Highway Planning and Construction Resurface
This spending item is part of a $2,232,914 allocation.
See details
|
Federal Highway Administration | 2/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,882,114 |
Highway Planning and Construction Resurface road
This spending item is part of a $2,163,906 allocation.
See details
|
Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,874,469 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, and guardrail | Federal Highway Administration | 8/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,844,073 | Highway Planning and Construction Reconstruction, hot mix asphalt pavement, concrete curb and gutter, storm sewer, concrete sidewalk, and earthwork | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,843,722 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 5/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,837,630 | Highway Planning and Construction Hot mix asphalt coldmilling and overlay | Federal Highway Administration | 9/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,832,013 | Highway Planning and Construction Patch and overlay with intermittent curb and gutter repair, traffic signal and ADA improvements | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,799,534 | Highway Planning and Construction Hot mix asphalt cold milling and surfacing and aggregate shoulders | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,749,000 | Highway Planning and Construction Cracking and seating concrete pavement, cold milling concrete pavement, concrete pavement repairs, hot mix | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,724,905 | Highway Planning and Construction Deck replacement, structural steel and substructure repair painting, pedestrian fence and utility relocation | Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,714,610 | Highway Planning and Construction Deck replacement, structural steel and substructure replacement, painting utility relocation, pin and hanger | Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,708,231 | Highway Planning and Construction Hot mix asphalt paving for a non-motorized path, grading, aggregate base, wooden boardwalk and retaining walls | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,706,752 | Highway Planning and Construction Concrete restoration, diamond grinding, crack sealing and ramp extension | Federal Highway Administration | 5/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,697,447 | Highway Planning and Construction Providing Design Build services for 10 Dynamic Message Sign sites | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,693,881 |
Highway Planning and Construction Building a mile of paved pathway for cyclists, walkers, and joggers.
This spending item is part of a $1,946,988 allocation.
See details
|
Federal Highway Administration | 10/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,688,274 |
Highway Planning and Construction Streetscape Improvements
This spending item is part of a $1,950,000 allocation.
See details
|
Federal Highway Administration | 6/21/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,651,287 | Highway Planning and Construction Deep overlay,deck patch, joint replace, pin and hangers, substructure, thrie beam retrofit, fascia & zone paint, paint | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,648,382 | Highway Planning and Construction Resurfacing 8.92 miles on M-46 from the Gratiot/Montcalm County line easterly to west of US-127BR. | Federal Highway Administration | 9/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,558,067 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,510,820 | Highway Planning and Construction Road reconstruction, including widening, concrete curb and gutter, sidewalk, sidewalk ramps, storm sewer,asphalt paving | Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,489,003 | Highway Planning and Construction Streetscape | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,480,559 | Highway Planning and Construction US-2 / US-41 Intersection Reconstruction | Federal Highway Administration | 6/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,478,323 | Highway Planning and Construction Providing Design Build services for 12 Environmental Sensor Station sites | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,429,963 | Highway Planning and Construction Hot mix asphalt shoulder construction, clearing, slope restoration and shoulder corrugations. | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,428,909 | Highway Planning and Construction Cold milling and hot mix asphalt resurfacing at 1.5 depth | Federal Highway Administration | 6/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,414,742 | Highway Planning and Construction Deep concrete overlay, pin and hanger replacement, zone painting, structural steel repair and approach work | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,409,246 | Highway Planning and Construction Eastbound Passing Relief Lane (truck climbing lane) | Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,402,974 | Highway Planning and Construction Hot mix asphalt cold milling and overlay, concrete pavement repairs, earthwork | Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,384,610 | Highway Planning and Construction Signal Modernization | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,369,375 | Highway Planning and Construction Sidewalk Installation and Proposed Pedestrian Bridge | Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,355,963 |
Highway Planning and Construction Hot mix asphalt road resurfacing
This spending item is part of a $1,558,683 allocation.
See details
|
Federal Highway Administration | 9/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,299,810 | Highway Planning and Construction Mill & Resurface with Joints | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,294,934 |
Highway Planning and Construction Pavement removal, concrete pavement, concrete pavement repair, guardrail replacement, hot mix asphalt approach
This spending item is part of a $1,536,295 allocation.
See details
|
Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,284,955 | Highway Planning and Construction Hot mix asphlat cold milling and resurfacing | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,284,335 | Highway Planning and Construction Roadway reconstruction, pavement removal, earth excavation, aggregate base, hot mix asphalt cold milling | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,276,973 | Highway Planning and Construction HMA resurfacing, cold milling, trenching, crack repair, gepsynthetic fabric, ditching, tree removals | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,273,578 | Highway Planning and Construction Hot mix asphalt road reconstruction including, storm sewer, concrete curb and gutter, watermain, concrete | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,257,647 | Highway Planning and Construction Hot mix asphalt base crushing, shaping, cold milling, resurfacing, ramp realignment, misc safety and drainage | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,250,000 | Highway Planning and Construction Concrete pavement with integral curb, pavement removal, aggregate base, drainage, sidewalk ADA ramps, signing | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,248,008 | Highway Planning and Construction Hot mix asphalt crushing and shaping and resurfacing with guardrail upgrading | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,180,758 | Highway Planning and Construction Hot mix asphalt cold milling resurface, base repairs, earth work and traffic loops. | Federal Highway Administration | 8/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,180,217 |
Highway Planning and Construction Pavement removal, concrete pavement. concrete pavement repairs, cold mill hot mix asphalt & resurface & earthwork
This spending item is part of a $1,356,637 allocation.
See details
|
Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,179,301 | Highway Planning and Construction Deck replacement, steel repair, substructure repair, fencing, abandoned railroad bridge removals and approach work | Federal Highway Administration | 5/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,168,846 | Highway Planning and Construction Resurface to improve the driving quality of the roadway. | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,157,822 | Highway Planning and Construction Drainage structure work, hot mix asphalt resurfacing | Federal Highway Administration | 7/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,144,923 | Highway Planning and Construction Hot mix asphalt resurfacing and shoulders | Federal Highway Administration | 4/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,128,751 | Highway Planning and Construction Concrete reconstruction, storm sewer, concrete sidewalk, concrete sidewalk ramps, and irrigation system restoration | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,125,833 | Highway Planning and Construction Hot mix asphalt cold milling, joint and crack repairs, hot mix asphalt overlay, concrete curb and gutter, drainage | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,123,828 |
Highway Planning and Construction Cold milling hot mix asphalt and resurfacing, pavement rehabilitation, concrete pavement repair, concrete curb
This spending item is part of a $1,300,000 allocation.
See details
|
Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,121,452 | Highway Planning and Construction Road rehabilitation and widening, pavement removal, earth excavation, aggregat base, cold milling hot mix asphalt and | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,116,941 | Highway Planning and Construction Hot mix asphalt cold milling and overlay, concrete pavement repairs, aggregate shoulders, guardrail | Federal Highway Administration | 8/27/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,106,802 |
Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing, pavement rehabilitatin, concrete pavement repair, concrete sidewalk
This spending item is part of a $1,272,440 allocation.
See details
|
Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,104,500 | Highway Planning and Construction Culvert rehabilitation | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,100,000 | Highway Planning and Construction Concrete resurfacing, including cold milling concrete whitetopping, concrete sidewalk ramps | Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,100,000 | Highway Planning and Construction Earth excavation, aggregate base, cold milling hit mix asphalt and resurfacing, drainage improvements | Federal Highway Administration | 7/16/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,085,791 |
Highway Planning and Construction Resurface
This spending item is part of a $1,253,939 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,062,349 | Highway Planning and Construction Hot mix asphalt shoulder construction, guardrail clearing, slope restoration and shoulder corrugations | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,049,297 | Highway Planning and Construction Construction of 8 ESS sites and update 4 existing ESS sites | Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,039,988 | Highway Planning and Construction Pumphouse Rehabilitation | Federal Highway Administration | 7/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,033,000 | Highway Planning and Construction Concrete pavement cracking and seating, cold milling hot mix asphalt and concrete, concrete pavement repairs, | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,032,373 |
Highway Planning and Construction Rehabilitate bridge including a superstructure replacement
This spending item is part of a $1,200,000 allocation.
See details
|
Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,031,000 | Highway Planning and Construction Cold milling concrete pavement, concrete pavement repairs | Federal Highway Administration | 12/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,016,309 |
Highway Planning and Construction Cold milling concrete pavement, concrete pavement repairs, hot mix asphalt resurfacing, concrete curb and gutter
This spending item is part of a $1,153,713 allocation.
See details
|
Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,008,841 |
Highway Planning and Construction Concrete pavement repair, diamond grinding, drainage repairs sidewalk ramps and pavement markings
This spending item is part of a $1,155,578 allocation.
See details
|
Federal Highway Administration | 7/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,008,280 | Highway Planning and Construction Concrete patching and hot mix asphalt overlay | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $1,003,692 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, shoulders, guardrail, joints, drainage upgrades, and signing | Federal Highway Administration | 2/24/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $997,046 |
Highway Planning and Construction Resurface, rehab or restore
This spending item is part of a $1,168,000 allocation.
See details
|
Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $996,268 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, drainage improvements, curb and gutter, bridge rehabilitation, slope | Federal Highway Administration | 1/25/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $996,127 | Highway Planning and Construction Railing and expansion joint replacements and deck repairs | Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $986,000 | Highway Planning and Construction Pavement removal, earth excavation, aggregate base, culvert and sewer work, drainage structure work, hot mix asphalt | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $960,584 | Highway Planning and Construction This funding will be used to provide internships to high school students interested in becoming construction engineers; stipends to wounded veterans working for the Michigan Department of Transportation; implementing the Transportation and Civil Engineers | Federal Highway Administration | 5/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $958,409 | Highway Planning and Construction M-6, I-96 Fiber Optic cable installation | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $952,666 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing and aggregate shoulders | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $942,473 | Highway Planning and Construction Structure removal | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $940,292 | Highway Planning and Construction Hot mix asphalt crushing and shaping | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $938,000 | High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants Stablilization and renovation of historic Jackson Amtrak Depot and Express Building. | Federal Highway Administration | 11/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $935,890 | Highway Planning and Construction Nonmotorized Path | Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $934,074 | Highway Planning and Construction Concrete reconstruction, storm and sanitary sewer, watermain earthwork, and signal upgrade. | Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $932,630 | Highway Planning and Construction Overband crack fill, chip seal, approach work, shoulder and pavement repairs | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $926,918 |
Highway Planning and Construction Replace superstructure with minor approach work, hot mix asphalt paving and guardrail placement
This spending item is part of a $1,070,230 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $920,282 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete ultra thin overlay. concrete sidewalk ramps and pavement | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $900,000 | Highway Planning and Construction Hot mix asphalt cold milling, hot mix asphalt paving, sidewalk ramps, pavement markings, and traffic signal | Federal Highway Administration | 4/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $897,732 | Highway Planning and Construction Full depth concrete pavement repairs and longitudinal joint sealing | Federal Highway Administration | 4/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $896,143 |
Highway Planning and Construction Resurface
This spending item is part of a $1,030,039 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $895,094 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $894,236 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing with joint repairs | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $879,000 | Highway Planning and Construction Concrete pavement craking and seating, cold milling concrete pavement, concrete pavement repairs, hot mix asphalt | Federal Highway Administration | 6/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $874,005 | Highway Planning and Construction Hot mix asphalt resurfacing and aggregate shoulders work. | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $864,000 | Highway Planning and Construction Cold milling concrete pavement,cracking and seating concrete pavement, concrete pavement repairs, curb and gutter | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $856,448 |
Highway Planning and Construction Resurface, rehab or restore
This spending item is part of a $1,017,000 allocation.
See details
|
Federal Highway Administration | 3/31/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $850,835 | Highway Planning and Construction Street realignment under the Blue Water Bridge to secure piers | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $847,806 | Highway Planning and Construction Cold milling hot mix asphalt and hot mix asphalt resurfacing | Federal Highway Administration | 4/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $846,637 |
Highway Planning and Construction Hot mix asphalt cold milling and overlay
This spending item is part of a $1,007,882 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $842,076 | Highway Planning and Construction Streetscape enhancement, decorative street lighting, brick pavement removal and concrete pavement construction. | Federal Highway Administration | 6/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $837,000 | Highway Planning and Construction Concrete pavement cracking and seating, cold milling concrete pavement, hot mix asphalt resurfacing. | Federal Highway Administration | 9/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $831,423 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 7/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $830,781 |
Highway Planning and Construction Resurface road
This spending item is part of a $954,873 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $827,000 | Highway Planning and Construction Concrete pavement crack and seat, hot mix asphalt overlay, concrete pavement repairs and drainage structures | Federal Highway Administration | 7/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $825,251 | Highway Planning and Construction Design/Build Reconstruction | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $819,792 | Highway Planning and Construction Filler wall construction and substructure repair | Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $810,016 | Highway Planning and Construction HMA Cold Milling and HMA Resurfacing | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $806,000 |
Highway Planning and Construction Resurfacing and bridge repairs to a portion of the Kal-Haven State Trail, 10th Street
This spending item is part of a $900,000 allocation.
See details
|
Federal Highway Administration | 12/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $805,649 | Highway Planning and Construction Nonmotorized Path & Trailhead | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $804,662 | Highway Planning and Construction Hot mix asphalt paving, tenching, aggregate placement, drainage, and miscellaneous work along the existing railroad | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $800,000 | Highway Planning and Construction Concrete road reconstruction | Federal Highway Administration | 5/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $797,585 | Highway Planning and Construction Reconstruct roadway | Federal Highway Administration | 11/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $790,606 | Highway Planning and Construction Cold milling hot mix asphalt and resurface, concrete curb and gutter replacement, concrete pavement repairs, storm | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $776,818 | Highway Planning and Construction Cold milling, HMA resurfacing, and concrete curb and gutter | Federal Highway Administration | 7/14/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $766,217 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, resurfacing, trenching and aggregate shoulders. | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $764,861 | Highway Planning and Construction Hot mix asphalt surfacing | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $761,570 |
Highway Planning and Construction Hot mix asphalt resurfacing, sidewalk ramp upgrades and pavement markings
This spending item is part of a $883,108 allocation.
See details
|
Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $754,652 |
Highway Planning and Construction Reconstruct
This spending item is part of a $950,833 allocation.
See details
|
Federal Highway Administration | 2/24/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $753,890 | Highway Planning and Construction Hot mix asphalt non motoized path paving | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $751,020 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, minor curb and gutter, sidewalk, guardrail and storm sewer work. | Federal Highway Administration | 5/27/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $746,903 | Highway Planning and Construction Landscaping and Fence | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $746,003 | Highway Planning and Construction Mill/Resurface and Chip Seal | Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $744,772 | Highway Planning and Construction Hot mix asphalt road reconstruction, storm and sanitary sewer, landscaping and street lighting | Federal Highway Administration | 7/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $739,538 |
Highway Planning and Construction Concrete road reconstruction including concrete pavement, drainage improvements, hot mix asphalt paving, signal
This spending item is part of a $881,000 allocation.
See details
|
Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $731,384 | Highway Planning and Construction Hot mix asphalt cold milling and paving, concrete curb and gutter, replacement, and pavement markings | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $730,059 | Highway Planning and Construction Double Chipseal | Federal Highway Administration | 8/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $721,039 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, base crushing and shaping, aggregate shoulders, underdrains, pavement | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $717,712 | Highway Planning and Construction Median Cable Barrier | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $716,000 | Highway Planning and Construction Concrete pavement repairs, miscellaneous concrete curb and gutter, sidewalk and ADA ramps | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $707,085 | Highway Planning and Construction Concrete joint repair and signal upgrade | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $699,844 | Highway Planning and Construction Bridge Rehabilitation | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $692,322 |
Highway Planning and Construction Hot mixed asphalt road cold milling and resurfacing, adjustments, hot mixed asphalt paving, and pavement markings
This spending item is part of a $795,645 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $681,745 | Highway Planning and Construction Concrete road reconstruction, including pavement removal, concrete paving with integral curb and underdrain | Federal Highway Administration | 5/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $681,220 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, drainage improvements and hot mix asphalt paving | Federal Highway Administration | 5/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $676,421 | Highway Planning and Construction Substructure repairs, deck patching, pin and hanger, joints, zone painting, deck fascia and barrier replacement | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $673,000 | Highway Planning and Construction Concrete pavement cracking and seating, cold milling hot mix asphalt and concrete, concrete pavement repairs, hot mix | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $672,342 | Highway Planning and Construction Hot mix asphalt base crush and shape, shoulders, paving, guardrail, pavement marking and flag control | Federal Highway Administration | 4/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $671,000 | Highway Planning and Construction Reconstruction | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $667,892 | Highway Planning and Construction Hot mix asphalt cold milling pavement | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $661,466 |
Highway Planning and Construction Cold milling hot mix asphalt and concrete
This spending item is part of a $802,000 allocation.
See details
|
Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $652,695 | Highway Planning and Construction Aggregate base, hot mix asphalt base crushing | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $647,542 | Highway Planning and Construction Hot mix asphalt resurface and reconstruction including pavement removal, aggregate base, hot mix asphalt | Federal Highway Administration | 4/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $640,856 | Highway Planning and Construction Median cable barrier | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $640,238 | Highway Planning and Construction Concrete Patches & Restoration with Shoulder Reconstruction | Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $638,490 | Highway Planning and Construction Miscellaneouse concrete pavement, concrete pavement repairs, joint resealing, diamond grinding, concrete curb | Federal Highway Administration | 1/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $631,571 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $725,856 allocation.
See details
|
Federal Highway Administration | 12/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $627,753 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, hot mix asphalt surfacing, constructing shoulders, misc safety and drainage | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $624,776 | Highway Planning and Construction Hot mix asphalt, aggregate base, machine grading, pavement marking, traffic control and slope restoration | Federal Highway Administration | 4/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $622,319 | Highway Planning and Construction Deck patching, joint replacement, pin and hangers, substructure and slope paving repairs, fascia and zone paint | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $617,319 | Highway Planning and Construction Resurface | Federal Highway Administration | 9/03/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $616,054 | Highway Planning and Construction Single course microsurfacing | Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $606,650 | Highway Planning and Construction Hot mix asphalt road resurfacing, including base crushing, guardrail upgrades and pavement markings | Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $599,080 | Highway Planning and Construction Concrete curb removal and replacement, hot mix asphalt pavement removal, aggregate base, storm sewer, water main | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $597,081 | Highway Planning and Construction Substructure repairs, deck patching, pin and hanger, joints, end header replacement and zone painting | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $589,437 | Highway Planning and Construction Concrete Patches & Restoration with Shoulder Reconstruction | Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $583,657 | Highway Planning and Construction Epoxy overlay, beam and substructure, deck patch, joint concrete surface coating and maintaining traffic | Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $582,790 |
Highway Planning and Construction Resurface Road
This spending item is part of a $669,683 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $580,277 | Highway Planning and Construction Hot mix asphalt resurfacing including ... | Federal Highway Administration | 4/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $576,425 |
Highway Planning and Construction Concrete road reconstruction, concrete sidewalk ramps, and pavement markings
This spending item is part of a $675,000 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $573,809 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $568,680 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, base repair, concrete curb, sidewalk ramps
This spending item is part of a $653,457 allocation.
See details
|
Federal Highway Administration | 7/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $556,511 | Highway Planning and Construction Hot mixed asphalt road resurfacing, widening, concrete curb, gutter and sidewalk, ramps, hydrant relocation, storm | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $553,091 |
Highway Planning and Construction Resurface Road
This spending item is part of a $643,000 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $551,424 | Highway Planning and Construction Road reconstruction with sand subbase, aggregate base, curb and gutter, sewer, concrete driveways, sidewalk ramps | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $541,784 | Highway Planning and Construction Freeway lighting replacement | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $536,658 |
Highway Planning and Construction Hot mix asphalt overlay, aggregate shoulders, and intermittent cold milling
This spending item is part of a $616,692 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $535,347 | Highway Planning and Construction Chip seal, overband crack fill, and miscelleous payment and shoulder repairs | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $533,441 | Highway Planning and Construction Fabrication Inspection Services | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $532,422 | Highway Planning and Construction Road reconstruction including hot mix asphalt removal and resurfacing, aggregate base, concrete curb and gutter | Federal Highway Administration | 5/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $532,284 | Highway Planning and Construction Substruct repair, deep overlay, joint replace, pin & hanger, three beam retrofit, fascia beam & zone paint, approach work | Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $531,474 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, rubblizing, base crushing and shaping, drainage and guardrail
This spending item is part of a $624,753 allocation.
See details
|
Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $523,548 | Highway Planning and Construction Pavement repairs, cold milling resurfacing, shoulder reconstruction and pavement markings | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $522,334 | Highway Planning and Construction Guardrail replacement | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $519,183 |
Highway Planning and Construction Cold milling and hot mix asphalt resurfacing, bridge deck overlay, concrete bridge approach, guardrail and earth work
This spending item is part of a $607,703 allocation.
See details
|
Federal Highway Administration | 12/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $512,700 | Highway Planning and Construction Concrete joint and pavement repair | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $512,000 | Highway Planning and Construction Concrete pavement cracking and seating, concrete pavement repairs, cold milling and resurfacing hot mix asphalt | Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $510,000 | Highway Planning and Construction Decorative sidewalk, street lights and landscaping | Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $509,000 | Highway Planning and Construction Road reconstruction, including aggregate base, sewer, drainage structures, hot mix asphalt resurfacing, ADA ramps | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $508,914 | Highway Planning and Construction Repave almost 3 miles of S Delaney Rd near the City of Owosso in Shiawassee County | Federal Highway Administration | 10/27/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $506,085 | Highway Planning and Construction Hot mix asphalt surfacing including storm sewer, concrete curb and gutter, sidewalk, culvert, watermain, and markings | Federal Highway Administration | 1/25/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $506,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $503,211 | Highway Planning and Construction Hot mixed asphalt road reconstruction, including curb and gutter replacement and drainage improvement | Federal Highway Administration | 6/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $502,319 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 7/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $493,398 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete sidewalk and ramps, and curb and gutter | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $488,277 |
Highway Planning and Construction Hot mix asphalt resurfacing, base crushing and shaping, aggregate shoulders, pavement marking, and slope restoration
This spending item is part of a $625,139 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $484,620 | Highway Planning and Construction The Kent County Road Commission will resurface 1.5 miles of Leonard Street from M-44 to Crahen Street in Grand Rapids Township. | Federal Highway Administration | 9/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $477,843 | Highway Planning and Construction Cold milling hot mix asphalt and concrete | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $476,388 | Highway Planning and Construction Reconstruct roadway | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $476,061 | Highway Planning and Construction Active speed warning system | Federal Highway Administration | 8/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $475,729 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $475,000 | Highway Planning and Construction hot mix asphalt cold milling and resurfacing, cold milling concrete pavement, concrete curb and gutter, sidewalk, ADA | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $472,359 | Highway Planning and Construction Hot mix asphalt overlay | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $472,051 | Highway Planning and Construction Hot mix asphalt base crush & shaping, hot mix asphalt surfacing, guardrail upgrade, gravel shoulder, and pavement | Federal Highway Administration | 7/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $470,000 | Highway Planning and Construction Hot mix asphalt | Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $470,000 | Highway Planning and Construction Cold milling hot mix asphalt and resurface, concrete joint, crack repairs, concrete curb and gutter repair, concrete | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $469,171 | Highway Planning and Construction Hot mix asphalt cold milling and resurface, concrete pavement and repairs | Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $465,000 | Highway Planning and Construction Road reconstruction including pavement removal, curb and gutter, sidewalk, storm sewer, sanitary sewer and watermain | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $463,318 | Highway Planning and Construction Substructure repairs, deck patching, pin and hanger, joints, fascia beam and zone painting | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $461,140 | Highway Planning and Construction Cold milling hot mix asphalt surface and hot mix asphalt resurfacing | Federal Highway Administration | 4/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $456,655 | Highway Planning and Construction Cold milling hot mix asphalt, drainage improvements, concrete curb and gutter, concrete sidewalk and paving | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $450,000 | Highway Planning and Construction Concrete patching and panel repair | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $449,771 | Highway Planning and Construction Resurface | Federal Highway Administration | 12/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $446,738 |
Highway Planning and Construction Resurface Road
This spending item is part of a $512,209 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $446,345 | Highway Planning and Construction Resurface 3 miles of West Shelby Rd from 52nd Ave to 40th Ave west of the Village of Shelby. | Federal Highway Administration | 9/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $446,327 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing | Federal Highway Administration | 8/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $442,629 | Highway Planning and Construction Crush and shape, hot mix asphalt resurfacing, and drainage | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $442,597 | Highway Planning and Construction Cold milling hot mix asphalt, hot mix asphalt | Federal Highway Administration | 8/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $441,159 | Highway Planning and Construction Hot mix asphalt resurfacing | Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $440,528 | Highway Planning and Construction Hot mix asphalt cold milling, overlay and resurfacing | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $440,419 | Highway Planning and Construction Hot mix asphalt paving, aggregate base conditioning, concrete curb and gutter, aggregate shoulders | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $439,913 | Highway Planning and Construction Hot mix asphalt resurfacing, trenching, agg shoulders, pavement marking, and slope restoration | Federal Highway Administration | 4/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $437,239 |
Highway Planning and Construction Hot mix asphalt pavement, concrete curb and gutter, water main installation, earth grading, storm sewer
This spending item is part of a $502,469 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $423,923 | Highway Planning and Construction Resurface road | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $421,791 | Highway Planning and Construction Hot mix asphalt road reconstruction, concrete curb and gutter, concrete sidewalks, drainage, watermain | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $421,517 |
Highway Planning and Construction Hot mix asphalt overlay including cold milling hot mix asphalt
This spending item is part of a $497,457 allocation.
See details
|
Federal Highway Administration | 9/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $417,499 | Highway Planning and Construction Hot mix asphalt shoulder trenching and paving. | Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $415,000 | Highway Planning and Construction Cold milling concrete and hot mix asphalt | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $411,850 |
Highway Planning and Construction Roadway realignment and intersection modifications, pavement removal, earth excavation, subbase, aggregate
This spending item is part of a $480,000 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $410,455 | Highway Planning and Construction Guardrail Replacement | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $409,478 | Highway Planning and Construction Hot mix asphalt reconstruction, concrete gurb and gutter, storm sewer and earth work | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $408,733 | Highway Planning and Construction Micro-surfacing and overband crack fill. | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $406,541 | Highway Planning and Construction Single chip seal of the existing hot mix asphalt mainline and paved shoulders, and placement of aggregate shoulder. | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $405,274 | Highway Planning and Construction Concrete cold milling, pavement repairs, hot mix asphalt overlay, intermittent curb and gutter replacement, sidewalk | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $402,996 | Highway Planning and Construction Hot mix asphalt resurfacing, including cold milling, hot mix asphalt paving, concrete. | Federal Highway Administration | 9/14/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $402,983 | Highway Planning and Construction Hot mix asphalt shoulder trenching and paving. | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $402,000 | Highway Planning and Construction Resurface road | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $400,000 | Highway Planning and Construction Hot mix asphalt reconstruction, concrete pavement,concrete pavement, curb and gutter, storm and sanitary sewer, water | Federal Highway Administration | 8/27/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $395,590 | Highway Planning and Construction Hot mix asphalt crushing and shaping, hot mix asphalt resurfacing, aggregate shoulders, concrete curb and gutter | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $395,535 | Highway Planning and Construction Active speed warning system | Federal Highway Administration | 8/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $391,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $387,200 | Highway Planning and Construction Hot mix asphalt resurfacing, trenching, base crushing and shaping | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $385,286 | Highway Planning and Construction Multiple course micro-surfacing | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $380,183 | Highway Planning and Construction Cold milling concrete pavement, hot mix asphalt resurfacing, concrete base course repairs, joint and crack repairs, | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $373,728 | Highway Planning and Construction Hot mix asphalt widening for construction of a center left turn lane | Federal Highway Administration | 6/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $373,306 | Highway Planning and Construction Paver Placed Surface Seal | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $371,544 |
Highway Planning and Construction Culvert replacement, hot mix asphalt base crushing and shaping, hot mix asphalt paving, pavement markings
This spending item is part of a $400,284 allocation.
See details
|
Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $366,683 | Highway Planning and Construction Hot mis asphalt ultra thin overlay, traffic sign replacement and pavement marking | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $365,485 | Highway Planning and Construction Single chip seal and fog seal | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $362,028 | Highway Planning and Construction Hot in place pavement recycling and hot mix asphalt | Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $361,852 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete curb and gutter, concrete sidewalks and ADA ramps | Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $361,687 | Highway Planning and Construction Hot mix asphalt cold milling, crushing and shaping, machine grading, resurfacing. | Federal Highway Administration | 8/31/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $360,997 | Highway Planning and Construction Mill & Resurface | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $358,122 | Highway Planning and Construction Cold mill/HMA resurface and joint repairs | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $357,422 | Highway Planning and Construction Remove and replace superstructure along with minor approach work including hot mix asphalt pave and guardrail placement | Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $355,561 | Highway Planning and Construction Hot mix asphalt resurfacing and aggregate | Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $353,754 | Highway Planning and Construction Hot mix asphalt resurfacing with joint repairs | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $353,290 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing and shaping, trenching, aggregate shoulders, guardrail, pavement marking | Federal Highway Administration | 11/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $353,287 | Highway Planning and Construction Bridge rehabilitation, including concrete overlay and railing replacement | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $352,152 | Highway Planning and Construction Reconstruct. | Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $350,000 | Highway Planning and Construction Concrete cracking and seating, cold milling concrete pavement, hot mix asphalt resurfacing, concrete pavement | Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $349,652 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $347,246 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing and shaping, storm sewer upgrade, concrete curb and gutter, pavement | Federal Highway Administration | 2/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $342,711 | Highway Planning and Construction Replace the West Cass City Rd bridge over the Allen drain | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $342,132 | Highway Planning and Construction Hot mix asphalt resurfacing including gravel shoulders and pavement markings | Federal Highway Administration | 5/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $341,111 | Highway Planning and Construction Hot mix asphalt overlay | Federal Highway Administration | 7/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $340,911 | Highway Planning and Construction Hot mix asphalt resurfacing, machine grading, aggregate shoulders, pavement marking, and slope restoration | Federal Highway Administration | 2/09/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $340,000 | Highway Planning and Construction Pavement removal, drainage structures, cold milling, hot mix asphalt resurfacing and concrete sidewalk and ADA ramps | Federal Highway Administration | 7/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $340,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete curb and gutter, concrete sidwalk and ADA ramps | Federal Highway Administration | 7/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $339,567 | Highway Planning and Construction Single Course Chip Seal | Federal Highway Administration | 12/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $335,768 |
Highway Planning and Construction Hot mix asphalt cold milling anbd resurfacing, trenching, aggregate base and shoulders and pavement markings
This spending item is part of a $348,268 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $335,068 |
Highway Planning and Construction Resurface 3.2 miles of Karlin Rd. from M-137 to Nessen Rd south of the Village of Green Lake.
This spending item is part of a $404,958 allocation.
See details
|
Federal Highway Administration | 9/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $335,006 | Highway Planning and Construction Resurface | Federal Highway Administration | 1/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $332,306 | Highway Planning and Construction Guardrail Upgrading | Federal Highway Administration | 6/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $332,036 | Highway Planning and Construction Road reconstruction | Federal Highway Administration | 5/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $331,618 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing culvert replacemt, guard rail upgrade, slope restoration | Federal Highway Administration | 8/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $331,521 |
Highway Planning and Construction Hot mix asphalt pavement overlay with gravel shoulder restoration
This spending item is part of a $409,200 allocation.
See details
|
Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $331,098 | Highway Planning and Construction Hot mix asphalt reconstruction, base crushing and shaping | Federal Highway Administration | 7/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $330,773 | Highway Planning and Construction Hot mix asphalt base crush and shape, hot mix asphalt, resurfacing, trenching, ditching and aggregate shoulders | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $330,310 | Highway Planning and Construction Resurface | Federal Highway Administration | 12/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $330,193 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete sidewalks and signal improvements | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $328,382 | Highway Planning and Construction Hot mix asphalt resurfacing overlay | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $328,000 | Highway Planning and Construction Drainage structures, hot mix asphalt cold milling and resurfacing, concrete curb and gutter, and concrete sidewalk | Federal Highway Administration | 7/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $325,062 | Highway Planning and Construction Hot mix asphalt resurfacing including aggregate base and gravel shoulder | Federal Highway Administration | 9/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $324,893 | Highway Planning and Construction Hot mix asphalt shoulder trenching and paving. | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $324,884 | Highway Planning and Construction Hot mix asphalt road resurfacing, including cold milling, concrete base repair, and concrete curb and gutter | Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $324,669 | Highway Planning and Construction Pavement, curb and gutter removal, undercut sub grade, install storm sewer and catch basins, hot mix asphalt paving | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $320,497 | Highway Planning and Construction Hot mix asphalt crushing and shaping, hot mix asphalt resurfacing, aggregate base and shoulders | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $318,523 | Highway Planning and Construction Hot mix asphalt cold milling and resurface, concrete pavement and repairs | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $318,322 | Highway Planning and Construction Cold milling hot mix asphalt and resurface, concrete curb and gutter replacement and earth work | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $314,607 | Highway Planning and Construction Hot mixed asphalt road reconstruction, pavement removal, drainage improvements, concrete curb and gutter, hot mixed | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $309,392 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing | Federal Highway Administration | 9/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $307,901 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, pavement markings, sanitary sewer repair and concrete sidewalk ramps | Federal Highway Administration | 5/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $307,585 | Highway Planning and Construction Integrate ITS Devices | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $300,069 | Highway Planning and Construction Hot mix asphalt cold milling, concrete curb and gutter repair | Federal Highway Administration | 5/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $300,000 | Highway Planning and Construction Hot mixed asphalt road reconstruction | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $300,000 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $299,267 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing and shaping, aggregate shoulders, culverts, guardrail | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $297,647 |
Highway Planning and Construction Hot mix asphalt pavement overlay and gravel shoulder restoration
This spending item is part of a $387,700 allocation.
See details
|
Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $297,512 | Highway Planning and Construction Hot mix asphalt surface removing and hot mix asphalt paving | Federal Highway Administration | 2/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $295,295 | Highway Planning and Construction Machine grading, aggregate base, storm sewer, hot mix asphalt, traffic control and water main | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $294,422 | Highway Planning and Construction Hot mix asphalt road reconstruction, roadway grading, aggregate base, subbase, culverts, and slope restoration | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $293,993 | Highway Planning and Construction Hot mix asphalt paved shoulder widening to eight feet | Federal Highway Administration | 4/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $293,072 | Highway Planning and Construction Micro surfacing and aggregate shoulders | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $291,282 |
Highway Planning and Construction Rehabilitate culvert
This spending item is part of a $334,075 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $291,025 |
Highway Planning and Construction Resurface Road
This spending item is part of a $311,942 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $290,699 | Highway Planning and Construction Pavement reconstruction, pavement removal, earth excavation, aggregate base, concrete pavement and water main | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $290,000 | Highway Planning and Construction Hot mix asphalt surfacing including cold milling hot mix asphalt surface, sidewalk ADA ramps, and pavement markings | Federal Highway Administration | 11/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $289,337 | Highway Planning and Construction 26 miles of HMA crack treatment, Muskegon TSC Wide | Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $289,076 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $288,245 | Highway Planning and Construction Hot mix asphalt base crush and shape, shoulder aggregate, culvert replacement and pavement marking | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $287,218 | Highway Planning and Construction Resurface | Federal Highway Administration | 12/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $286,746 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete curb and gutter and sidewalk | Federal Highway Administration | 5/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $285,637 | Highway Planning and Construction Hot mix asphalt overlay, aggregate shoulder and pavement marking | Federal Highway Administration | 8/31/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $284,181 | Highway Planning and Construction Resurface | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $282,788 | Highway Planning and Construction Resurface Road | Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $282,092 | Highway Planning and Construction Hot mix asphalt overlay, cold milling, base repairs, aggregate shoulders and earthwork | Federal Highway Administration | 8/12/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $280,000 | Highway Planning and Construction Road reconstruction of existing bituminous over concrete pavement and integral curb | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $279,566 | Highway Planning and Construction Pavement remremoval, hot mix asphalt pavement, concrete curb and gutter and earth work | Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $279,121 | Highway Planning and Construction Hot mix asphalt paving, shoulders, pavement markings, and traffic control | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $278,144 | Highway Planning and Construction Hot mix asphalt resurfacing, cold milling, aggregate shoulders, and pavement markings | Federal Highway Administration | 12/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $277,824 | Highway Planning and Construction Placing penetrating floodcoat on sixteen (16) bridges | Federal Highway Administration | 5/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $277,500 | Highway Planning and Construction Removing exisiting pavement markings and applying new plural components modified urethane pavement markings | Federal Highway Administration | 7/08/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $277,431 | Highway Planning and Construction Hot mix asphalt cold milling and overlay | Federal Highway Administration | 8/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $277,358 | Highway Planning and Construction Hot mix asphalt surfacing, hot mix asphalt | Federal Highway Administration | 9/16/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $277,036 | Highway Planning and Construction Hot mix asphalt crushing and shaping, shoulders, hot mix asphalt paving, pavement marking and traffic control | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $276,431 | Highway Planning and Construction Hot mix asphalt cold milling pavement and resurfacing | Federal Highway Administration | 5/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $271,725 | Highway Planning and Construction Hot mix asphalt resurfacing, concrete curb | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $270,982 | Highway Planning and Construction Hot mix asphalt resurfacing, trenching and aggregate shoulders | Federal Highway Administration | 6/12/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $270,466 | Highway Planning and Construction Historic Preservation | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $270,318 | Highway Planning and Construction Intersection realignment, pavement removal, hot mix asphalt resurfacing, concrete curb and gutter, concrete | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $269,634 | Highway Planning and Construction Pavement removal, concrete pavement | Federal Highway Administration | 4/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $268,649 | Highway Planning and Construction Hot mix asphalt crush and shape, shoulders | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $268,455 | Highway Planning and Construction Sidewalk with Pedestrian Signal | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $267,913 | Highway Planning and Construction Micro surfacing, hot mix asphalt base repairs, aggregate shoulders, and concrete sidewalk ramps | Federal Highway Administration | 8/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $266,568 | Highway Planning and Construction Hot mix asphalt resurfacing and wedging,aggregate shoulders, pavement markings, and permanent signing | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $264,883 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, aggregate shoulders, replacement of exisiting concrete box culvert, | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $264,726 | Highway Planning and Construction Hot mix asphalt resurface and sidewalk improvements | Federal Highway Administration | 7/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $263,000 | Highway Planning and Construction Concrete pavement repair, miscellaneous concrete curb and gutter, and ADA ramps | Federal Highway Administration | 12/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $259,521 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete ramps and pavement markings | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $258,333 | Highway Planning and Construction Hot mix asphalt crushing and shaping, grading, drainage, and hot mix asphalt surfacing | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $256,558 | Highway Planning and Construction Ultra thin overlay. | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $254,733 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, pavement repairs, concrete curb and gutter and ADA ramps | Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $254,334 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete sidewalk, and ramps, and curb and gutter | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $250,000 | Highway Planning and Construction Nonmotorized expansion | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $249,183 | Highway Planning and Construction Cold milling HMA surface, HMA resurfacing and concrete curb and gutter | Federal Highway Administration | 7/14/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $247,914 | Highway Planning and Construction HMA base crush and shape, culvert replacement, paving, ditching, and shoulder work | Federal Highway Administration | 11/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $246,572 | Highway Planning and Construction Hot mix asphalt resurfacing, including curb and gutter, aggregate shoulders, concrete sidewalk ramps | Federal Highway Administration | 9/14/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $241,538 | Highway Planning and Construction Resurface road | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $240,000 | Highway Planning and Construction Pavement removal, hot mix asphalt pavement, storm sewer, sanitary, water main, street lighting, concrete curb | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $239,737 | Highway Planning and Construction Hot mix asphalt crush and shape and resurfacing, drainage structure cover, concrete driveway, sidewalk ramp | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $239,736 | Highway Planning and Construction Machine grading, aggregate base, drainage structure, hot mix asphalt paving, sewer, water main, pavement markings | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $239,412 | Highway Planning and Construction Substructure repairs, pin and hanger, fascia beam and zone painting | Federal Highway Administration | 9/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $238,505 | Highway Planning and Construction Cold milling hot mix asphalt surface, ultra thin concrete, sidewalk ADA ramp, and pavement markings | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $236,975 | Highway Planning and Construction Hot mix asphalt cold milling and hot mix asphalt overlay | Federal Highway Administration | 3/30/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $234,154 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing and shaping, biaxial geogrid, precast concrete box culvert, guardrail | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $232,099 | Highway Planning and Construction Guardrail upgrade | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $230,691 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing, concrete curb and gutter and sidewalk ramps | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $229,924 | Highway Planning and Construction Repave to improve ride quality and make the road smoother. | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $229,387 |
Highway Planning and Construction Hot mix asphalt road resurfacing, including concrete curb capping and sidewalk ramps, hot mix asphalt paving
This spending item is part of a $263,331 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $225,472 | Highway Planning and Construction The Cty of Grand Rapids will resurface .2 miles of Lake Drive from Cherry Street to Fuller Avenue in the City of Grand Rapids. | Federal Highway Administration | 9/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $222,945 | Highway Planning and Construction Resurface MAAS to Baldwin Kiln Street | Federal Highway Administration | 2/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $222,501 |
Highway Planning and Construction Resurface
This spending item is part of a $255,411 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $222,475 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, resurfacing, drainage corrections, pavement markings and traffic control | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $222,339 | Highway Planning and Construction Shoulders, sewer, hot mix asphalt, pavement marking and traffic control | Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $221,319 | Highway Planning and Construction Hot mix asphalt cold milling and resurface, concrete pavement, minor work on railroad crossing, and earthwork | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $220,017 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete curb and gutter, concrete sidewalk ramps | Federal Highway Administration | 12/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $220,000 | Highway Planning and Construction Reconstruction | Federal Highway Administration | 12/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $219,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, and aggregate shoulders | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $218,743 |
Highway Planning and Construction Cold mill hot mix asphalt and resurface, pavement repairs and earth work
This spending item is part of a $251,248 allocation.
See details
|
Federal Highway Administration | 7/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $215,314 | Highway Planning and Construction Hot mix asphalt crushing and shaping, concrete curb and gutter replacement, structure adjustments and resurfacing | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $213,948 | Highway Planning and Construction Hot mix asphalt resurfacing, base crushing and shaping, aggregate shoulders and pavement markings | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $213,925 | Highway Planning and Construction Hot mix asphalt cold milling and surfacing, hot in place hot mix asphalt recycling, ADA ramp | Federal Highway Administration | 2/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $213,288 |
Highway Planning and Construction Hot mix asphalt cold milling, crushing and shaping, culvert replacement, ditching, and hot mix asphalt shoulders
This spending item is part of a $306,858 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $213,058 | Highway Planning and Construction Aggregate base, hot mix asphalt paving, shoulder and pavement marking | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $211,635 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $243,065 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $210,401 | Highway Planning and Construction Hot mix asphalt cold milling and overlay | Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $210,060 | Highway Planning and Construction Reconstruction, including machine grading | Federal Highway Administration | 5/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $210,000 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing, strom sewer, water main and sanitary, curb, gutter and sidwalk | Federal Highway Administration | 6/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $205,000 | Highway Planning and Construction Hot mix asphalt surfacing including cold milling hot mix asphalt surface, sidewalk ADA ramps, and pavement markings | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $204,724 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, aggregate base and hot mix asphalt resurfacing | Federal Highway Administration | 5/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $202,572 |
Highway Planning and Construction Hot mix asphalt resurfacing, concrete curb and gutter and pavement marking
This spending item is part of a $233,284 allocation.
See details
|
Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $202,570 | Highway Planning and Construction Hot mix asphalt crack treatment roadbed, warranty | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $202,053 | Highway Planning and Construction Hot mix asphalt surface remove, drainage improvements and hot mix asphalt paving. | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $202,029 |
Highway Planning and Construction Hot mix asphalt road resurfacing, storm sewer, guardrail upgrades, hot mix asphalt paving and pavement marking
This spending item is part of a $231,809 allocation.
See details
|
Federal Highway Administration | 2/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $200,000 | Highway Planning and Construction Hot mix asphalt road reconstruction, including removing pavement, water main, sanitary sewer, concrete sidewalk | Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $200,000 | Highway Planning and Construction Road reconstruction including, pavement removal, grading, aggregate base, hot mix asphalt paving, storm sewer | Federal Highway Administration | 6/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $200,000 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, tree removal, drainage, earthwork, slope restoration. | Federal Highway Administration | 3/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $200,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 9/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $200,000 | Highway Planning and Construction Hot mix asphalt overlay, aggregate shoulder, concrete ADA sidewalk ramps and earthwork | Federal Highway Administration | 8/16/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $199,395 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $195,116 | Highway Planning and Construction Hot mix asphalt paving, aggregate base conditioning, aggregate shoulders and slope restoration | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $194,445 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete sidewalk and ramps, and curb and gutter | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $194,264 | Highway Planning and Construction Deck patching, painting, substructure and slope repair, concrete coating, joint replacement, pedestrian fence | Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $190,414 | Highway Planning and Construction Hot mix asphalt cold milling pavement and resurfacing, sidewalk and concrete curb and gutter improvements | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $189,831 | Highway Planning and Construction 2 inch Mill & Fill | Federal Highway Administration | 12/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $188,445 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, aggregate base and hot mix asphalt resurfacing | Federal Highway Administration | 5/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $188,042 | Highway Planning and Construction Hot mix asphalt overlay, aggregate shoulder, base repair, earth work and pavement marking | Federal Highway Administration | 12/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $187,705 | Highway Planning and Construction Epoxy overlay, paint, substructure & steel repair, scour protection and concrete surface coating | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $187,342 | Highway Planning and Construction Cold milling, hot mix asphalt resurfacing, curb and gutter, concrete sidewalk and ADA ramps | Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $187,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $185,948 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $185,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete curb and gutter, concrete sidewalk and ADA ramps | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $185,000 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $184,375 |
Highway Planning and Construction Hot mix asphalt cold milling and resurface, paved shoulders
This spending item is part of a $250,000 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $184,263 | Highway Planning and Construction Road reconstruction | Federal Highway Administration | 7/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $183,884 | Highway Planning and Construction Crush and shape, culvert work | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $183,407 | Highway Planning and Construction Resurface | Federal Highway Administration | 9/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $182,227 | Highway Planning and Construction Hot mix asphalt resurfacing including aggregate base and gravel shoulder | Federal Highway Administration | 9/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $180,000 | Highway Planning and Construction Hot mix asphalt intersection construction, machine grading, aggregate base, curb and gutter and slope restoration | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $180,000 | Highway Planning and Construction Hot mix asphalt reconstruction including aggregate base, storm sewer, concrete curb and gutter, watermain and | Federal Highway Administration | 1/21/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $179,863 | Highway Planning and Construction Hot mix asphalt cold milling and surfacing and aggregate shoulders | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $179,662 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete sidewalk and ramps, and curb and gutter | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $178,650 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, resurfacing, trenching and aggregate shoulders | Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $178,524 |
Highway Planning and Construction Resurface Road
This spending item is part of a $206,918 allocation.
See details
|
Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $178,180 | Highway Planning and Construction Hot Mix Asphalt road reconstruction including base crushing and shaping, subgrade undercutting, sidewalk ramps | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $176,733 | Highway Planning and Construction Hot mix asphalt shoulder widening including trenching existing gravel shoulders | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $176,658 | Highway Planning and Construction Hot mix asphalt surfacing and hot mix asphalt curb | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $176,229 |
Highway Planning and Construction HMA overlay
This spending item is part of a $241,685 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $175,000 | Highway Planning and Construction Road reconstruction, pavement removal, aggregate base, hot mix asphalt paving, storm sewer, concrete sidewalk | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $173,533 | Highway Planning and Construction Pavement reconstruction, pavement removal, earth excavation, aggregate base, drainage structures, concrete | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $171,252 | Highway Planning and Construction Road reconstruction, including pavement removal, hot mix asphalt pavement, concrete curb, gutter, and sidewalk, | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $171,106 |
Highway Planning and Construction Full depth reconstruction of hot mix asphalt pavement, concrete curb and gutter, water main, earth grading, storm
This spending item is part of a $204,000 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $170,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, aggregate base, curb and gutter, driveway approaches, | Federal Highway Administration | 2/02/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $168,088 | Highway Planning and Construction US-131 over Manistee River, Bridge replacement and approach work | Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $167,332 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, trenching and hot mix asphalt shoulders with aggregate base | Federal Highway Administration | 6/12/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $166,935 | Highway Planning and Construction hot mix asphalt crack treatment roadbed, warranty | Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $164,954 | Highway Planning and Construction Culvert replacement | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $164,814 | Highway Planning and Construction Construct carpool lot | Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $164,462 | Highway Planning and Construction Pavement project on Eagle Harbor Road in Keweenaw County. | Federal Highway Administration | 9/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $164,336 | Highway Planning and Construction Remove exisiting structure, construct a timber bridge, channel and foundation excavation, backfill and riprap | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $163,866 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $163,736 | Highway Planning and Construction Hot mix asphalt cold milling pavement and resurfacing | Federal Highway Administration | 5/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $161,472 |
Highway Planning and Construction Signal interconnect
This spending item is part of a $185,243 allocation.
See details
|
Federal Highway Administration | 9/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $161,280 | Highway Planning and Construction Cold milling hot mix asphalt and resurface, concrete pavement repairs and earth work | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $160,452 | Highway Planning and Construction Single course chip seal | Federal Highway Administration | 10/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $159,722 | Highway Planning and Construction Guardrail replacement and upgrading. | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $159,112 | Highway Planning and Construction Resurface | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $157,005 |
Highway Planning and Construction Resurface
This spending item is part of a $180,241 allocation.
See details
|
Federal Highway Administration | 4/07/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $155,121 | Highway Planning and Construction Hot mix asphalt surfacing, hot mix asphalt | Federal Highway Administration | 9/16/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $154,754 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 7/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $154,119 | Highway Planning and Construction Hot mix asphalt reconstruction, concrete curb, gutter, and sidewalk, storm sewer, water main | Federal Highway Administration | 9/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $153,915 | Highway Planning and Construction Pavement removal, curb and gutter removal, | Federal Highway Administration | 8/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $152,704 | Highway Planning and Construction Resurface | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $152,280 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, joint repair, concrete curb and gutter, sidewalk repair, ADA ramps | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $151,073 | Highway Planning and Construction Hot mix asphalt cold milling, hot mix asphalt surfacing, concrete curb and gutter removal and replacement, ADA ramps | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $150,874 |
Highway Planning and Construction Resurface road
This spending item is part of a $173,130 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $150,000 | Highway Planning and Construction Resurface. | Federal Highway Administration | 12/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $147,998 | Highway Planning and Construction Pavement Marking | Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $146,979 | Highway Planning and Construction Hot mix asphalt crushing and shaping, hot mix asphalt resurfacing, aggregate shoulders, and ADA ramps | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $144,991 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing ultra thin overlay and pavement markings
This spending item is part of a $166,215 allocation.
See details
|
Federal Highway Administration | 2/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $144,067 | Highway Planning and Construction Hot mix asphalt road resurfacing, cold milling, concrete overlay, concrete sidewalk ramps, hot mix asphalt paving, | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $142,761 | Highway Planning and Construction Cold milling and resurfacing hot mix asphalt, base crushing and shaping modified, aggregate shoulder, guardrail | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $141,026 |
Highway Planning and Construction Overband crack fill
This spending item is part of a $161,805 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $140,861 | Highway Planning and Construction Cold milling hot mix asphalt and resurfacing, pavement repair, concrete curb and gutter repair, sidewalk and ADA | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $140,515 | Highway Planning and Construction Hot mix asphalt trenching and paving for non-motorized shoulders | Federal Highway Administration | 4/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $135,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 8/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $135,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $135,000 | Highway Planning and Construction Hot mix asphalt cold milling and resufacing | Federal Highway Administration | 10/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $134,652 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 6/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $132,181 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, guardrail and pavement marking
This spending item is part of a $155,000 allocation.
See details
|
Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $131,945 |
Highway Planning and Construction Hot mix asphalt surfacing and pavement markings
This spending item is part of a $151,198 allocation.
See details
|
Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $129,441 | Highway Planning and Construction Cold milling concrete and hot mix asphalt, hot mix asphalt resurfacing, concrete curb and gutter, and ADA ramps | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $128,695 | Highway Planning and Construction Pavement repair and shoulders | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $127,871 | Highway Planning and Construction Pavement markings, sign and signal upgrades, and LED conversion | Federal Highway Administration | 1/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $127,500 | Highway Planning and Construction Hot mix asphalt road resurfacing, including cold milling, concrete sidewalk ramps, and pavement markings | Federal Highway Administration | 1/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $125,000 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $125,000 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, hot mix asphalt cold milling and overlay and aggregate shoulders | Federal Highway Administration | 1/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $125,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, ADA sidewalk ramps | Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $124,863 | Highway Planning and Construction Historic Preservation | Federal Highway Administration | 5/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $124,319 | Highway Planning and Construction Hot mix asphalt road resurfacing, cold milling butt joints, hot mix asphalt paving, aggregate shoulders and pavement | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $122,755 |
Highway Planning and Construction Hot mix asphalt overlay and pavement markings
This spending item is part of a $146,233 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $122,215 | Highway Planning and Construction Pavement removal, hot mix asphalt resurfacing and sidewalk ramps | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $120,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurface, clearing and tree removal and aggregate shoulders | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $120,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurface, crown correction curb and gutter replacement, and pavement markings | Federal Highway Administration | 12/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $120,000 | Highway Planning and Construction Hot mixed asphalt road reconstruction, including pavement removal, concrete curb and gutter, concrete sidewalk | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $119,471 | Highway Planning and Construction Hot mix asphalt pathway for Pere Marquette Rail Trail extension | Federal Highway Administration | 9/20/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $116,714 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 6/15/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $115,000 | Highway Planning and Construction Hot mixed asphalt, cold milling and resurfacing, concrete sidewalk ramps and pavement marking | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $111,607 | Highway Planning and Construction Hot mix asphalt reconstruction, cold milling hot mix asphalt and resurfacing, concrete sidewalks, and ADA ramps | Federal Highway Administration | 9/16/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $110,615 |
Highway Planning and Construction Hot mix asphalt resurfacing, guardrail and pavement markings
This spending item is part of a $121,717 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $110,122 | Highway Planning and Construction Hot mix asphalt road resurfacing including cold milling, hot mixed asphalt paving, sidewalk ramps, pavement markings | Federal Highway Administration | 2/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $110,000 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $110,000 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps and pavement markings | Federal Highway Administration | 12/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $110,000 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing, concrete curb, gutter and sidewalk, ramps and pavement markings | Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $109,314 | Highway Planning and Construction Hot mix asphalt resurfacing including cold milling hot mix aphalt surface, aggregate shoulder, and pavement markings | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $108,457 | Highway Planning and Construction Cold milling, hot mix asphalt paving and traffic control | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $107,984 | Highway Planning and Construction Hot mix asphalt resurfacing | Federal Highway Administration | 4/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $107,000 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 2/05/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $102,632 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete sidewalk ramps and pavement markings | Federal Highway Administration | 8/25/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $102,190 | Highway Planning and Construction Mill and resurface | Federal Highway Administration | 9/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $100,587 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $100,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, pavement repairs, concrete curb and gutter and earthwork | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $100,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, pavement repairs, concrete curb and gutter and earthwork | Federal Highway Administration | 6/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $100,000 | Highway Planning and Construction Hot mix ashalt mill and resurface, shoulder widening, concrete sidewalk ramps and pavement markings | Federal Highway Administration | 1/25/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $100,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, ADA ramps, structure adjustments, and pavement markings | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $99,294 |
Highway Planning and Construction Hot mixed asphalt cold milling, concrete sidewalk and sidwalk ramps, and pavement markings
This spending item is part of a $147,294 allocation.
See details
|
Federal Highway Administration | 10/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $95,700 | Highway Planning and Construction Hot mix asphalt crushing and shaping | Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $95,000 | Highway Planning and Construction Cold milling hot mix asphalt and resurfacing, concrete sidewalk ramps and pavement markings | Federal Highway Administration | 11/12/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $95,000 | Highway Planning and Construction Cold milling hot mix asphalt and resurfacing, hot mix asphalt overlay, brick paver sidewalk ramps, and earthwork | Federal Highway Administration | 1/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $94,674 | Highway Planning and Construction Hot mix asphalt resurfacing of existing car pool lots | Federal Highway Administration | 4/28/2009 |
INGHAM COUNTY ROAD COMMISSION | $94,000 | Highway Planning and Construction Chip and seal - Maintenance resurfacing | Federal Highway Administration | 5/05/2009 |
Ingham County Road Commission | $94,000 | Highway Planning and Construction Chip and seal - Maintenance resurfacing | Federal Highway Administration | 5/05/2009 |
INGHAM COUNTY ROAD COMMISSION | $94,000 | Highway Planning and Construction Resurfacing -Chip and Seal | Federal Highway Administration | 5/05/2009 |
Ingham County Road Commission | $94,000 | Highway Planning and Construction Resurfacing -Chip and Seal | Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $93,494 | Highway Planning and Construction Resurface | Federal Highway Administration | 8/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $92,500 | Highway Planning and Construction Resurface | Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $92,500 | Highway Planning and Construction Reconstruction | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $92,238 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, concrete curb and gutter, concrete sidewalk and ADA ramps | Federal Highway Administration | 1/06/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $92,101 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $92,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing and drainage work | Federal Highway Administration | 11/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $91,738 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing and aggregate shoulders | Federal Highway Administration | 2/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $91,556 |
Highway Planning and Construction Resurface Road
This spending item is part of a $99,644 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $90,958 |
Highway Planning and Construction Resurface Road
This spending item is part of a $103,168 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $90,650 | Highway Planning and Construction Machine grading, shoulders, hot mix asphalt pavement, pavement marking and traffic control | Federal Highway Administration | 12/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $90,198 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $90,000 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing and pavement markings | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $90,000 | Highway Planning and Construction Hot mix asphalt road reconstruction, ditching, subbase work, hot mix asphalt paving and pavement markings | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $88,522 | Highway Planning and Construction Cold milling and hot mixed asphalt paving, concrete sidewalk ramps and pavement markings | Federal Highway Administration | 7/08/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $88,259 | Highway Planning and Construction Crack sealing, pavement repair, resealing longitudinal joints, traffic control | Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $87,671 | Highway Planning and Construction Hot mix asphalt surfacing, hot mix asphalt | Federal Highway Administration | 9/16/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $86,290 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $102,970 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $85,831 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $85,144 | Highway Planning and Construction Hot mix asphalt resurfacing, cold milling | Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $81,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 5/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $80,333 | Highway Planning and Construction Hot mix asphalt cold milling, hot mix asphalt surfacing, concrete curb and gutter removal and replacement, ADA ramps | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $80,304 | Highway Planning and Construction Single course chip seal | Federal Highway Administration | 10/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $80,000 | Highway Planning and Construction Hot in place pavement recycling and hot mix asphalt resurfacing | Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $79,929 | Highway Planning and Construction Hot mix asphalt road resurfacing, cold milling, concrete sidewalk ramps, hot mix asphalt paving and pavement markings | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $79,502 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $79,502 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing | Federal Highway Administration | 4/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $79,275 |
Highway Planning and Construction Widen shoulder to improve safety and mobility.
This spending item is part of a $118,487 allocation.
See details
|
Federal Highway Administration | 10/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $78,681 | Highway Planning and Construction Coldmill, Curb and Gutter | Federal Highway Administration | 6/28/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $78,216 | Highway Planning and Construction Reconstruct | Federal Highway Administration | 12/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $78,116 | Highway Planning and Construction Grade and hot mix asphalt paving of existing gravel and overlay and approach paving of Existing Park and Ride Lots. | Federal Highway Administration | 4/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $76,696 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $76,648 |
Highway Planning and Construction Hot mix asphalt resurfacing
This spending item is part of a $87,421 allocation.
See details
|
Federal Highway Administration | 6/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $75,000 | Highway Planning and Construction Construction oversight | Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $71,101 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $81,451 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $70,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 9/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $68,679 | Highway Planning and Construction Hot mixed asphalt cold milling and resurfacing | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $67,641 | Highway Planning and Construction Resurface | Federal Highway Administration | 6/04/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $67,317 | Highway Planning and Construction HMA Resurfacing | Federal Highway Administration | 2/09/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $66,268 | Highway Planning and Construction Seal Coat | Federal Highway Administration | 8/18/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $65,700 | Highway Planning and Construction Hot mix asphalt crush and shape, shoulders, hot mix asphalt paving | Federal Highway Administration | 11/25/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $65,120 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, sidewalk ADA ramps, permanent signs and pavement markings | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $64,949 | Highway Planning and Construction Hot mix asphalt base crush and shape, ditching, shoulder aggregate, culvert replacement, and restoration | Federal Highway Administration | 10/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $64,678 | Highway Planning and Construction Resurface | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $63,912 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $63,262 |
Highway Planning and Construction Hot mix asphalt resurfacing ultra thin low volume overlay
This spending item is part of a $72,377 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
Ingham County Road Commission | $62,576 | Highway Planning and Construction Maintenenace Resurfacing - Chip seal | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $61,671 | Highway Planning and Construction Railing and beam repair, riprap placement | Federal Highway Administration | 4/03/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $61,606 | Highway Planning and Construction Hot mix asphalt suracfing of existing gravel car pool lot | Federal Highway Administration | 4/17/2009 |
INGHAM COUNTY ROAD COMMISSION | $60,720 | Highway Planning and Construction Maintenenace Resurfacing - Chip seal | Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $60,073 | Highway Planning and Construction Hot mix asphalt overlay | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $59,095 | Highway Planning and Construction Guardrail and maintenance strip replacement | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $57,919 |
Highway Planning and Construction Hot mix asphalt paving and reconstruction, guardrail and pavement marking
This spending item is part of a $130,000 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $52,830 | Highway Planning and Construction Hot mix asphalt overlay and pavement marking | Federal Highway Administration | 9/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $52,000 | Highway Planning and Construction Hot mix asphalt cold milling and resurfacing, sidewalk ramps and earthwork | Federal Highway Administration | 7/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $52,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $50,000 | Highway Planning and Construction Hot mix asphalt surfacing including sidewalk | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $50,000 | Highway Planning and Construction Hot mix asphalt intersection construction, machine grading, aggregate base, curb and gutter and slope restoration | Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $50,000 | Highway Planning and Construction Hot mix asphalt overlay, cold milling, and aggregate shoulders | Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $50,000 | Highway Planning and Construction Streetscape | Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $47,000 | Highway Planning and Construction Resurface | Federal Highway Administration | 2/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $46,697 | Highway Planning and Construction Cold mill, HMA resurfacing | Federal Highway Administration | 4/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $44,290 | Highway Planning and Construction HMA ultra-thin overlay | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $43,028 | Highway Planning and Construction Resurface, curb & gutter | Federal Highway Administration | 9/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $42,937 |
Highway Planning and Construction Hot mix asphalt overlay and gravel shoulder restoration
This spending item is part of a $49,377 allocation.
See details
|
Federal Highway Administration | 9/02/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $42,626 | Highway Planning and Construction Cold milling hot mix asphalt and resurfacing, storm sewer, concrete pavement, sidewalk ramps, fire hydrant, signing | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $40,096 | Highway Planning and Construction Hot mix asphalt ultra-thin overlay, aggregate shoulder, culverts, and pavement markings | Federal Highway Administration | 9/02/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $39,748 | Highway Planning and Construction Overband crack fill | Federal Highway Administration | 2/17/2010 |
CAPITAL AREA TRANSPORTATION AUTHORITY | $36,907 |
Formula Grants for Other Than Urbanized Areas This grant provides funds for operating assistance, replacement vehicles which have reached their useful life and have no other source of funding, equipment purchases, facility improvement/greening projects identified by energy audits funded in the ARRA P P... Show more
This spending item is part of a $12,443,615 allocation.
See details
|
Federal Transit Administration | 3/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $36,511 | Highway Planning and Construction Installation of chain link fence including fenced gate and tower grounding for 5 tower locations. | Federal Highway Administration | 8/17/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $36,218 | Highway Planning and Construction Pavement marking | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $35,539 | Highway Planning and Construction Hot mix asphalt surfacing | Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $34,356 | Highway Planning and Construction Pavement marking | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $34,100 | Highway Planning and Construction resurface | Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $29,102 |
Highway Planning and Construction Hot mix asphalt cold milling and resurfacing
This spending item is part of a $33,153 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $27,945 | Highway Planning and Construction Hot mix asphalt overlay | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $27,220 | Highway Planning and Construction Crack Seal | Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $26,107 | Highway Planning and Construction Ultra thin overlay. | Federal Highway Administration | 12/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $25,775 | Highway Planning and Construction Bituminous crack treatment | Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $23,634 | Highway Planning and Construction Single course chip seal | Federal Highway Administration | 11/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $23,000 | Highway Planning and Construction Hot mix asphalt base crushing and shaping, tree removal, drainage, earthwork, slope restoration. | Federal Highway Administration | 3/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $22,729 | Highway Planning and Construction Hot mix asphalt surfacing existing car pool lot | Federal Highway Administration | 4/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $19,199 | Highway Planning and Construction Resurface | Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $17,931 | Highway Planning and Construction Mill and resurface | Federal Highway Administration | 9/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $14,441 | Highway Planning and Construction Hot mix asphalt overlay, cold milling, and pavement marking | Federal Highway Administration | 9/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $9,047 | Highway Planning and Construction Culvert rehabilitation | Federal Highway Administration | 4/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $5,384 | Highway Planning and Construction Overband crack fill | Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $913 |
Formula Grants for Other Than Urbanized Areas This grant provides funds for replacement vehicles which have reached their useful life and have no other source of funding, equipment purchases, facility renovations to improve safety and/or meet ADA requirements, continuation facility projects, one facici... Show more
This spending item is part of a $13,343,514 allocation.
See details
|
Federal Transit Administration | 8/26/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $500 |
Highway Planning and Construction Aggregate Shoulder Resurfacing
This spending item is part of a $91,771 allocation.
See details
|
Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $500 |
Highway Planning and Construction Crack Filling and Chipseal
This spending item is part of a $52,633 allocation.
See details
|
Federal Highway Administration | 8/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $500 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $42,260 allocation.
See details
|
Federal Highway Administration | 12/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $500 |
Highway Planning and Construction Culvert replacement
This spending item is part of a $36,296 allocation.
See details
|
Federal Highway Administration | 2/24/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $93,792 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $93,591 allocation.
See details
|
Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal
This spending item is part of a $75,560 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $91,004 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Airport Improvement Program Airport Development
This spending item is part of a $200,000 allocation.
See details
|
Federal Aviation Administration | 6/16/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $69,889 allocation.
See details
|
Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $83,859 allocation.
See details
|
Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $89,166 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal
This spending item is part of a $38,424 allocation.
See details
|
Federal Highway Administration | 7/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface
This spending item is part of a $50,000 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $87,279 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurfacing -Chip and Seal
This spending item is part of a $94,000 allocation.
See details
|
Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Hot mix asphalt base crushing and shaping, resurfacing, trenching and aggregate shoulders.
This spending item is part of a $68,355 allocation.
See details
|
Federal Highway Administration | 8/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Hot mix asphalt overlay and pavement marking
This spending item is part of a $244,861 allocation.
See details
|
Federal Highway Administration | 8/19/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $73,501 allocation.
See details
|
Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $68,699 allocation.
See details
|
Federal Highway Administration | 7/24/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $32,041 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Crack seal, chip seal
This spending item is part of a $49,700 allocation.
See details
|
Federal Highway Administration | 8/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Crack seal
This spending item is part of a $82,098 allocation.
See details
|
Federal Highway Administration | 8/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Crack seal, chip seal
This spending item is part of a $59,628 allocation.
See details
|
Federal Highway Administration | 8/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $79,183 allocation.
See details
|
Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $85,500 allocation.
See details
|
Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Crack Fill
This spending item is part of a $13,055 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $73,916 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $82,516 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal - Maintenance resurfacing
This spending item is part of a $94,000 allocation.
See details
|
Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $91,940 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Reconstruct
This spending item is part of a $13,248 allocation.
See details
|
Federal Highway Administration | 8/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $67,369 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal
This spending item is part of a $31,578 allocation.
See details
|
Federal Highway Administration | 7/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $93,388 allocation.
See details
|
Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface
This spending item is part of a $47,551 allocation.
See details
|
Federal Highway Administration | 8/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface
This spending item is part of a $20,000 allocation.
See details
|
Federal Highway Administration | 7/08/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and Seal
This spending item is part of a $27,500 allocation.
See details
|
Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip Seal
This spending item is part of a $61,948 allocation.
See details
|
Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $91,506 allocation.
See details
|
Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Maintenenace Resurfacing - Chip seal
This spending item is part of a $60,365 allocation.
See details
|
Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $80,716 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $80,000 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $77,154 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $93,591 allocation.
See details
|
Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $27,766 allocation.
See details
|
Federal Highway Administration | 5/14/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $35,366 allocation.
See details
|
Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Sealcoat existing surface
This spending item is part of a $65,956 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $44,313 allocation.
See details
|
Federal Highway Administration | 5/28/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $89,005 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $85,000 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction single course chip seal
This spending item is part of a $80,000 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $93,367 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $80,000 allocation.
See details
|
Federal Highway Administration | 7/07/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $57,378 allocation.
See details
|
Federal Highway Administration | 6/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $77,650 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $64,626 allocation.
See details
|
Federal Highway Administration | 7/20/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $85,200 allocation.
See details
|
Federal Highway Administration | 6/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal
This spending item is part of a $11,715 allocation.
See details
|
Federal Highway Administration | 7/09/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 | Highway Planning and Construction Hot mix asphalt resurfacing, including cold milling, concrete curb and gutter, and concrete sidewalk and ramps. This project was deobligated and withdrawn, therefore no reporting responsibility is assumed. | Federal Highway Administration | 9/30/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal
This spending item is part of a $68,535 allocation.
See details
|
Federal Highway Administration | 6/30/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Pavement Symbols
This spending item is part of a $80,033 allocation.
See details
|
Federal Highway Administration | 8/13/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Aggregate Shoulder Resurfacing
This spending item is part of a $91,680 allocation.
See details
|
Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Crack seal, chip seal
This spending item is part of a $43,026 allocation.
See details
|
Federal Highway Administration | 7/29/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction crack seal, chip seal
This spending item is part of a $48,887 allocation.
See details
|
Federal Highway Administration | 8/04/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Recovery Act of 2009: Capital Improvement and Maintenance Design, project management, and testing of offshore wharf for cruise ships and other transient vessels visiting Detroit.
This spending item is part of a $599,205 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Recovery Act of 2009: Capital Improvement and Maintenance Design, project management, and testing of building expansion of port terminal for cruise ships and other transient vessels visiting Detroit.
This spending item is part of a $210,250 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction ARRA funds will be used for the expansion of a passenger ship terminal facility building in the City of Detroit.
This spending item is part of a $1,000,000 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Partial obligation of funds for the pre-construction services by a contractor for a project that will build a wharf for the Detroit Wayne County Port Authority. The remaining funds will be obligated for construction after plans and specs have been develo
This spending item is part of a $5,305,000 allocation.
See details
|
Federal Highway Administration | 11/18/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $68,200 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $34,600 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $66,400 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $93,367 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $65,000 allocation.
See details
|
Federal Highway Administration | 11/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $89,005 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface Aggregate Shoulders
This spending item is part of a $93,904 allocation.
See details
|
Federal Highway Administration | 9/01/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Sealcoat existing surface
This spending item is part of a $65,956 allocation.
See details
|
Federal Highway Administration | 6/02/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurfacing -Chip and Seal
This spending item is part of a $94,000 allocation.
See details
|
Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Chip and seal - Maintenance resurfacing
This spending item is part of a $94,000 allocation.
See details
|
Federal Highway Administration | 5/05/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Maintenenace Resurfacing - Chip seal
This spending item is part of a $62,576 allocation.
See details
|
Federal Highway Administration | 5/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Bridge replacement
This spending item is part of a $87,617 allocation.
See details
|
Federal Highway Administration | 9/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Aggregate Shoulder Resurfacing
This spending item is part of a $91,271 allocation.
See details
|
Federal Highway Administration | 5/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $71,300 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $20,683 allocation.
See details
|
Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal Coat
This spending item is part of a $67,457 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $47,180 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $79,300 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $76,440 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Seal coat
This spending item is part of a $59,000 allocation.
See details
|
Federal Highway Administration | 11/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 | Highway Planning and Construction Micro-resurfacing. This project was deobligated and withdrawn. | Federal Highway Administration | 9/30/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Aggregate Shoulder
This spending item is part of a $11,952 allocation.
See details
|
Federal Highway Administration | 12/11/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Repave to improve ride quality and make the road smoother.
This spending item is part of a $11,000 allocation.
See details
|
Federal Highway Administration | 10/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Reconstruct.
This spending item is part of a $20,253 allocation.
See details
|
Federal Highway Administration | 10/23/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $66,000 allocation.
See details
|
Federal Highway Administration | 11/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $70,000 allocation.
See details
|
Federal Highway Administration | 11/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $80,993 allocation.
See details
|
Federal Highway Administration | 11/10/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Shoulder paving project on County Road 442 in Schoolcraft County.
This spending item is part of a $94,000 allocation.
See details
|
Federal Highway Administration | 10/21/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $86,117 allocation.
See details
|
Federal Highway Administration | 12/22/2009 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Federal Transit_Formula Grants This FY 2009 Section 5307 Recovery Act grant was submitted by the Michigan Department of Transportation (MDOT) in the amount of $531,429. The grant funds are used by three transit agencies in the State of Michigan for the purchase and installation of min
This spending item is part of a $531,429 allocation.
See details
|
Federal Transit Administration | 3/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Culvert replacement
This spending item is part of a $59,083 allocation.
See details
|
Federal Highway Administration | 2/09/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $32,385 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface
This spending item is part of a $82,600 allocation.
See details
|
Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 | Highway Planning and Construction Culvert lining | Federal Highway Administration | 2/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Formula Grants for Other Than Urbanized Areas This grant provides funds for replacement vehicles which have reached their useful life and expansion vehicles which will be used to meet the increased transportation needs in local communities, equipment purchases, and facility renovation projects to impmp... Show more
This spending item is part of a $524,072 allocation.
See details
|
Federal Transit Administration | 3/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single Course Chip Seal
This spending item is part of a $51,386 allocation.
See details
|
Federal Highway Administration | 2/09/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single chip seal
This spending item is part of a $75,047 allocation.
See details
|
Federal Highway Administration | 2/19/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 | Highway Planning and Construction This award was deobligated, therefore no reporting requirements are assumed. | Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Formula Grants for Other Than Urbanized Areas This grant provides funds for operating assistance, replacement vehicles which have reached their useful life and have no other source of funding, equipment purchases, facility improvement/greening projects identified by energy audits funded in the ARRA P P... Show more
This spending item is part of a $12,443,615 allocation.
See details
|
Federal Transit Administration | 3/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $55,732 allocation.
See details
|
Federal Highway Administration | 2/23/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $70,877 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $65,887 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $88,090 allocation.
See details
|
Federal Highway Administration | 1/27/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Culvert replacement
This spending item is part of a $55,413 allocation.
See details
|
Federal Highway Administration | 2/09/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $47,666 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $53,622 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $41,934 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface
This spending item is part of a $40,600 allocation.
See details
|
Federal Highway Administration | 1/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $71,993 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single chip seal
This spending item is part of a $9,600 allocation.
See details
|
Federal Highway Administration | 2/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Single course chip seal
This spending item is part of a $36,397 allocation.
See details
|
Federal Highway Administration | 2/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Culvert replacement
This spending item is part of a $20,945 allocation.
See details
|
Federal Highway Administration | 2/17/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Joint, base repair, HMA
This spending item is part of a $50,000 allocation.
See details
|
Federal Highway Administration | 2/08/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Capital Assistance Program for Reducing Energy Consumption and Greenhouse Gas Emissions This FY 2009 Transit Investment for Greenhouse Gas and Energy Reduction (TIGGER), Recovery Act grant was submitted by the Michigan Department of Transportation (MDOT) on behalf of Thunder Bay Transportation Authorority (TBTA) in the State of Michigan, for t... Show more
This spending item is part of a $2,590,000 allocation.
See details
|
Federal Transit Administration | 3/03/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Culvert replacement
This spending item is part of a $24,610 allocation.
See details
|
Federal Highway Administration | 2/09/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface
This spending item is part of a $17,000 allocation.
See details
|
Federal Highway Administration | 6/10/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants City of Battle Creek intermodal station renovations. The existing building will be reinvigorated by reallocating space to undersized areas and giving the station a new interior and exterior look. The interioror areas will be reorganized to better reflect ... Show more
This spending item is part of a $3,620,552 allocation.
See details
|
Federal Railroad Administration | 8/31/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Resurface, Crack Fill and Chip
This spending item is part of a $94,000 allocation.
See details
|
Federal Highway Administration | 8/18/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Dock modifications to the existing docks for the St. Mary's River Ferry System (Drumond Island, Sugar Island, Neebish Island and Mainland docks). Work to be performed includes construction engineering and construction, oversite and inspection; and all ne
This spending item is part of a $1,175,000 allocation.
See details
|
Federal Highway Administration | 7/12/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
Highway Planning and Construction Culvert Replacement
This spending item is part of a $32,786 allocation.
See details
|
Federal Highway Administration | 7/30/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 | Highway Planning and Construction Trenching, cold milling, and hot mix asphalt paving. This project was not awarded to the Michigan Department of Transportation (100% Local ARRA Federal Lands award), therefore no reporting responsibilty is assumed. | Federal Highway Administration | 9/30/2010 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants This project will relocate the underutlized Amtrak station in Birmingham, MI to a more accessible site. This facility will be located 1,200 feet south in the City of Troy. The Troy Multimodal Transit Facilityty will service both communities by strengtheni... Show more
This spending item is part of a $8,485,212 allocation.
See details
|
Federal Railroad Administration | 10/01/2011 |
TRANSPORTATION, MICHIGAN DEPARTMENT OF | $0 |
High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants City of Dearborn will consolidate two existing station into a single facility on a site that will increase pedestian accessibility to the West Downtown District and support intermodal connectivity.The project w will increase passenger-handling capacity thro... Show more
This spending item is part of a $28,204,450 allocation.
See details
|
Federal Railroad Administration | 8/04/2011 |