Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Macomb County, Mich., funds by Army, Department of

Listing $43,184,688.00 in stimulus funds from Army, Department of for Macomb

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
WALSH CONSTRUCTION COMPANY $14,541,818 TAS::21 2041::TAS Design/Build Ground Systems Power and Energy Laboratory Facility, Detroit Arsenal Tank Plant, Warren, MI. Project No.: 59386. U.S. Army Corps of Engineers, except civil program financing 7/22/2009
FIELD SUPPORT SERVICES INC. $8,748,000 FUEL EFFICIENT GROUND DEMONSTRATOR PROGRAM U.S. Army Tank-Auto. & Armament Command (TACOM) 8/27/2009
WORLD TECHNICAL SERVICES INC $8,670,000 R&D Contract to develop Fuel Efficient Ground Vehicle Demonstrator (FED) design and fabrication.
This spending item is part of a $8,748,000 allocation. See details
Army, Department of 8/27/2009
ATLANTIC MARINE CONSTRUCTION COMPANY, INC. $2,774,644 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
J PEREZ CONSTRUCTION INC $671,950 DESIGN-BUILD FITNESS CENTER, REPAIR AND RECONFIGURE OF ADJACENT HALLWAY. WORK INCLUDES STRUCTURAL STEEL FRAMING, MASONRY, FOUNDATION, MEMBRANE ROOFING, UNDERGROUND UTILITIES, MECHANICAL (HEATING, VENTILATION, AIR CONDITIONING, TEMPERATURE CONTROLS, INSULA Army, Department of 9/28/2010
CHRISTIAN CONCEPTS CONSTRUCTION, INC. $466,040 site improvements Army, Department of 3/29/2010
FUTURENET GROUP, INC. $462,639 Detroit Arsenal, Provide and Install East Side Water Main to Feed Under Capacity Fire Lines and Buildings 201, 203, 249
This spending item is part of a $464,439 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 6/16/2010
Okaw Truss, Inc. $460,155 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
PONTIAC DRYWALL SYSTEMS INC. $448,147 REPAIR ROADS AND CONSTRUCT ORGANIZATIONAL PARKING LOCATED AT DETROIT ARSENAL, WARREN MI
This spending item is part of a $1,035,929 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/26/2010
ASPHALT SPECIALISTS, INC. $444,415 REPAIR ROADS AND CONSTRUCT ORGANIZATIONAL PARKING LOCATED AT DETROIT ARSENAL, WARREN MI
This spending item is part of a $1,035,929 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/26/2010
CHRISTIAN CONCEPTS CONSTRUCTION, INC. $424,860 revise bldg. entryway with secured access, parking & landscape upgrades. Army, Department of 3/29/2010
HDR ARCHITECTURE, INC. $406,291 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
R R D Construction Company $377,348 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
ROCK INDUSTRIES, INC. $369,788 The overall scope of this project is to design and install a new energy efficient HVAC system to replace the existing system. The system includes new rooftop mechanical units and reconfiguration of existing rooftop units, updated control wiring and a mech Army, Department of 12/30/2009
J PEREZ CONSTRUCTION INC $325,000 RENOVATION OF THREE SPACES. WORK INCLUDES REMOVAL OF WALLS, DOORS, AND DUCT WORK. DESIGN-BUILD SERVICES TO PROVIDE ARCHITECTURAL, STRUCTURAL, MECHANICAL (INSULATION, TEMPERATURE CONTROLS), ELECTRICAL, COMMUNICATIONS (TELEPHONE AND DATA LINES), FIRE PROTEC Army, Department of 9/30/2009
KATIE CROOKS, INC. $269,274 Design & Install canopy at the Eleven Mile gate Entrance
This spending item is part of a $625,271 allocation. See details
Army, Department of 9/17/2009
TETRA TECH/POND & COMPANY $259,045 P&D AE Detroit road repairs, eastside water main, and Detroit electric cables proejct at Detroit Arsenal, Warren, MI U.S. Army Corps of Engineers, except civil program financing 7/17/2009
ROSS AND BARR, INC. $225,000 Design & Install canopy at the Eleven Mile gate Entrance
This spending item is part of a $625,271 allocation. See details
Army, Department of 9/17/2009
KATIE CROOKS, INC. $207,831 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
STRYKER-STE LLC $183,318 Convert Communication Room to Secure Briefing Room, B230 - 1st Floor Army, Department of 8/24/2009
ROCK INDUSTRIES, INC. $181,612 The Purpose of this project is to safely manage vehicular traffic by use of automatic traffic signals. The traffic signals will allow for traffic regulation resulting in the ability for employees and visitors to safely enter/exit the Mound Road entrance. Army, Department of 9/30/2009
ROCK INDUSTRIES, INC. $181,612 The Purpose of this project is to safely manage vehicular traffic by use of automatic traffic signals. The traffic signals will allow for traffic regulation resulting in the ability for employees and visitors to safely enter/exit the Mound Road entrance. Army, Department of 9/30/2009
CHRISTIAN CONCEPTS CONSTRUCTION, INC. $175,353 Replace rusted cooling tower B200C Army, Department of 6/10/2010
STRYKER-STE LLC $174,606 Reconfigure Department of Public Works Administrative Spaces, Bldg-205 Army, Department of 9/28/2009
STRYKER-STE LLC $174,606 Reconfigure Department of Public Works Administrative Spaces in Building 205 Army, Department of 9/28/2009
CHRISTIAN CONCEPTS CONSTRUCTION, INC. $159,059 capacitors-electrical distribution system Army, Department of 3/29/2010
BUTCHER & BAECKER CONSTRUCTION COMPANY, INC. $149,920 Upgrade Bathrooms Building 200C. The contractor shall provide all labor and materials for the project, Renovation of Restrooms, Building 200-A/C, IAW the statement of work, specifications and the drawings PE-X-200C-652, dated 15 June 2009. The work incl Army, Department of 8/17/2009
SITE DEVELOPMENT, INC. $143,367 REPAIR ROADS AND CONSTRUCT ORGANIZATIONAL PARKING LOCATED AT DETROIT ARSENAL, WARREN MI
This spending item is part of a $1,035,929 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/26/2010
Oakland Plumbing Company $137,567 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
ROCK INDUSTRIES, INC. $112,979 Install a new heavy-duty Barrier Gate Arm in the Main Truck Inspection Lane. This will result in a more secure base as trucks must stop at the barracade for inspection. Army, Department of 9/15/2009
KATIE CROOKS, INC. $105,362 Design & Install New Roof with photovotaic system on the extension to the Visitor Center. This project is being designed in conjunction with our order no. 0026 for same contract number to provide a 15kw solar array along with a new canopy.
This spending item is part of a $118,500 allocation. See details
Army, Department of 9/15/2009
CHRISTIAN CONCEPTS CONSTRUCTION, INC. $101,652 re-configure and install new light fixtures Army, Department of 6/10/2010
CHRISTIAN CONCEPTS CONSTRUCTION, INC. $100,980 Install occupancy sensors in bldg. 230 Army, Department of 6/10/2010
Control Rite Inc $99,682 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
PUMA & SONS, INC $74,937 Design & Install canopy at the Eleven Mile gate Entrance
This spending item is part of a $625,271 allocation. See details
Army, Department of 9/17/2009
Kelley Brothers LLC $68,850 Install Rooftop A/C - Battery Rm, Bldg 200A IAW
This spending item is part of a $93,340 allocation. See details
Army, Department of 6/10/2010
Hicks Masonry Company, L.L.C. $37,298 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
BUTCHER & BAECKER CONSTRUCTION COMPANY, INC. $35,858 Furnish labor and equipment to construct a vestibule enclosure at the North enterance of Buiding 203 at the Detroit Arsenal. Construct a concrete slab and assemble a manufactured vestibule kit on site. Work also includes excavation, seeding, interior el Army, Department of 6/10/2010
KATECH, INC. $33,563 Award was given to replace 2 4 stroke outboard motors on a boat on the Mohawk dam, including testing and delivery. We also supplied two spares to the Dover Dam U.S. Army Corps of Engineers, except civil program financing 7/23/2009
AMERICAN FENCE & SUPPLY CO., INC. $30,435 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
CASADEI STRUCTURAL STEEL, INC. $29,500 In support of the US Army Corps of Engineers Louisville District Military Construction Recovery Act program, design/build an addition to the Child Development Center at the Detroit Arsenal Tank Plant, Warren MI project NoG?.33447 in the amount of 4,198,8
This spending item is part of a $4,215,940 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2011
KATIE CROOKS, INC. $21,979 Replacement of Cooling water and condensate pump motors in the basement of bldg. 212 at TACOM, Warren, Mi.
This spending item is part of a $116,666 allocation. See details
Army, Department of 8/20/2009
LUTZ ROOFING COMPANY, INC. $18,900 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
MCC CONSTRUCTION CORP $18,540 Install Rooftop A/C - Battery Rm, Bldg 200A IAW
This spending item is part of a $93,340 allocation. See details
Army, Department of 6/10/2010
KATIE CROOKS, INC. $17,500 Design & Install Complete free cooling system in existing loop for 200 Ton Trane Electric Chiller and its associated Cooling Tower & Pumps
This spending item is part of a $139,500 allocation. See details
Army, Department of 8/25/2009
Advantage Electric & Controls, Inc. $16,490 Install an operating Facility Management & Control System utilizing Network Area Controller (s) and Direct Digital Controls to communicate with Detroit Arsenals TRIDIUM based Energy Management Systemthrough the Lon Works LAN System
This spending item is part of a $124,786 allocation. See details
Army, Department of 9/28/2009
Advantage Electric & Controls, Inc. $13,138 Design & Install New Roof with photovotaic system on the extension to the Visitor Center. This project is being designed in conjunction with our order no. 0026 for same contract number to provide a 15kw solar array along with a new canopy.
This spending item is part of a $118,500 allocation. See details
Army, Department of 9/15/2009
Le Mieux Plumbing & Specialties Inc $9,447 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
KATIE CROOKS, INC. $5,862 Install adaptors on existing restroom faucets to at Detroit Arsenal to attain a maximum flow of 1 gpm only. Army, Department of 8/12/2009
Acoustical Ceiling Contractors Inc $4,867 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
Michigan Fence & Supply Co Inc $3,160 Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation. See details
Army, Department of 9/16/2009
Kinnee Electric, Inc $2,800 Install Rooftop A/C - Battery Rm, Bldg 200A IAW
This spending item is part of a $93,340 allocation. See details
Army, Department of 6/10/2010
KATIE CROOKS, INC. $2,696 Install an operating Facility Management & Control System utilizing Network Area Controller (s) and Direct Digital Controls to communicate with Detroit Arsenals TRIDIUM based Energy Management Systemthrough the Lon Works LAN System
This spending item is part of a $124,786 allocation. See details
Army, Department of 9/28/2009
Silverado Construction Inc $1,950 Install Rooftop A/C - Battery Rm, Bldg 200A IAW
This spending item is part of a $93,340 allocation. See details
Army, Department of 6/10/2010
Accurate Painting Company $1,800 Detroit Arsenal, Provide and Install East Side Water Main to Feed Under Capacity Fire Lines and Buildings 201, 203, 249
This spending item is part of a $464,439 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 6/16/2010
A R Decker & Associates $1,000 Install Rooftop A/C - Battery Rm, Bldg 200A IAW
This spending item is part of a $93,340 allocation. See details
Army, Department of 6/10/2010
ROYAL ROOFING CO., INC. $200 Install Rooftop A/C - Battery Rm, Bldg 200A IAW
This spending item is part of a $93,340 allocation. See details
Army, Department of 6/10/2010