St. Clair County, Mich., funds by Army, Department of
Listing $323,455.00 in stimulus funds from Army, Department of for St. Clair
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
Mechanical Control Systems, Inc. | $122,000 |
Design & Install Complete free cooling system in existing loop for 200 Ton Trane Electric Chiller and its associated Cooling Tower & Pumps
This spending item is part of a $139,500 allocation.
See details
|
Army, Department of | 8/25/2009 |
Mechanical Control Systems, Inc. | $105,600 |
Install an operating Facility Management & Control System utilizing Network Area Controller (s) and Direct Digital Controls to communicate with Detroit Arsenals TRIDIUM based Energy Management Systemthrough the Lon Works LAN System
This spending item is part of a $124,786 allocation.
See details
|
Army, Department of | 9/28/2009 |
Mechanical Control Systems, Inc. | $50,000 |
Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation.
See details
|
Army, Department of | 9/16/2009 |
General Maintenance | $19,295 |
Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation.
See details
|
Army, Department of | 9/16/2009 |
Ferguson Steel, Inc. | $13,400 |
Design Build Services to Reconfigure Office Space for Garrison Missions a 1350 sq. ft. administrative building addition to bldg. 232 to improve accessibility to services for military & civilian customers which the U.S. Army Detroit Arsenal support.
This spending item is part of a $524,565 allocation.
See details
|
Army, Department of | 9/16/2009 |
General Maintenance | $13,160 |
Design & Install canopy at the Eleven Mile gate Entrance
This spending item is part of a $625,271 allocation.
See details
|
Army, Department of | 9/17/2009 |