Wayne County, Mich., funds by General Services Administration
Listing $240,081,635.56 in stimulus funds from General Services Administration for Wayne
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
GENERAL MOTORS LLC | $104,432,100 | Supply commercial passenger sedans, Light-duty Trucks (4X2, 4X4), Station Wagons, and Alternative Fuel Vehicles (AFVs) | General Services Administration | 4/13/2009 |
FORD MOTOR COMPANY | $55,823,066 | Quantity of 4199 SEDAN, SUBCOMPACT, 4 PASSENGER, 4 DOOR | General Services Administration | 6/02/2009 |
FORD MOTOR COMPANY | $13,214,067 | Quantity of 930 4X2 PICKUP, FULL SIZE, REGULAR CAB, MIN 60500 LBS GVWR | General Services Administration | 6/02/2009 |
CLARK CONSTRUCTION GROUP, LLC | $9,274,887 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
CLARK CONSTRUCTION GROUP, LLC | $5,579,693 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
MOTOR CITY ELECTRIC CO / HENDERSON ELECTRIC - A JOINT VENTURE | $5,539,619 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
JOHN E. GREEN COMPANY | $4,851,686 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
SMITHGROUP, INC. | $4,168,914 |
Design task order related to the Federal Bureau of Investigation Office build out and fire alarm replacement
This spending item is part of a $4,181,414 allocation.
See details
|
Public Buildings Service | 6/18/2009 |
MOTOR CITY ELECTRIC CO / HENDERSON ELECTRIC - A JOINT VENTURE | $3,906,755 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
500 WOODWARD LLC | $3,632,825 | 81413 square feet leased to the GSA at 500 Woodward Ave in Detroit, MI 48226. Provided by ARRA funds | Public Buildings Service | 8/10/2010 |
500 WOODWARD LLC | $3,632,825 | 81,413 square feet leased to GSA at 500 Woodward Avenue in Detroit Michigan provided by ARRA fund. | Public Buildings Service | 8/10/2010 |
JOHN E. GREEN COMPANY | $3,508,533 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
PONTIAC DRYWALL SYSTEMS INC. | $2,428,117 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
BCI, INCORPORATED | $2,106,696 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
JAC CONSTRUCTION, LLC | $1,413,705 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
DAVIS IRON WORKS, INC. | $1,048,938 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
JACOBS PROJECT MANAGEMENT CO. | $986,999 |
This contract is an agency Construction Management contract providing services to augment GSA internal technical staff. Construction work packages for this project are being delivered under a separate contract with an at-risk Construction Manager who will
This spending item is part of a $1,011,999 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
BLUE STAR, INC. | $928,256 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
GREAT LAKES HOTEL SUPPLY CO | $909,745 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
COMPLETE QUALITY INSTALLATION SERVICES INC | $846,448 | This award will provide Physical Relocation Services to relocate seven federal government agencies out of their existing occupancies into either new space within the Patrick V. McNamara Federal Building (PVM) or into permanent lease space within the Detro | Public Buildings Service | 7/30/2010 |
WOLVERINE STONE CO. | $777,240 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
Office Environments, Inc. | $736,011 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
ALLIED MECHANICAL SERVICES, INC. | $711,335 |
This project was awarded to conduct building automation system upgrades at the Theodore Levin Federal Building and United States Courthouse in Detroit, Michigan. This building is a 700,000 square foot 10 story building. The scope of work for this project
This spending item is part of a $862,141 allocation.
See details
|
Public Buildings Service | 12/09/2009 |
FORD MOTOR LAND DEVELOPMENT CORPORATION | $675,150 | Tenant Improvement Project at Fairlane Office Center Suite 451, Dearborn, Michigan | Public Buildings Service | 6/15/2010 |
BLUE STAR, INC. | $638,941 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
Office Environments, Inc. | $564,866 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
CARTER GROUP, INC., THE | $547,678 | Move Management and Related Services associated with the Patrick V. McNamara ARRA project, Detroit, MI | Public Buildings Service | 3/12/2010 |
SHAMBAUGH & SON, L.P. | $455,192 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
LA FORCE, INC. | $442,756 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
VICTOR PARK INVESTMENTS, LLC | $441,390 | 5 Years Leased Premises plus Build out GS-05B-18443 located at 19575 Victor Parkway, Suite 150, West Bloomfield, MI | Office of Inspector General | 7/15/2010 |
LA FORCE, INC. | $436,328 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
JAC CONSTRUCTION, LLC | $395,648 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
GHAFARI ASSOCIATES, L.L.C. | $359,345 |
Building Information Model support and mechanical and electrical rennovations to an existing federal office building in Jackson MS
This spending item is part of a $6,552,255 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
ASTIC SIGNALS DEFENSES LLC | $320,805 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
CITY MAINTENANCE, LLC | $309,078 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
BCI, INCORPORATED | $299,113 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
EMPIRE TILE COMPANY INCORPORATED | $237,480 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
RAYHAVEN GROUP, INC. | $225,244 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
CITY MAINTENANCE, LLC | $215,788 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
SLIFCO ELECTRIC LLC | $183,851 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
BRUNT ASSOCIATES, INC. | $166,843 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
DAVIS IRON WORKS, INC. | $166,799 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
STENCO CONSTRUCTION COMPANY, L.L.C. | $157,542 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
FREDERICK CONSTRUCTION, INC. | $150,806 |
This project was awarded to conduct building automation system upgrades at the Theodore Levin Federal Building and United States Courthouse in Detroit, Michigan. This building is a 700,000 square foot 10 story building. The scope of work for this project
This spending item is part of a $862,141 allocation.
See details
|
Public Buildings Service | 12/09/2009 |
BRUNT ASSOCIATES, INC. | $149,925 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
WOLVERINE STONE CO. | $129,886 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
211 FORT WASHINGTON ASSOCIATES LLC | $127,660 | Work in being done at the 211 Fort building in Detroit Michigan using the American Recovery Lease Award | Public Buildings Service | 7/30/2010 |
DAVIS IRON WORKS, INC. | $126,953 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
RAM CONSTRUCTION SERVICES OF MICHIGAN, INC. | $101,221 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
SCHINDLER ELEVATOR CORPORATION | $99,553 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
GARLAND COMPANY INC, THE | $97,364 |
This award supports energy conservation activities at the Rosa Parks Federal Building in Detriot, Michigan by replacing the existing roof with a modified bitumen/ white roofing system. This award will result in reduced energy consumption. Roof to be rep
This spending item is part of a $184,336 allocation.
See details
|
Public Buildings Service | 12/10/2009 |
MOLNAR, WILLIAM ROOFING, INC | $86,972 |
This award supports energy conservation activities at the Rosa Parks Federal Building in Detriot, Michigan by replacing the existing roof with a modified bitumen/ white roofing system. This award will result in reduced energy consumption. Roof to be rep
This spending item is part of a $184,336 allocation.
See details
|
Public Buildings Service | 12/10/2009 |
ASTIC SIGNALS DEFENSES LLC | $82,841 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
RAYHAVEN GROUP, INC. | $80,920 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
FORD MOTOR COMPANY | $75,592 | 1 Fusion Hybrid, 2 Escape Hybrids | General Services Administration | 6/02/2009 |
EMPIRE TILE COMPANY INCORPORATED | $71,114 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. | $65,115 | The award supports energy conservation activities at the Rosa Parks Federal Building in Detroit, Michigan. These activities include replacing water-cooled air conditioning unit with an air cooled air conditioning unit, replacing weather stripping at the | Public Buildings Service | 12/14/2009 |
FES GROUP LLC | $58,800 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
ASI SIGN SYSTEMS, INC. | $58,520 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
ASI SIGN SYSTEMS, INC. | $52,860 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. | $52,194 |
Post Construction Contract Services (PCCS) and Construction Management & Inspection Services (CM&I) related to the installation of a new building automation system. This project improves energy conservation through the following methods: (1) The replac
This spending item is part of a $95,071 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
KIRK ASSOCIATES LLC | $50,400 |
Window replacement - Fa+?ade Thermal Performance Improvement for the John F Kennedy Federal Building in Boston, Massachusetts. The work to be performed under the Contract includes updating the existing window and curtain wall replacement documents for co
This spending item is part of a $1,170,849 allocation.
See details
|
Public Buildings Service | 12/01/2009 |
Urban's Partition & Remodeling Co | $44,450 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
E A M ENGINEERS INC | $42,877 |
Post Construction Contract Services (PCCS) and Construction Management & Inspection Services (CM&I) related to the installation of a new building automation system. This project improves energy conservation through the following methods: (1) The replac
This spending item is part of a $95,071 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
Thalner Electronic Laboratories, Inc. | $40,401 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
SCHINDLER ELEVATOR CORPORATION | $39,950 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
King Masonry Inc | $38,262 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
S & M Heating Sales Company | $37,891 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
MADISON HEIGHTS GLASS COMPANY, INC. | $33,496 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
CHELSEA ARCHITECTURAL MILLWORK INC | $29,788 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
FORD MOTOR LAND DEVELOPMENT CORPORATION | $27,770 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. | $26,326 |
The designs may consist of but are not limited to the following: -- Building Automation System Upgrade Deliverables shall consist of: -- Construction drawings and specifications -- Design calculations -- Cost Estimates -- Recommended construction completi
This spending item is part of a $68,326 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
ATC GROUP SERVICES INC | $25,000 |
This contract is an agency Construction Management contract providing services to augment GSA internal technical staff. Construction work packages for this project are being delivered under a separate contract with an at-risk Construction Manager who will
This spending item is part of a $1,011,999 allocation.
See details
|
Public Buildings Service | 3/26/2010 |
PONTIAC DRYWALL SYSTEMS INC. | $24,250 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
SIMPLEXGRINNELL LP | $21,679 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
DATA SUPPLIES CO | $21,575 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
H & D LAWN MAINTENANCE, INC | $21,101 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
SLIFCO ELECTRIC LLC | $19,383 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
PAGE CONSERVATION, INC. | $18,409 | Assess conservation needs for paintings, provide recommendations for removal and storage of work during a construction project and reinstallation at a new location. Provide conservation treatment. The painting affected by this work is Boxcar Grand by Sam | Public Buildings Service | 3/31/2010 |
FINDLAY TELECOM LIMITED LLC | $15,417 | TELECOMMUNICATION SERVICES FOR ICE HIS RELOCATION AT THE PATRICK V NCNAMARA FEDERAL BUILDING, 477 MICHIGAN AVENUE, DEROIT, MICHIGANPLUS AMMENDMENT ONE RELOCATE UP TO 100 CURRENT HSI PERSONNEL TELEPHONES FROM THE 24TH FL TO THE 15TH FL. ALL HORIZONTAL | Public Buildings Service | 8/26/2011 |
CONSTRUCTION PROCESS SOLUTIONS, LTD | $14,981 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
FUTURE FENCE COMPANY | $14,618 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
ACTION FLOOR COVERING INSTALLATION, INC. | $14,441 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
JLB OF WHITMORE LAKE, INC. | $12,449 |
Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D
This spending item is part of a $31,505,158 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
RAYHAVEN GROUP, INC. | $12,149 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
C H M P INC | $10,324 | This award supports the roof replacement at the Rosa Parks Federal Building in Detroit, Michigan by providing construction management and inspection services and record documents. The replacement of the roof with a new cool white roof and increased insul | Public Buildings Service | 3/19/2010 |
ENVIRO MATRIX LAND S.E.A. CORPORATION | $9,987 |
As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M
This spending item is part of a $19,805,001 allocation.
See details
|
Public Buildings Service | 11/05/2009 |
Jiffy Signs Inc | $9,894 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
Western Mechanical Contractors, Inc. | $8,650 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
L B & B ASSOCIATES INC. | $6,490 | this award is to provide mechanical assistance in support of the Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements Project at the Patrick V. McNamara Federal Building - Ph | Public Buildings Service | 6/15/2011 |
ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. | $4,250 | Run electrical through raceway | Public Buildings Service | 11/18/2010 |
L B & B ASSOCIATES INC. | $3,209 | This award is to provide mechanical assistance in support of the Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements Project at the Patrick V. McNamara Federal Building - Ph | Public Buildings Service | 4/29/2011 |
BOOMS STONE COMPANY | $3,162 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
L B & B ASSOCIATES INC. | $2,441 | This award is to provide mechanical assistance in support of the Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements Project at the Patrick V. McNamara Federal Building - Ph | Public Buildings Service | 4/26/2011 |
MADIAS BROTHERS, INC. | $2,330 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
AMERICAN INTERIORS, INC. | $1,895 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |
L B & B ASSOCIATES INC. | $1,640 |
Provide technical support at the Theodore Levin U.S. Courthouse and Rosa Parks Federal Building for the Functional Performance Testing of the Building Automation Systems.
This spending item is part of a $4,601 allocation.
See details
|
Public Buildings Service | 11/23/2009 |
HANNAH & ASSOCIATES, INC. | $1,428 |
The Architect-Engineer (A/E) shall perform all professional services necessary for planning and designing of this project in accordance with the program and GSA standards. The professional services for this Work Order shall consist of, but not be limited
This spending item is part of a $8,769 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
SOIL AND MATERIALS ENGINEERS, INC. | $1,206 |
Window replacement - Fa+?ade Thermal Performance Improvement for the John F Kennedy Federal Building in Boston, Massachusetts. The work to be performed under the Contract includes updating the existing window and curtain wall replacement documents for co
This spending item is part of a $1,170,849 allocation.
See details
|
Public Buildings Service | 12/01/2009 |
Enrico Group Inc | $1,074 |
Tenant improvement for the General Services Administration Michigan Service Center with a total of 17,416 rentable square footage. Work included new conference, storage and file rooms, print room, IT room, reception area, break room, copy room and open a
This spending item is part of a $675,150 allocation.
See details
|
Public Buildings Service | 6/15/2010 |