Noxubee County, Miss., funds by Transportation, Department of
Listing $13,403,698.00 in stimulus funds from Transportation, Department of for Noxubee
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
TRANSPORTATION , MISSISSIPPI DEPARTMENT OF | $11,987,698 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 3/03/2009 |
SUPERIOR ASPHALT, INC. | $1,148,191 |
Roadway resurfacing, full depth construction, culvert and sign replacement and drainage improvement on Bluff Lake Road and Brooksville Louisville Road. Widening of roadway, culvert replacement, surface reconditioning and drainage improvement to Section L
This spending item is part of a $1,416,000 allocation.
See details
|
Federal Highway Administration | 6/29/2009 |
TRIANGLE MAINTENANCE SERVICE, LLC | $88,875 |
Roadway resurfacing, full depth construction, culvert and sign replacement and drainage improvement on Bluff Lake Road and Brooksville Louisville Road. Widening of roadway, culvert replacement, surface reconditioning and drainage improvement to Section L
This spending item is part of a $1,416,000 allocation.
See details
|
Federal Highway Administration | 6/29/2009 |
SIMMONS EROSION CONTROL, INC. | $80,750 |
Roadway resurfacing, full depth construction, culvert and sign replacement and drainage improvement on Bluff Lake Road and Brooksville Louisville Road. Widening of roadway, culvert replacement, surface reconditioning and drainage improvement to Section L
This spending item is part of a $1,416,000 allocation.
See details
|
Federal Highway Administration | 6/29/2009 |
J. C. CHEEK CONTRACTORS, INC. | $50,684 |
Roadway resurfacing, full depth construction, culvert and sign replacement and drainage improvement on Bluff Lake Road and Brooksville Louisville Road. Widening of roadway, culvert replacement, surface reconditioning and drainage improvement to Section L
This spending item is part of a $1,416,000 allocation.
See details
|
Federal Highway Administration | 6/29/2009 |
CROWDER ENGINEERING & SURVEYING INC | $47,500 |
Roadway resurfacing, full depth construction, culvert and sign replacement and drainage improvement on Bluff Lake Road and Brooksville Louisville Road. Widening of roadway, culvert replacement, surface reconditioning and drainage improvement to Section L
This spending item is part of a $1,416,000 allocation.
See details
|
Federal Highway Administration | 6/29/2009 |