Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Johnson County, Mo., funds by Army, Department of

Listing $8,282,157.51 in stimulus funds from Army, Department of for Johnson

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MCC CONSTRUCTION CORPORATION $6,190,238 AS A PART OF TAS::57-3404, RECOVERY PROJECT#:YWHG080024:RP#, RECOVERYPROJECT#::YWHG071010::RP#, YWHG080024 - REPAIR INEFFICIENT HVAC AND CONTROLS: 5 FACS, YWHG071010 - REPAIR INEFFICIENT HVAC IN 4 FACILITIES (EIP), DESIGN AND CONSTRUCTION FOR THE REPLACEM
This spending item is part of a $6,381,689 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/03/2010
TMG SERVICES, INC. $933,978 Repair Occupancy Sensors Multi Facility. Replace manual lighting controld with occupancy sensors. Design and construct all work associated with providing and installing new occupancy sensors in SINGLE OCCUPANT INTERIOR OFFICES Including design; removal of U.S. Army Corps of Engineers, except civil program financing 3/04/2010
FAITH TECHNOLOGIES, INC. $534,919 Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. Work involves the upgrades for Heating and Ventilation and Air Conditioning (HVAC) Whiteman Air Force Base, Missouri.
This spending item is part of a $4,662,131 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/26/2011
MCC CONSTRUCTION CORPORATION $395,529 AS A PART OF TAS::57 3404::TAS RECOVERY-YWHG080014-REPAIR DOOR SEALS AT 23 MAINT DOCKS-NRG. THE NATURE OF THE WORK ARE AS FOLLOWS: EACH HANGER DOOR LEAF AND PANEL SHALL BE WEATHERTHIGHT OVER THE ENTIRE SURFACE EXPOSED TO THE EXTERIOR, AND THE ENTIRE SURFA
This spending item is part of a $407,762 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 12/23/2009
FAR EAST CONSTRUCTION CORPORATION $191,451 AS A PART OF TAS::57-3404, RECOVERY PROJECT#:YWHG080024:RP#, RECOVERYPROJECT#::YWHG071010::RP#, YWHG080024 - REPAIR INEFFICIENT HVAC AND CONTROLS: 5 FACS, YWHG071010 - REPAIR INEFFICIENT HVAC IN 4 FACILITIES (EIP), DESIGN AND CONSTRUCTION FOR THE REPLACEM
This spending item is part of a $6,381,689 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/03/2010
FAITH TECHNOLOGIES, INC. $14,470 Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. Work involves the upgrades for Heating and Ventilation and Air Conditioning (HVAC) Whiteman Air Force Base, Missouri.
This spending item is part of a $4,662,131 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/26/2011
FAR EAST CONSTRUCTION CORPORATION $12,233 AS A PART OF TAS::57 3404::TAS RECOVERY-YWHG080014-REPAIR DOOR SEALS AT 23 MAINT DOCKS-NRG. THE NATURE OF THE WORK ARE AS FOLLOWS: EACH HANGER DOOR LEAF AND PANEL SHALL BE WEATHERTHIGHT OVER THE ENTIRE SURFACE EXPOSED TO THE EXTERIOR, AND THE ENTIRE SURFA
This spending item is part of a $407,762 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 12/23/2009
FAITH TECHNOLOGIES, INC. $9,340 Demo existing boiler controls and design/procure/install new upgraded boiler controls that are capable of remote operation. Work involves the upgrades for Heating and Ventilation and Air Conditioning (HVAC) Whiteman Air Force Base, Missouri.
This spending item is part of a $4,662,131 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 8/26/2011